Home / Essential Services / ESS-453a8f00

Essential Services

DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 7, 2004

Date
7 May 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 7, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 3570Mw, 79,680Mw hours, 7-day Avg. 3825Mw Generators Returned to Service: (0) Generators Unscheduled Out of Service (21) 855 Mw PLANT Type SP, CP, RP, HP Fault Mw * Baiji 2 SP Emergency stop-cable fire 140 Baiji 4 SP Excitor 85 Dibis 2 SP Drum Level low 8 Najebia 5 SP Thrust bearing problem 80 Mussaibe 4 SP Oil Leak 230 Baiji Mobile 2,3 CP Planned Outage 40 Baiji Mobile, 4 CP Fuel Filters 25 Doura 1,2 CP No gas pressure 40 Mosil 1 CP Rotor Defect 15 Mosil 2 CP Reverse Power 15 Mosil 9 CP Reverse Power 15 New Mulla 4 CP Unstable Load 30 Old Mulla 7 CP High exhaust temp 15 * Qudas 2 CP Combustion section cleaning 42 Taji 1,2 CP No gas pressure 30 Taji 3, CP Compressor 15 Taji 5 CP High Exhaust Temp 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1326 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M Bechtel 21 Mar 04 21 May 100 Baiji 3 SP M(Additional work) Bechtel 29 Feb 04 TBD 100 Dibis 3 SP M ME 26 Apr 04 TBD 8 Dibis 4 SP M ME 15 Mar 04 TBD 8 Doura 4 CP M ME 14 Apr 04 31 May 20 Doura 3 CP R ME 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 TBD 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 3 Jul 50 Mosil 7 CP M ME 24 Apr 04 TBD 15 Mussaibe 2 SP M (additional work) ME 28 Feb 04 20 May 200 Nassirya 1 SP M ME 30 Mar 04 15 May 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 1 CP M ME 17 Apr 04 15 May 15 Old Mulla 2 CP M ME 17 Apr 04 15 May 15 Old Mulla 8 CP M ME 17 Apr 04 TBD 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 South Baghdad 1 SP M (Awaiting parts) ME 12 Feb 04 31 May 30 South Baghdad 2 SP M (Awaiting Parts) ME 12 Feb 04 31 May 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 4 CP M GRD/RIE 21 Apr 04 15 JUL 15 Taji 7 CP R GRD/RIE 1 Oct 03 15 JUL 15 Taji 6 CP M ME 2 Apr 04 26 May 15 New In-service date LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE Complete 23 Apr Operational Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE 28 Feb 05 Start date 21 May 04 Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Foundations under construction Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 22 May Construction ongoing Dibis to Old Kirkuk 132 Reconductor GRD-RIE 31 Jul Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 5 Jul Assessment underway Jazair to Yarmook 132 Reconductor GRD-RIE 5 Jul Assessment underway Baghd West – Jamia 132 Sabotage ME TBD Old Amarah-Burzulgan 132 Looting GRD-RIE 25 Jun Assessment underway Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: No report today Power transferred from North to Middle 560 MW. Power transferred from South to Middle 260 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 975 Duhok 82 Naynawa 320 Tamim 129 Salah Aldeen 210 Anbar 185 Dyala 85 Babil 116 Kirbala 97 Najaf 90 Kadsya 95 Wasit 50 Muthana 55 Nasirya 125 Misan 70 Basra 270 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3