Home / Essential Services / ESS-4046160b

Essential Services

DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 4, 2004

Date
4 February 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 4, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 3946Mw, 86,824Mw hours, 7-day Avg. 4103 Mw Generators Returned to Service 418Mw Dibis 4 8Mw South Baghdad 4 30Mw Baiji 3 100 Mw Mussaibe 1 170 Mw Qudas 1 110 Mw Generators Unscheduled Out of Service 983 Mw PLANT Type SP, CP, RP, HP Fault Mw *Dibis 2 SP Boiler leak 8 Baiji 4 SP Boiler Leak 100 Baiji 5, SP Forced Outage (No ECD) 30 *Daura 3 SP Under Excitation 25 Daura 4 SP Turbine Vibration 25 South Baghdad 1 SP Air Heater 30 South Baghdad 2 SP Boiler Leak 30 *Nassirya 2 SP Boiler Leak 150 Najebia SP Steam Leak 90 Baiji 2, CP Lubricating oil leak 110 Baiji 1 CP High Compression Vibration 110 Mosil 1 CP Rotor Defect 15 *Mosil 3 CP Transfer Primary Protector 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 New Mulla 6 CP Generator Defect 15 Taji 3, CP Compressor 15 Taji 4 CP Combustion chamber temp. 15 Taji Mobile, 2 CP Software problem 15 Daura 4 CP Diesel trouble 50 Shuaiba 2, CP Gas Turbine Leak 80 * RED – Denotes out of service since last report Generators Scheduled Out of Service 874 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 01Mar 100 Baiji 6 SP M Bechtel 5 Dec 03 18Feb 100 Daura 3 CP R RIE/ME 1 Mar 03 TBD 20 Daura 5 SP R Bechtel Jul 03 30 Apr 100 Daura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME/Bechtel 30Dec 03 15 Feb 8 Dibis 4 CP R RIE/GRD Sep 03 30 Mar 18 Dibis 5 CP R RIE/GRD Sep 03 6 Feb 18 Hartha 4 SP M ME/Bechtel 23Oct 03 1 Feb 150 Khor Zubayr 4 CP R RIE/GRD 20Dec03 31 Jan 55 Najaf 2 CP R RIE/GRD 5 Dec 03 30 Apr 50 New Mulla 1 CP M RIE/GRD 13 Jan 04 15 Feb 30 New Mulla 4 CP M RIE/GRD 3 Jan 04 31 Mar 30 Old Mulla 5 CP M RIE/GRD 1 Nov 03 15 Feb 15 Old Mulla 10 CP M RIE/GRD 6 Jan 04 5 Feb 15 Old Mulla 12 CP R RIE/GRD 1 Oct 03 TBD 15 South Baghdad 5 SP M ME/Bechtel 1 Mar 03 No ECD 35 Taji 7 CP R RIE/GRD 1 Oct 03 TBD 15 Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May Haditha-Baghd West 400 Sabotage RIE/GRD 15 Mar 38 towers complete/236 req’d Hartha-Qarna – Wasit 400 Sabotage RIE/GRD 29 Feb 227 towers complete/293 req’d Baghd South – Diwaniya 400 Sabotage RIE/GRD Complete 27 towers complete/27 req’d Baiji - Baghd West #1 400 Sabotage RIE/GRD 10 Feb 60 towers complete/66 req’d Baghd E.-Baghd S. #2 400 New Line RIE/GRD 10 Feb 81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME TBD No Contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 Sabotage ME 30 Apr Baiji – Mosul 400 Damaged ME Complete Mosul – Mosul East 132 Sabotage ME TBD Dibis/Irbil-Azadi/Quarqush 132 New Line RIE/GRD Shuwaiba-Toba-Hamar 132 Sabotage ME TBD Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 Mar Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 4 February 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 625 MW. Power transferred from South to Middle 185MW. Baghdad 1400 Duhok 80 Naynawa 300 Tamim 134 Salah Aldeen 200 Anbar 185 Dyala 88 Babil 85 Kirbala 84 Najaf 95 Kadsya 70 Wasit 80 Muthana 62 Nasirya 125 Misan 61 Basra 315 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 4