Home / US Department of Defense records / DOD-abfe07d4

US Department of Defense records

08-F-0260 Doc 14 Final Release

Date
Unknown
Category
US Department of Defense records
Text available
English
Source
US Department of Defense — FOIA reading room (Internet Archive)
English original PDFDownload English text
BOO of AMARAH Prison-work site works i MVO'. NVAI:le on.2n tan.= 1 - PERIMETER SECURITY • QuarititY U.Price Total Item I caw t.o.o. SIZE r=1", Description Arabic Description . ., ' ' Unit honuivumi I--- Demotshing of tie damaged parts of the old perimeter wall, Construct new perimeter wall (36 cm wide, 4m high) from bricks, making pillar for each 3 meters, laying of insulation layer, plastering with cemert and making 1-1 insulation layer 36 cm wide, thick '0-cm, as per drawing LM 800 using sulphate resistance cement and build wall cover (40 cm wide. thick 10 cm), (width of foundation 1.10 in), rendering with white cement.with rainforcment steel bars for New perimeter fence, steel columns (4" dia. 1-2 4m height) with mesh of chain link with 6 LM 90b a 4--et efa-ta strain wire with razor wire Construct a new perimeter wall with bricks and cement mortar with plastering for one 13 face(height 2m) and razor wire fixed with LM 350 3".-- tz2 -00 angle iron. Install new entrylexrt gate with R C.0 frame 1-4 (type 1) 4x4 Pi as per drawing Each 2 / 061 /SVC 1-5 1-6 1-7 1-8 Prepare surface and paint exist ng gates or fences with 1 coat primer and 2 coats oil paint Prepare surface and paint existing perimeter wall with 2 coats water based paint SM 4,000 (pentalite) Install new entry/exit gate with R.C.0 frame (type 2) 3x5 m as per drawing SM 2 SM 120 2.5- 3,11,c tee • Install new entry/exit gate with R.C.0 frame (type 3) 2x3 m as per drawing SM 8 15"--- back SUBTOTAL. / c'ecoce, of 4 BOO of AMARAH Prison-work site works Mew 2- SITEWORK Item Description Arabic Description SIZEtr"j Unit Quantity Total „ - U.PriCe r..... P rr rowrarcum ' 147. 1 ,-rogegn Linares, 2-1 Remove and dispose off site all trash and debris SM 40,000 0, eePec- 2_eas Demolish unsafe structures and dispose of 2-2 al' debris over ail 1 2 0-40 2. G-ading and levelling of ground (to include removing protruding objects from ground). 2-3 And Levelling of area around the building SM 22,800 -.PO /$2- q using clean soil Install asphalt pavements or walkways 2-4 (pavement of stabilizer 8 cm and binder 6 cm for R2) within take coat. SM 2.000 (0 2 0 eic ° Construct a new service building (no. as per 2-5 23,24,12. drawing SM 255 /4.-- e 3 225- e) Construct a building for control room. as per 2-6 drawing 3x4 SM 12 /4 ° m SUBTOTAL 3 - FLOOR SYSTEMS r...p,...... Item Description .. i .. . 4%. Arabic Description SIZEr-T Unit 1-"x' a‘4' •°: Install new reinforced concrete floor slab ......... 3-1 110 x15 m SM 750 g S 62 " If' Quantity U.Price Total' r............ 1=. ' /0 .7 -0t,ct5 3-2 3-3 Install new sub-bas f e material with spreading and compacting Install park (as per drawing) . corrugated sheet amberalla over steel coloumns 4" and guirder of angle iron 2x2" for sheet fixing. CM 600 4- 1 4o0 as per drawing SM 216 3 - 5-- .5--g let' 2 of 4 3-4 . 3-5 BOO of AMARAH Prison-work site works litamq..^110 1r Install a new watch tower, construct with cement mortar and bricks with R.C.0 ceiling (3.5x5 5) with R C C stair (6m) height,acc T3 drawing. ..CP Lamm,. Repair the existing watch towe- including rising the elevation up to total height 5 meter then construct the watch tcwer room as per item 3-4and the attached drawing Each 1:7:" ., 4 15- 0 0 . ‘tzpoe , -, SUBTOTAL 4 - ELECTRICAL SYSTEMS Item Description 4-1 Install new telephone cable 4-2 Install new telephone jack Install new control room consist of (4) control panales (1) for main supply and (3) to control 4-3 buildings and perimeter wall and exterior . light, with earth system connection as per drawings. 4-4 Install new mains transformer 4-5 Install new mains cabling Install new electrical generator with 4-6 changeover switch 4-7 Install new fuel tank for generator Install new exterior security lighting, sodium 4-8 type with transformer Installing electrical bell for the four conrner for peremeter wall and 12 4-9 control points by guard points and management rooms. Install a new power supply line using steel coloumn of height (9 m) and 4-10 standard alminume wires and size as required (4-line). • . 4el 'ig.V. Quantity U.Price ..9 , Total n-v-g. Arabic Descriptio caw SIZE PLA-Pll Unit [....., 1 (......9.7 Fig LM 800 I 0..... 0 -- Each 11 Each 1 1 ‘00 / 630 KVA Each 1 i Co if, 0 3 papa, 3x150-4-75 LM 15 ZeZt 3,00 500 KVA Eacn 1 3,49 bap 0 3.203. ta co I- 5000 lit. Eacn 1 .c- (100 .. 5 - 4e00 400 watt Each 25 /C a 3 7 -Co big type Each 5 /0 0 ‘ .5-d9 0 203 ' 1-1- 0 00 LM 200" I • BOO of AMARAH Prison-work site works ct• •1 ,104.1QP 't 4-11 Supply and install telephone exchange with all accessories, with connecting wires underground from feeder to exchange room and to buildings anC to watching tower. SUBTOTAL 5- MECHANICAL SYSTEMS Item Description 5-1 Install steel structure for water tanks of capacity 60 m3. Supply and install electrical water pump (3- 5-2 phase) Each Fenian Lorca's., re 45 0E0 S eye. e5 5'2_ 4 1- eo z Quantity U.Price Total r .1.7 tr.T- 40it , gee° 2 7 4—e ett" Item rweAmemo Description 'omen tanguige 6-1 6-2 Install new water piping (high pressure plastic type) Install new main shut-off valve 6-3 Build water fountain (1.2m hight and 50cm width) with plastering and painting 2 layers of oil paint SUBTOTAL 7 - OTHER ITEMS Item Description Provide armed security personnel 24 hours per day during the entre duration of the contract SUBTOTAL ridPurem. I Arabic Description SIZE Unit s per rawing Each 3 H.P Each Arabic Description SIZE o. Unit 2" & 4" LM 1.1 Each LM Quantity U.Price 1000 6- 2 logq , 10 Arabic Description SIZE crew Unit Quantity U.Price ..nousar Person 2 Total trz, ce GC) toe , e> Total 4' e 4 of 4 Clean and repair existing septic tanks (to 9,5 include new locking hatch covers) Each 9_6 9-7 8 ,. Install new septic tank including casting floor and plastering walls from inside (to include lx3x2 m, Each locking hatch covers) Install new porcelain sink with crome mixer and shut-off valves Each Install new water piping (high pressure plastic type) . 2 & 4" LM 1000/ C le , e. o 9-9 Install new main shut-off valve 9 _ 10 Install liackflow prevention valve 9 11 Install new galvanized water tanks 2 and 4" Each 2 r " / Ob 2 45 c> Each Each Building brick (24 cm) manholes, olastering 9_12 them from inside, casting the concrete floor, providing top cover (50 x 50 x 50) cm Each Installing chrome tap 1/2" dia. (western 9-13 made) , all necessary galvanized water 112 inch Each pipes 1/2" dia. Outside the wall with all 9-14 Supply and insta.11conrete latrine big type Each - 0 15 Build water fountain (1.2m bight and 50cm width) with plastering and painting 2 layers of oil paint • _.--,- LM 10 /..,-- . . - --‘ SUBTOTAL F 490 7 n18 - -- 1 ---- [10 - OTHER ITEMS NO DESCRIPTION ARABIC - DESCRIPTION , SIZE UNIT QUANTITY UNIT PRICE . OQD1 ITEM COST (IQD) 17 3 — 4,1 lanp.IP Provide . 10-1 per contract armed security personnel 24 hours day during the entire duration of the Perscri 2 2 • , ' -i 4.7i a o , , cf 8 u(7X., 42).1,••17...." .n01 0 , X, ) •,0V...01....1, PROJECT BID SHEET PROJECT INFORMATION: PROJECT TITLE. AMARAH PRISON- Building No. 4 (Administration Building) CITYNILLAGE: AL-AMARAH C.O.Ung.g. CONTRACTOR INFORMATION (To be completed by the Contractor) CONTRACTOR'S NAME: woo I.MOACIe CONTRACTORS ADDRESS: CONTRACTOR'S PHONE NUMBER: j g DATE PREPARED: PREPARED: BID ITEMS fro be completed by the Contractor) olmr t•Now SUMMARY 1 Sitework 2 Floor Systems 3 Wall & Ceiling Systems Roof Systems 4 3ge>cP Doors and Windows SZ C2-5- 6 electrical Systems 5- 575-1 -t• 7 Mechanical Systems Sc.6sco 8 Sanitary & Water Systems 9 Other Items 2_940 Zile veca TOTAL 1 1:SU(..2 of AMAkAH no* .4 (AdrilinislY- ation) 1- SITE WORK -,i .... - U.Price .., `"7... Total SIZE 10,...th.,,,„... quantity/ NOTE Item Description Arabic Description r"''''' Ifiqii Unit P:"P ro,..,,, i..,--:• ro,,,t,,, ., 1-1 Demolish unsafe structures and dispose of n..0,, w....1. over all 1 3 Co 3-CO all debris 1 _ 3 Replace concrete pavements or walkways SM 75 i 0 7-Cc Install coloured tiles for the yard infront of 1-2 building. 22x7 m SM 154 re • 199.0 — SUBTOTAL 24 ,4fC/ 2- FLOOR SYSTEMS rm... Item quantity/ U.Price Total • SIZE —9,....., [=, NOTE Description Arabic Description r"'"—"' ill. Unit .. p • rrer-o ' I r aeon l4.0.4 L .. cmir ,......c Remove and dispose damaged floor coverings and install new floor coverings( 2-1 30x30cm SM 440 / 49 • 4196° tiling with new mosaic tiles with filling the joints with white cement and polishing) Install a new hand rail for stair. 2-2 as per drawing LM 20 3o 66670 I , SUBTOTAL . -•fa, 010 _ _ 3 - WALL & CEILING SYSTEMS —11-.,,r. 1 a".9.0, • SIZE ...... quantity! U.Price "'''' Total Item ..... NOTE Item Description Arabic Description -,--, Unit "'``" f=„,, rqn lanpaXIC tOgegal isnoume 3_1 3-2 Remove damaged plaster from walls or ceilings and repair with mortar and/or gypsum plaster as required Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats latex (water based) pant with repairing with technical gypsum. SM 1,600 SM 2,000 474000 2. • I. of 6 ' _ BOQ of AMARAH Prison-building no.4 (Adminisb(ation) ormn Imam*, Prepare wall or ceiling surface, apply 1 coat r°"" r9-F 3_3 primer/sealer and 2 coats oil based paint i . SM 400 2.5-- I. dee 34 Demolish unsound walls / ceilings and dispose of all debris SM 25 1 0 2c.c) 3-5 Build new masonry wall with mortar/plaster finish for toilet partitions. thick. 24 cm SM 20 30 660, 3-6 Remove damaged ceramic tile wall covering and install new tiles, On cement and sand morter with filling joints with white cement. SM 150 i OIce° 3_7 remove the damaged plaster and plastering with cement and sand mortar and rendering with white cement, SM 550 IS. ' 33 49 0 , SUBTOTAL 143. 6550 4 - ROOF SYSTEMS magn ...- , 1 SIZE quantity/ ,.., 1-7— ‘ U.Price ......., Total - NOTE Item Description Arabic Description r Unit `"w"` 4 "9 ' ow, req....WV! I r= .41.4F r "T' 4-1 Repair parapet walls, fascia, or eaves, with rebuilding the damaged parts and plastering for two faces with cement '°'"' SM 75 30 225-0 G, Install new downspout plastic 4 inch high 4-2 pressure with all requirements. 4 inch LM 90 4 74g- 0 Installation of a new roof Remove tiles and 4 3 old dust and clean the roof. Apply mastic _ SM 220 '.-- 1110 0 ' and nylon overlaid by mud and dust SUBTOTAL 3O c› 2 of 6 cen vn an gt.ape BOQ of AMARAH Prison-building no.4 (Administration) 5- DOORS & WINDOWS Item Description Install new wooden hollow-core door r.inn Ung ilp, S IZ E Arabic Description 1 - ru, Unit `"'''''''"4" quantity/ U.Price Zrw Total ,,,,, [ NOTE _r --- man L.9.J. 5-1 Each 40 re ) 3 2Oa 5 2 Install new steel door SM 10 _ Install oversized metal door 5-3 2.1x1.5m SM 6.3 5-4 Prepare rough opening in wall and install new window frame and glass 5 5 Install new mesh screen _ - SUBTOTAL as per drawing SM 60 65- 3 (1E10 SM 60 3 1 g 0 •2 .5 -2 -' . 6 - ELECTRICAL SYSTEMS Lanfl.... Item Description I rOtecO La mm. Arabic Description r""' — : .'`., ' ! SIZE Unit quantity/ U.Price "r `—',"","'" e..., Total NOTE 1 1 6-1 6-2 Install new wall-mounted electrical wiring by using wires which section area are appropriate to every electrical component, samples should be introduce to supervisor engineer. Install new electrical outlet complete with wire (Volex type). Install new wall switchcoriplete with all wire 3x6, 2x2 5, 2x1 5 mm over all 1 300 SO Cs) Each 30 ii 3645 6-3 double buttons Each 32 q .- 224 6-4 Install new fluorescent light fixture complete with wire and starter and tube(philips type) Each 64 /5 -- Ct 4e3 3 of 6 .1J1 /4 .1‘.4 Q I ikliiii-kr(lArl (Aanniiitstrabort) 0 atop lan0.0. 6-5 Install new ceiling fan (double ball-bearing type) complete with regulator and wires. 6-6 Install new telephone cable 6-7 Install new telephone jack 6-8 Install new control panel consist of main switch (250 A). circuils. fuses. eath system connection as per drawings Install new circuit breakers 6-9 Install new mains cabling under ground • 610 (soil), according to conditions. 6-11 Installing electrical bell 6-12 Install main alarm switch in guard room and conectting with main alarm system. SUBTOTAL 7 - ME CHANICAL SYSTEMS tonbs...gmce SIZE Item Description Unit Arabic Description 7-1 (y.• Install new window air conditioning unit cooling/heating type saudi arabic made. with electrical connection and steel box and all accessories. 7-2 Installing the exhaust fan 12 inch with the frame and iron cage SUBTOTAL Each assipl Lomusce 16 LM 100 fd5o Each 14 s-- Each 1 SbOs 3-phase Each 18 lanes 4 2.0o 3x25 mm LM 60 (10e5 small type Each 12 Each Z ° SC) 575- L7t- quantity/ U.Price Total 0.11171 NOTE olden L.0.17. • Each 14 5-5- 6 76 0 12 inch Each 6 60 3 to tcc, 4 of 6 LIU 01 kuviAKA —ri rison4uiLthn9 no.4 tAdmmistration) [areqn Ung.11 , a - SANITARY AND WATER SYSTEMS ro..,....., 1 .....u........ Jantity/ U.Price EP! Total NOTE — t . °rem tangumop Item Description SIZE Unit Arabic Description t l MOM. r c er r.s.cr umwr, ...a. 1 .9". . . ... - Install new Eastern style toilet complete with /""'"' 8-1 Each 8 flush tank 8-2 Test and clean sanitary drain pipes over all 1 / c -(-) I c cc) Install new sanitary drain pipes plastic type. 83 high high pressure (10 bar) PVC 35 4, 6 inch LM C Clean and repair existing septic tanks (to 8-4 include new locking hatch covers) Each 1 Install new septic tank including casting floor 8-5 and plastering walls from inside (to include 4x3x2 m, Each 1 locking hatch covers) Install new porcelain sink with crome mixer 8-6 and shut-off valves Each 6 .. Install new water piping (galvanized steel) 8-7 3/4,1/2,1 inch LM 70 3 . 11 6 8-8 Install new main shirt-off valve - 1 inch Each 1 I 0 / 0 Building brick (24 cm) manholes, plasteririg 8-9 them from inside, casting the concrete floor, providing top cover Installing chrome tap 112" dia. (western 8-10 made) , all necessary galvanized water pipes 1/2" dia. Outside the wall with all Install a new water cooler (2 tap type), 8-11 Turkey made (Igor mark) with connection and all requirement. 8-12 Install new plastic shawer with chrome mixer. Install water electrical boiler (capacity 60 8_13 gallon of heater 3000 watt) with electrical and mechanical connection. (50 x 50 5 Each 2-5- x 50) cm 1/2 inch Each 5 ---- EP 10 ' Each 2 2 5 C' CI " 0 Each 6 3 0 I 80 60 gallon Each 2 - 1- C / Co SUBTOTAL 5 of 6 BOQ of AMARAH Prison-building no:4 (Administration) 9- OTHER ITEMS r f4 0.1 1 arypage • _ Item Description SIZE quantity/ U.Price Z1.) Total _ NOTE Arabic Description Unit .17.,. % .. rrn:tx I;;AM f1;41 11 , 1 or9.7. 4101041•KMER .- 9-1 Provide armed security personnel 24 hours per day during the entire duration of the contract Person 2 SUBTOTAL • 6, 1 ) • of 6 - 1,0) uleyitayo, MC,10) (ix!) 4 PROJECT BID SHEET --'Quo PROJECT INFORMATION: PROJECT TITLE: AMARAH PRISON- Building No. 8 and 11 CITYNILLAGE: AL-AMARAH CONTRACTOR INFORMATION (To be completed by the Contractor) CONTRACTOR'S NAME:'—c "" CONTRACTOR'S ADDRESS: CONTRACTOR'S PHONE NUMBER: 7 2- DATE PREPARED: .4 BID ITEMS (To be completed by the Contractor) amp, 1.9.3e SUMMARY - wean language Sitework 2 Floor Systems 3 Wall & Ceiling Systems 5 6 Roof Systems Doors and Windows Electrical Systems Mechanical Systems Sanitary & Water Systems 9 Other Items f 4-95 . ( 810 2_*zz, s 9 g3e) TOTAL 900 2g2/I.5- c ir — ergro tromp BOQ of AMARAH Prison-building no.8 and 11 1-SaEWORK Item Description Remove and dispose off site all trash and 1-1 debris Demolish unsafe structures and dispose of 1-2 all debris 1-3 Repiare concrete pavements or walkways anC0 • Arabic Description 0,0911 ellgIAUD low La SIZE Item Description 2-1 Remove and dispose damaged floor coverings and install new floor coverings( tiling with new mosaic tiles with filling the joints with white cement and polishing) SUBTOTAL - WALL & CEILING SYSTEMS Item Description Remove damaged plaster from walls or 3-1 ceilings and repair with mortar and/or gypsum plaster as required Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats latex (water 3-2 based) paint with epairing with technical gypsum. 3-3 Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats oil based paint 3-4 Demolish unsound walls / ceilings and dispose of all debris 3-5 Build new masonry wall with mortar/plaster finish for toilet partitions. 1 qty.. I. *Ma...A SIZE Arabic Description f=0. Unit 30x30cm awn Unit over al over all SM SM Arabic Description SIZE 1;4111 Unit SM SM SM SM SM Quantity U.Price Total Nov. 1 _?5-0 35-0 1 5-eo 65 Quantity U.Price Total 00.0. 120 / 6) 17_,Aum zap U.Price Total 2f4'0 Quantity 500 650 200 20 lb 120 1 of 5 L.P.04,1• 3-6 3-7 3-8 BOQ of AMARAH Prison-building no.8 and 11 remove the damaged plaster and plastering with cement and sand mortar and rendering with white cement, remove the damaged plaster and plastering with cement and sand mortar (fair face) Remove darnd iged plaster and install new tiles , On cement and sand morter with filling joints with white cement.for guard room SM 220 b 1 3Z 0 SM 200 5 )(9e9a 3-9 3-10 Build water fountain with brick and cement 24cm thickness and plastering with cement and sand , paint with oil paint 2 layers and acording to instruction , Install a new ceiling (I-beam with bricks and 5 cm thick. Of concrete over. 0.5X1.2 m • • SM 15 LM 6 a SM . ./ C3 2. 1 -7/ 50 20 iCa90 SUBTOTAL ' . 11415 4 - ROOF SYSTEMS item . ' Description Arabic Description 1,77.7._., j SIZE Unit -...q..4.. Quantity r....., izpim raw uremia U.Price Total i.owg ._ Repair parapet walls, fascia, or eaves, with 4-1 rebuilding the damaged parts and plastering for two faces with cement. SM 30 3 (. 7 9 (5° Install new downspout plastic 4 inch with all 4-2 requirements. . LM 32 (6 0 Installation of a new roof. Remove tiles and old dust and clean the roof. Apply mastic 7-5 - 10 SM 150 and nylon overlaid by mud and dust. SUBTOTAL / Ki° ' 2 of 5 BOQ of AMARAH Prison-building no.8 and 11 5 DOORS & WINDOWS Item Description 5-1 Supply and install internal steel doors using rigged steel bars of diameter (1or 7/8 inch) with bolts and box locks, and using double frame (3 inch) or chanal section (2x5 inch), and as per enclosed drawings of doors (D1, 02, 03,04, D5) I Arabic Description SIZE p.spn Unit VW, renT.IP •nyup Quantity U.PFice Total D1 SM 9.0 02 SM 6.3 03 SM 10.5 04 SM 4.5 05 3.15 SM 5 0 5C) C;) zgo 3l c.25- 5-2 Supply and instaltventilation window ,double frames, glass•width not exceed 10 cm, to include supply and install glass, security bars, painting and ensure Window instalment a against removing, a sample should be provided before executing above works to get final acceptance. W1,W2, W3 SM 10 4 1 5749 5-3 close the holes with brick and cement SM 20 SUBTOTAL 24 22 6 - ELECTRICAL SYSTEMS SIZE avow ( eepume olluantity Total U.Price Item Unit Description Arabic Description 1:= 1.4%. mew lonomot WNW Instal; new under ground electrical wiring by using old ducts of by making channal in wall, 6-1 over all using seimens type wires and then repairing walls with gypsum 3cp o Install new electrical outlet complete with 13,15,20 6-2 Each 8 wire (Volex type) Amp Install new wall switchcomplete with all wire 6-3 14 Each qft, c g Install new tluorescent-light fixture complete 6-4 Each with wire and starter and tube(philips type) 28 ( 5- zrp Pr, BOO of AMARAH Prison-building no.8 and 11 Install new ceiling fan (double ball-bearing . 0 .0000 roman 1.400,00•0 6-5 type) complete with regulator and wires. Each 5 6-6 Install new telephone cable 6-7 Install new telephone jack LM 150 Each 1 Install new control panel consist of main 6-8 switch (250 A), circuits, fuses, eath system Each connection as per drawings. Install new circuit breakers. 3-phase 6-9 18 Lines Each 1 6-10 Install new mains cabling from control room to buildings. 3x25+10 LM 150 6-11 Installing electrical bell big type Each 1 Install main alarm switch in guard room 6-12 and conectting with main alarm system. Each 1 SUBTOTAL - MECHANICAL SYSTEMS item Description SIZE Unit Quantity Arabic Description LEM*. 7-1 Installing the exhaust fan 12 inch with the frame and iron cage Install air coolers (4000 cubic meter/hr) 12 inch Each 8 7-2 Each 1 SUBTOTAL 8 - SANITARY AND WATER SYSTEMS Item Description SIZE Unit Quantity Arabic Description Install new Eastern style toilet complete with hoop, Unstop 8-1 Each flush tank 8.2 Test and clean sanitary drain pipes over all Install new sanitary drain pipes .plastic type. 8-3 high pi assure (10 bar) PVC LM 30 41 ,01=10, 225 160 c0 ts)c) 2_0 2_0 go SC5 4f6IN U.Price 0 moo', , swoop. Total lige) 3€50 U.Price Total G -c• •c) 2-6 /5 -0 4 of 5 8_4 8-5 8-6 8-7 8-8 8-9 8-10 8-11 8-12 8-13 BOQ of AMARAH Prison-building no.8 and 11 Install new septic tank including casting floor everantortpusw and plastering walls from inside (to include locking hatch covers) Install new porcelain sink with crome mixer and shut-off valves Install new water piping (galvanized steel) Install new main shut-off valve Building brick (24 cm) manholes, plastering them from inside, casting the concrete floor, providing top cover Installing chrome tap 1/2" dia. (western made) , all necessary galvanized water pipes 1/2" dia. Outside the wall with all Supply and install conrete latrine big type Build water fountain (1 .2m hight and ' 50cm width) with plastering and painting 2 layers of oil paint Install new plastic shawer with chrome mixer. Install water electrical boiler (capacity 60 gallon of heater 3000 watt) with electricai and mechanical connection. SUBTOTAL 9 - OTHER ITEMS Item Description Pcommunorip 9-1 Provide armed security personnel 24 hours per day during the entire duration of the contract SUBTOTAL 4x3x2 m, 3/4,1/2,1 inch '1 inch (50 x 50 x 50) cm 1/2 inch .n9+4J, Each Each 1M Each Each Each Each LM Each Each anon 2 7 50 1 12 13 3 5 7 2 o o to It /0 2-6 Arabic Description WPM. 69 gallon 1 /0 7 -C SIZE U.Price tureyi Quantity Unit Person 2 2e0 7c)c-3 26 Zeun / 65- 10 c 2_ ere` z S3119 Total room I iftANCP 4 101, 4 106 ' r , •••••••••, WOW, ryryttIyayr PROJECT BID SHEET PROJECT INFORMATION: PROJECT TITLE: AMARAH PRISON- Building No .7 CITY/VILLAGE: AL-AMARAH CONTRACTOR INFORMATION (To be completed by the Contractor) AnC.C. CONTRACTOR'S NAME: mvnian0.4 CONTRACTOR'S ADDRESS: CONTRACTOR'S PHONE NUMBER: 2 I 7 z DATE PREPARED: BID ITEMS (To be completed by the Contractor SUMMARY Sitework Floor Systems Wall & Ceiling Systems Roof Systems Doors and Windows 6 Electrical Systems Mechanical Systems Sanitary & Water Systems Other Items TOTAL MKT tlinrssWe reKni.V.XT ! 113C /3 eel 7 f5 22 / 4 L••••:• Prison-building no.7 1 - SITEWORK onto, name Item Description Arabic Description SIZE Unit quantity/ U.Price Total roma. L.X.13. atowl , Remove and dispose off site all trash and 1-1 debris 1-2 Demolish unsafe structures and dispose of all debris 1-3 Replace concrete pavements or walkways over all 1 15-0) 3.5 7 27 over all 1 4 5- 0 /C C' SM 50 itO 5. 00 SUBTOTAL /300 MOW SIZE Unit quantity/ U.Price Total tromp 30x30cm SM 110 / 0 rloo • 2 FLOOR SYSTEMS celqn • .X7.0, Item Description • Arabic Description 2-1 Remove and dispose damaged floor coverings and install new floor coverings( tiling with new mosaic tiles with filling the joints with white cement and polishing) SUBTOTAL 3 WALL & CEILING SYSTEMS Item Description 3-1 I zing.fr meat tants.n. 3-2 Remove damaged plaster from walls or ceilings and repair with mortar and/or gypsum plaster as required Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats latex (water based) paint with repairing with technical gypsum Arabic Description ••.V.W. SIZE Unit quantity/ U.Price Total SM 220 SM 400 Z_ 80 • 1 of 6 Prison-building no.7 roreqn 3-3 Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats oil based paint Demolish weak walls / ceilings and dispose 3-4 of all debris 3-5 Build new masonry wall with mortar/plaster finish for toilet partitions. 3_6 3-7 remove the damaged plaster and plastering with cement and sand mortar and rendering with white cement, remove the damaged plaster and plastering with cement and sand mortar (fair face). Build water fountain with brick and cement 24cm thickness and plastering with cement 3-8 and sand , paint with oil paint 2 layers and acording to instruction Remove damaged plaster and install new 4-9 tiles, On cement and sand mortar with filling joints with white cement. construct new ceiling and 5cm casting con 4-10 thick over ceiling (for W C) and cantiliver suBTOTAL 4- ROOF SYSTEMS Item Description Repair parapet walls, fascia, or eaves, with 4-1 rebuilding the damaged parts and plastering for two faces with cement. Installation of a new roof. Remove tiles and 4-2 old dust and clean the roof. Apply mastic and nylon overlaid by mud and dust SUBTOTAL Arabic Description °rapt Dirp.po SM SM SM SM sre 0.5X1.2 LM SM SM 150 30 90 200 160 4 16 50 /0 30 375- 30° 27 ek'' / 2 09 Afitgri /40 /0 ZP o' g 4 13 5— SIZE Total mrsCn quantitr/ U.Price Unit 090, L.nPOAle LM 56 do SM 160 5 — Ig44) 5- DOORS & WINDOWS Item 5-1 DescrIptio in Supply and install internal steel doors using rigged steel bars of diameter (1 or 7/8 inch) with bolts and box iocks, and using double frame (3 inch) or chanal section (2x5 inch), and as per enclosed drawings of doors (D1,02, 03, D4 ,ID5) Prison-building no.7 mop WOW orogn enwrap Arabic Description r°"`"`"' SIZE U.Price To.K. quantity/ Total Unit I orapn .0.0, D1 02 03 04 D5 SM SM SM SM SM 960 2 10 8 50 4.50 • 315 W1,W2, W3 SM 10.5 5 -0 S -05 Igo /0.5- 2 /57C Supply and install ventilation window ,double frames, glass width not exceed 10 cm, to include supply and install glass, security 5-2 bars, painting and ensure window instalment a against removing, a sample should be provided before executing above works to get final acceptance. Closing the wall holes with bricks and 5-3 cement mortar. SUBTOTAL /gt5" 6 - ELECTRICAL SYSTEMS imv.tr Item Description Arabic Description SIZE ['X..: I quantity/ U.P.rice an9,41 , Unit f- E311 Total 6-1 Install new under ground electrical wiring by using old ducts of by making channel in wall, using seimens type wires and then repairing walls with gypsum. over all _300 _3 co cs. Install new electrical outlet complete with 6-2 13,15,20 wire (Volex type). Amp. Each 8 /2- Install new wall switchcomplete with all wire 6-3 Each 10 17C7 Install new fluorescent light fixture complete 6 4 , with wire and starter and tube(philips type) Each 20 3 of , Prison-building no.7 roan t666641. Install new ceiling fan (double ball-bearing ''''"'""°"'''' • 6-5 type) complete with regulator and wires. Each —° """w 5 4 ,f Aa.0 6_6 Install new telephone cable (single pair) LM 150 / /S.. ° 6 _ 7 Install new te•ephone jack Each 1 .5.-- - Install Install new control panel consist of main 6.8 switch (250 A), circuits, fuses, eath system Each 1 connection as per drawings. 6-9 Install new circuit breakers. 3-phase 18 Lines Each 1 20g) Install new mains cabling from control room 6-10 to buildings. 6_11 . Installing electrical bell Install main main alarm switch in guard room 6_12 and conectting with main alarm system. 4x25 mm LM 125 /5 --- i Or F_Cr- big type Each 1 /.5 — Each 1 g 9t9 11 49 SUBTOTAL 4 f/6" 7- MECHANICAL SYSTEMS Item SIZE Unit I i ...g. L.9.0. quantity/ U.Price 1,—, Total • ii.• I Description Arabic Description r" [:.44. i .n .z. I • 1 0,...,...... 7-1 Installing the exhaust fan 12 inch with the frame and iron cage 12 inch Each 8 0 41E) Install air coolers (4000 cubic meter/hr) 7-2 Each 1 SUBTOTAL 63 a 6 4 of 6 Prison-building no.7 I ormn I anpm,r 8- SANITARY AND WATER SYSTEMS .....Lwa-tor cm•On ...sap quantity/ - Item Description Arabic Description SIZE Unit U.Price 1 ,. Total f.., r r ,....- ,....i...., 8-1 Install new Eastern style toilet complete with flush tank 8 _ 2 i est and clean sanitary drain pipes Each 1 -C O 5 -6 Each 1 25-V 2 5 .0 Install new sanitary drain pipes .plastic type, 8-3 high pressure (10 bar) PVC LM 30 - 5- Install new septic tank including casting floor 8_4 and plastering walls from inside (to include 4x3x2 m, Each 2 0 35) fir" ) locking hatch covers) Install new porcelain sink with crome mixer 8-5 and shut-off valves Each 6 ‘ 41) 1 4C) Install new water piping (galvanized steel) 8-6 8-7 Install new main shut-off valve 3/4,1/2,1 inch LM 50 1 2ApO, 1 inch Each 1 Building brick (24 cm) manholes, plastering 8-8 them from inside, casting the concrete floor, (50.% 50 Each 11 x 50) cm providing top cover Installing chrome tap 1/2" dia. (western 8-9 made) , all necessary galvanized water 1/2 inch Each 12 .5 • pipes 1/2" dia. Outside the wall with all 8-10 Supply and install conrete latrine big otype Each 4 3 Build water fountain (1.2m hight and 8-11 50cm width) with plastering and painting LM 5 40 e4c,0 2 layers of oil paint 8-12 Install new shower with mixer. Each 4 ° F 2 •`:' 8 13 _ Install water electrical boiler (capacity 60 gallon of heater 3000 watt) with electrical and mechanical connection. 60 gallon Each 2 SUBTOTAL . f 7 ‘- 5- , 5 of 6 Prison-building no.7 9 - OTHER ITEMS Item Description .. aebr Leng.90 u.price Conc.) AGA P"7"" - SIZE quantity/ r.. L.CMO. Total Arabic Description I pmil Unit r- .7. 1 4„,„„ I hollow/0e I . toque/nem.", 9-1 Provide armed security personnel 24 hours per day during the entire duration of the Person I 2 contract P I° Z- 066 SUBTOTAL - 6 of 6 .X '01 ro,,L..g.k.0, PROJECT BID SHEET ..Pign smug. PROJECT INFORMATION: PROJECT I ITLE: AMARAH PRISON- Building No. 5 and 9 CITY1VILLAGE: AL-AMARAH CONTRACTOR INFORMATION (To be completed by the Contractor) mew CONTRACTOR'S NAME: mein enPAO. CONTRACTOR'S ADDRESS: CONTRACTOR'S PHONE NUMBER: .31 9 - 2453 DATE PREPARED: BID ITEMS (To be completed by the Contractor) .n9u4 SUMMARY 1 Sitework Floor Systems 3 Wall & Ceiling Systems 4 Roof Systems 5 Doors and Windows 6 Electrical Systems 7 Mechanical Systems 8 Sanitary & Water Systems 9 Other Items ? qo o 67595 / 2 2 3, / 3 TOTAL 2 90 2c 2 /3413,V toter larpuige BOQ of Prison-building no.5 and § wool ang.09. 1-SITEINORK Item Description Remove and dispose off site all trash and debris Demolish unsafe structares and dispose of all debi is Rerace concrete pavements or walkways Arabic Description Quan -tity U.Price Total over all over all SUBTOTAL 2 - FLOOR SYSTEMS Description Arabic Description SIZE /-16,61 Quantity U.Price 2-1 Remove and dispose damaged floor coverings and install new floor coverings( tiling with new mosaic tiles with filling the Joints with white cement and polishing) 30x30cm SUBTOTAL 3 - WALL & CEILING SYSTEMS Quantity U.Price Description Arabic Description SIZE Total WNW 3_1 Remove damaged plaster from walls or ceilings and repair with mortar and/or gypsum plaster as required Prepare wall of ceiling surface, apply 1 coat primer/sealer and 2 coats latex (water based) paint with repairing with technical gypsum 3_3 Prepare wall cr ceiling surface. apply 1 coat primer/sealer and 2 coats oil based paint Demolish unsound walls / ceilings and 3-4 dispose of all debris 1 of 5 BOQ of Prison-building no.5 and 9 Build new masonry wall with mortar/plaster 3_5 finish (thick 12, 24 cm according to work requirements remove the damaged plaster and plastering 3.6 with cement and sand mortar and rendering with white cement remove the damaged plaster and plastering 3-7 with cement and sand mortar (fair face) 3-8 3-9 Remove damaged plaster and install new tiles. On cement and sand morter with filling joints with white cement. Build water fountain with brick and cement 24cm thickness and plastering with cement and sand, paint with oil paint 2 layers and acording to instruction SUBTOTAL 4 - ROOF SYSTEMS Item Arabic Description Description 4-1 Repair parapet walls, fascia, or eaves, with rebuilding the damaged parts and plastering for two faces with cement. Install new downspout plastic 4 inch with all requirements Installation of a new roof. Remove tiles and old dust and clean the roof. Apply mastic and nylon overlaid by mud and dust Anpurx SUBTOTAL Oniqn .1.24100. as per drawing H=50cm, w =24cm 74:t. 2 of 5 BOQ of Prison-building no.5 and 9 (IINGA 1.1119.133e 5 - DOORS & WINDOWS 1.....,L.-.... ..-ant...-9 SIZE ...,.. - Quantity U.Price Total ..e= Item Description . Arabic Description real Unit 4;,31 r.....t...-c. r...., Supply and install internal steel doors using rigged steel bars of diameter (1or 7/8 inch) with bolts and box locks, and using double 5-1 frame (3 inch) or chanal section (2x5 inch), and as per enclosed drawings of doors . (D1,D2,D3,D4,D5) D1 SM 15.36 5 -(5 7 6-g D2 SM 2.10 .c 0 D3 SM 6.30 6 -0 3, D4 SM 4.50 6- eP 05 SM 3.15 5_2 5-3 Supply and and install ventilation window ,double frames, glass width not exceed 10 cm, to • include supply and install glass, security bars, painting and ensure window instalment W1 W2, , W3 SM 7.56 37 .5' a against removing, a sample should be provided before executing above works to get final acceptance. Close the holes using bricks and cement mortar. SM 12 26— 300 SUBTOTAL 22 4i 8 -6" 6 - ELECTRICAL SYSTEMS ...GP ..9.0 , 0 SIZE Quantity U.Price Total 1 .Z1;:. Item Unit ..,,, Description Arabic Description warn l alOall. r "'W.'. 6-1 6-2 Install new under ground electrical wiring by using old ducts of by making channal in wall, using seimens type wires and then repairing walls with gypsum. Install new electrical outlet complete with wire (Volex type). Install new wall switchcomplete with all wire over all 30 e 3 3 a o 13,15,20 Amp. Each 10 / 0 / 6 e> 6-3 Each 12 G e (CD ' , 6-4 Install new fluorescent light fixture complete With wire and starter and tube(philips type) Each 24 / 2.. 28-g 1 , .f C —I 6-5 6-6 6-7 BOQ of Prison-building no.5 and 9 Install new ceiling fan (double ball-bearing snp..., type) complete with regulator and wires. Install new telephone Cable Install new telephone jack 6-8 Install new control panel consist of main switch (250 A), circuits, fuses, eath system connection as per drawings. Install new circuit breakers. 6-9 6-10 Install new mains cabling from control room to buildings. 6-11 Installing electrical bell 6-12 Install main alarm switch in guard room and conectting with main alarm system. SUBTOTAL - MECHANICAL SYSTEMS Item Description enmp .51.4R 7-1 Installing the exhaust fan 12 inch with the frame and iron cage Install air coolers (4000 cubic meter/hr) 7-2 SUBTOTAL 8- SANITARY AND WATER SYSTEMS Item Description 8-1 8-2 . 8-3 Install new Eastern style toilet complete with flush tank Test and clean sanitary drain pipes Install new sanitary drain pipes .plastic type, high pressure (10 bar) PVC . 4•KIn 3-phase 18 Lines 4x25 mm big type Each 7 44e , go LM 2_ 200 Each Each Each LM Each. Each 1 1 300' g'&4f5 1 2_0e. 210c> 110 /5 /Z5-0 1 /57 1 /5- tc- 11111111111MININ 12 inch Unit Each Each 7 5 0 (57 -c7 /5-e , ge,z4 Arabic Description 52. Quantity U.Price Unit roman ung.o. roml Each LM 1 5 - 6 1 /6 - 5-c° 30 V 4 of 5 BOQ of Prison-building no.5 and 9' caw Lerepwcp Clean and repair existing septic tanks (to lloquage 8-4 include new locking hatch covers) Each 1 Install new septic tank including casting floor 8-5 and plastering walls from inside (to include 4x3x2 m, Each 1 66a locking hatch covers) 6On Install new porcelain sink with crome mixer 8-6 and shut-off valves Each 7 go ( 742-e , Install new water piping (galvanized steel 3/4,1/2,1 3C e 8-7 inch LAI 70 8-8 Install new main shut-off valve 1 inch Each 1 JO /6A Building brick (24 cm) manholes, plastering 8.9 them from inside, casting the concrete floor, (50 x 50 Each 10 x 50) cm providing top cover Installing chrome tap 1/2" dia. (western 8-10 made) , all necessary galvanized water 1/2 inch Each 8 pipes 1/2" dia. Outside the wall with all Supply and install conrete latrine big 8-11 type Each 6 Build water fountain (1.2m hight and 8-12 50cm width) with plastering and painting LM 6 444 , 217 , o 2 layers of oil paint Install new plastic shawer with chrome 8-13 Each 5 mixer. /5-c) Install water eleotrical boiler (capacity 60 8-14 gallon of heater 3000 watt) with electrical 60 gallon Each and mechanical connection. SUBTOTAL 9 - OTHER ITEMS Item Description Arabic Description 9-1 Provide armed security personnel 24 hours per day during the entire duration of the contract SUBTOTAL SIZE Unit Person • 2 awn t..a.o. Total Quantity U.Price lanipedgr. 2 /eo 2 dbe' 2. 42, cy 5 of as Ms).,....suasassaa r..11.•••••• PROJECT BID SHEET PROJECT INFORMATION: PROJECT TITLE; AMARAH PRISON- Building No. 1 CITYNILLAGE: AL-AMARAH CONTRACTOR INFORMATION (To be completed by the Contractor) CONTRACTORS NAME CONTRACTORS ADDRESS: degraanguipp CONTRACTOR'S PHONE NU DATE PREPARED: PREPARED: BID ITEMS (To be completed by the Contractor) . 3.ecn wow= romsin t woos,* rye, ,,fr e SUMMARY Sitework 1 g5c> fr,SO Floor Systems Wall & Ceiling Systems Roof Systems Doors and Windows Electrical Systems Mechanical Systems Sanitary & Water Systems Other Items ..00" 6'110 344-4 ( 4 4, ePiD TOTAL • orogn Lamm, Bill of quantity for building No.1 (2 floors 1 - SITEWORK 7.. L. U.Price = Lt . , Item Description SIZE quantity/ Total Arabic Description Unit Eni ri „„ imam, ratan crow lanw -1-1 Remove and dispose off site all trash and over all 1 3 cgt 5:11: , debris - 1-2 Demolish unsafe structures and dispose of all debris 1 3 Replace concrete pavements or walkways _ over all 1 15-/P1, 5e%, SM 100 SUBTOTAL NOTE i etf :31 2 - FLOOR SYSTEMS Item Description A;abic Description ...... . SIZE Mai iSnalMe quantity/ U.Price PP! Total NOTE 1 Unit . .....t.".7.0. , . _ 2-1 Remove and dispose damaged floor coverings and install new floor coverings( tiling with new mosaic tiles with filling the joints with white cement and polishing) 30x30cm SM 200 / YID 2240 614 :" 2-2 constract new additional part (toilete)with main building starting from: foundation+walls+ceifing+plastering+ roofing etc. • " SM 85' (5 0 Install a new hand rail for stair. 2-3 as per drawing LM , 30 '3/ nke51 *il ci. SUBTOTAL own 9.9. 3 - WALL & CEILING SYSTEMS ,.......... SIZE Total quantity/ U.Price Item Description Arabic Description ...0i Unit - tr.? NOTE ...,n io— - ... 3_1 3-2 Remove damaged plaster from walls or ceilings and repair with mortar and/or gypsum plaster as required Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats latex (water based) paint with repairing with technical gypsum. SM 1,500 fir.50E5 , 2,200 q %I-61 6 1 of 6 Bill of quantity for building No.1 (2 floors) ow) Imam. Prepare wall or ceiling surface, apply 1 coat 3_3 primer/sealer and 2 coats oil based paint ,..V.Ve SM 1,000 Build new masonry wal with mortar! plaster SM 3-4 200 for toilet partitior remove the damaged plaster and plastering with cement and sand mortar and rendering 4-7 with white cement for outer faces. SM 400 300 remove the damaged plaster and plastering 3..5 with cement and sand mortar (fair face) for toilet. 3-6 Build water fountain with brick and cement 24cm thickness and plastering with cement and sand , paint with oil paint 2 layers and acording to instruction 0.5X1.2 SM LM 20 Install a new ceiling (I-beam with bricks and SM 3-7 20 5 cm thick. Of concrete over. SUBTOTAL 4- ROOF SYSTEMS 4 Description quantity/ Arabic Description U.Price _ Install new downspout plastic 4 inch with all requirements. Installation of a new roof. Remove tiles and 2 old dust and clean the roof. Apply mastic and nylon overlaid by mud and dust. SUBTOTAL i; - 25-00 601301 , 251 2_1 4 *0 IS- Crm gotl Total 2 of 6 Bill of quantity for building No.1 (2 floors) 5. DOORS & WINDOWS .. f I Item Description Arabic Description kt•—•" SIZE Unit quantity/ 'PA. ' U.Price Total NOTE -r —cr •-P £11 s.!.. `'''""n" °' • - 5-1 Supply and install internal steel doors using 'nin "n". • rigged steel bars of diameter (1or 7/8 inch) with bolts and box locks, and using double frame (3 inch) or chanal section (2x5 inch), and as per enclosed drawings of doors (D1,02,133,04.D5) , 01 SM 61.5 • 5 D2 SM 17.0 - s -as 4 23.541 D3 SM 250' •-- ca \ -2-- -4 :2) 04 SM 10.0 -- _.5-cs 6 .5 Mt 19 D5 SM 6.5 ' 3 1. .. 5-2 Supply and install ventilation window ,double frames, glass width not exceed 10 cm, to include supply and install glass, security bars, painting and ensure window instalment a against removing, a sample should be provided before executing above works to get final acceptance. W1, W2, W3 SM 22 ./. 4.5 INet - SUBTOTAL 6 9Q 0 6 - ELECTRICAL SYSTEMS • r.....,,,,..., !.. Item I w"9.1.'" Unit quantity! , SIZE ' U.Price Total ' r r Description (.„ Arabic Description r=- c :1 p NOTE . ... Install new under ground electrical wiring by using old ducts of by making channal in wall, 6-1 using seimens type wires and then repairing over all 1, _.2 00 3> ititi ei walls with gypsum . 6-2 6-3 Install new electrical outlet complete with wire (Volex type). Install new wall switchcomplete with all wire, single or double button as required. 13,15,20 Amp. Each 12 •- • 1 2 I 44 1 Each 20 • 4- i 4 0 6-4 Install new fluorescent light fixture complete with wire and starter and tube(philips type) ., Each 80 Lc -'-- 3 of 6 Bill of quantity for building No.1 (2 floors) ro.vni.van;* 6-5 Install new ceiling fan (double ball-bearing type) complete with regdatonand wires. asIgn Loney:a oragn lcnouage 6-6 Instali new telephone cable (single pair) 6-7 Install new telephone jack -6-9 Install new control panel consist of main switch (250 A), circuits, fuses, eath system connection as per drawings. Install new circuit breakers 6-10 3-phase 18 Lines 6-11 Install new mains cabling from control room to buildings. 3x50+25 mm 6-12 Installing electrical bell big type 6-13 Install main alarm switch in guard room and conectting with main alarm system. SUBTOTAL 7- MECHANICAL SYSTEMS SIZE Item Description Arabic Description oncr t."9, fr...0,1mOMP 7-1 Installing the exhaust fan 12 inch with the frame and iron cage 12 inch Each LM Each Each Each LM Each Each Install air coolers (4000 cubic meter/hr) 7-2 Each SUBTOTAL 20, 45- 100 *co 2 _5- / 2 PC) f60 ,0 2 4 q:. 100 as" z_cc, 2k-' 2 0 4 4 Lry., Unit quantity/ U.Price Total romp, •ncupe Each 20 eirepo 7oo 2 NOTE 4 of 6 Bill of quantity for building No.1 (2 floors) 8- SANITARY AND WATER SYSTEMS 1....r umpAcie _ I r....o...u.o. Item Description Arabic Description z . .i. .. I . SIZE ...an unouKo Unit it ivantity/ U.Price 17.- Total NOTE r x .z.. %. , r.esn Anwar . Install new Eastern style toilet complete with 6-1 flush tank Each 2 -- .5 453 tOcD - 8 _ 2 Test and clean sanitary drain pipes Each 1 - 1 0 2,5-0 Install new sanitary drain pipes .plastic type, 8-3 high pressure (10 bar) PVC LM ,_ 70 5- Clean and repair existing septic tanks (to 8-4 include new locking hatch covers) Each 2 - 9-- CO I A aD , Install new septic tank including casting floor 8..8 and plastering walls from inside (to include ...-- ...-- 4x3x2 m, Each 2 locking hatch covers) • Install new porcelain sink with crome mixer B-6 and shut-off valves Each 18 z 6 C P • i cogGP Install new water piping (galvanized steel) 8-7 8-8 Install new main shut-off valve Building brick (24 cm) manholes. plastering 8-9 them from inside, casting the concrete floor. providing top cover Installing chrome tap 1/2" dia. (western 8-10 made) , all necessary galvanized water pipes 1/2" dia. Outside the wall with all 8-11 Supply and install conrete latrine big type Build water fountain (1.2m hight and 8-12 50cm width) with plastering and paintinc 2 layers of oil paint 8-13 Install new shawer with mixer. 8_14 Install water electrical boiler (capacity 60 gallon of heater 3000 watt) with electrical and mechanical connection. SUBTOTAL 3/4,1/2,1 inch LM 100 ''' q 4 oo 1 inch Each 1 ' /0 .1 0 (50 x 50 x 50) cm Each 10 ' j 5-- 2 C-C) 1/2 inch Each • / 26 5 --- i 30 Each 24 r 35 0 lc' LM / 12 4 1 C) 4 so Each 26 r 3 60 gallon Etch 6/ 7 -5 .-" 4.5 7° . _1 5 016 Bill of quantity for building No.1 (2 floors) aniqn langupar 9 - OTHER ITEMS - f....,......K. -1 Item Description SIZE Arabic Description ° " *" 9 ". p•••• Unit ,,......t . - two Un•••• 9-1 Provide armed ser.unty personnel 24 hours per day during the entire duration of the contract 1 U.Price re... r............ quantity/ Total NOTE .v.... . ... p t. , r...4..t..x..K. 1 Person 2 SUBTOTAL 4t5 cts C.1 • • 6 of 6 14t).1 .411 ,....P44 FPF- reiv5.0.0. PROJECT BID SHEET PROJECT INFORMATION: ortip11.41.17 , PROJECT TITLE: AMARAH PRISON- Building No 12- Gaurds rest CITYIVILLAGE: AL-AMARAH CONTRACTOR INFORMATION (To be completed by the Contractor) CONTRACTOR'S NAME: 1.00.17 CONTRACTOR'S ADDRESS: CONTRACTOR'S PHONE NUMBER: _31_22s2_ 1g DATE PREPARED: BID ITEMS (To be completed by the Contractor SUMMARY vompurom. Weal I Sitework /15-0 Floor Systems /4e- 3 Wall & Ceiling Systems 4 Roof Systems / Doors and Windows 5 /717 1.5- 6 Electrical Systems 5 7 C= 0 3 re Mechanical Systems 8 Sanitary & Water Systems 9 Other Items TOTAL awn I Anwar Prison-building no.12 -gaurds rest l - SITEWORK Item Description anew 1111, Remove and dispose off site all trash and 1-1 1-2 debris Demolish unsafe structures and dispose of all debris 1-3 Replace concrete pavements or walkways SUBTOTAL 2 - FLOOR SYSTEMS Item Description paw isngtApe -2-1 Remove and dispose damaged floor coverings and install new floor coverings( tiling with new mosaic tiles with filling the joints wan white cement and polishing) SUBTOTAL 3 - WALL & CEILING SYSTEMS Item Description LI 3.1 Remove damaged plaster from walls or ceilings and repair with mortar and/or gypsum plaster as required 3-2 Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats latex (water based) paint with repairing with technical gypsum 3_3 Prepare wall or ce,ling surface, apply 1 coat ormerlsealer and 2 coats oil based paint t arow I wq.C. Quantity Arabic Description SIZE[=0 Unit over all 1 over all 1 SM 60 dew Uniimp Arabic Description Quantity SIZE Unit 30x30cm SM 140 Arabic Description SIZE Unit uantity raw+ SM 350 SM 350 U.Price • =cm I. ar ow= z g' 3 e) ifrP U.Price Total craw arOu•re I SM 120 z • 5 - 01,71 3 d"D .6- .0 Total Total 010101 Build new masonry wall with mortar/plaster 3-4 es' 2_1geD f;rish SM 30 3-5 plastering with cement and sand mortar (fair face) for W C SM 120 43e9 1 of 5 3-6 3-7 Prison-building no.12 -gaurds rest any, 0.4In L.9.0e Install a new ceiling (I-beam with bricks and 5 cm thick. Of concrete over. Build iron fence stairs outside the building 4 5 m height fixed with concrete of interior walkway and paint with oil paint SUBTOTAL 4- ROOF SYSTEMS Item Description Arabic Description SIZE moan lower Install new downspout plastic 4 inch with all 4-1 0 requirements. Installation of a new roof Remove tiles and 4 2 old dust and clean the roof. Apply mastic _ and nylon overlaid by mud and dust. 4-3 Repair parapet walls, fascia, or eaves, with rebuilding the damaged parts and plastering for two faces with cement. SUBTOTAL 5 DOORS & WINDOWS Item Description Arabic Description 5-1 raevn 1.9.9 0 Supply and install internal steel doors using rigged steel bars of diameter (1or 7/8 inch) with bolts and box locks, and using double frame (3 inch) or chanal section (2x5 inch), and as per enclosed drawings of doors Total 6° SM 145 12_5- SM 35 les'A J5° Wpm. uantity U.Price Total Unit I ceecon 5-2 Install new wooden hollow-core door with frame and locks and all accessories SD1 SM SD2 SM SD3 SM Each 4.20 3.15 11 80 2 2/9 5169 2 of 5 ...Planguace 5-3 Prison-building no.12 -gaurdS rest provisioning and Install iron windows with glass and protection bars and mesh screen and according to diagrams =W4 6x1.5x1.2 r-W5 3x1.0x.3 =W6 4x.05x.3 tootintanause SM 13 8 410 SUBTOTAL tfe7Y—C` 6 - ELECTRICAL SYSTEMS PcoP(V....P.RP Total uantity U.Price Unit SIZE 47., OMM anon I anovar Item Description Arabic Description 6-1 Install new surface-mounted electrical wiring 0109 . 1 lavuops LM 1 ZS- a) 6-2 Install new electrical outlet complete with 13,15,20 Each 11 wire (Volex type) iz /31 Amp. Install new wall switchcomplete with all wire 6-3 Each 9 Install new fluorescent light fixture complete 6-4 with wire and starter and tube(philips type) Each 12 ign 6-5 Install new ceiling fan (double ball-bearing type) complete with regulator and wires. Each 5 6 6 Install new telephone cable (single pair) LM 300 6-7 Each 2 Install new telephone jack /0 Install new circuit breaker (different 6-8 Each 18 capacities) 4,9 6-9 Install new circuit breakers. 3-phase Each 1 18 Lines ZD 204w Install new isolation switch 120 A 3 6-10 Each 1 phase ?PP 6-11 Install new mains cabling from control room 3x25+10 LM 300 to buildings. 3406 ° 6-12 Install alarm with all accessories (80ut1et) in different places in connection with main alarm network Each 1 • 3 of 5 Prison-building no.12 -gaurds rest <Moan t.P.K.W 8-13 provisioning and installing external rain light with switch inside the building oreopn 6-14 provisioning and installing ball light for W C and bedroom SUBTOTAL 7- MECHANICAL SYSTEMS Item Description 7-1 7-2 Installing the exhaust fan 12 inch with the frame and iron cage Install new window air conditioning unit cool and heat with switch and cable 3x16, auto switch 20A 7-3 providing ,installing ,test water cooler 2 taps chrome metal cover according to instruction (western made) SUBTOTAL 8- SANITARY AND WATER SYSTEMS Item Description 8-1 8_2 8-3 8-4 8-5 Install new Eastern style toilet complete with flush tank Test and clean sanitary drain pipes Install new sanitary drain pipes plastic type, high pressure (10 bar) PVC Install new septic tank including casting floor and plastering walls from inside (to include locking hatch covers) Install new porcelain sink with crome mixer and shut-off vaives unamp, mcMin I Each 4 Each 8 Lar SIZE . Arabic Description Unit 12 inch Each 3 2400 BTU Each 3 Each 1 j Arabic Description Unit Quantity SIZEr..7,4 Each 2 Each 1 LM 30 4x3x2 m, Each 2 Each 2 • U.Price o.aron 53' 4 " U.Price o. tsfla 5 717 evvti" /2(0 iFe2 Total ERN Lanau.O. 4c7 940 ,35?' 207 co Total IP 42 4 of 5 Prison-building no.12 -gaurds rest Install new water piping (galvanized steel) ' mr11 ,...q6 .41c 3/4,1/2,1 8-6 87 Install new main shut off valve Building brick (24 cm) manholes, plastering 8-8 them from inside, casting the concrete floor, prcviding top cover Installing chrome tap 1/2" dia. (western 9-9 made) , all necessary galvanized water pipes 1/2" dia. Outside the wall with all Install new plastic shawer with chrome 8-10 mixer. 8-11 Install water electrical boiler (capacity 60 gallon of heater 3000 watt) with electrical and mechanical connection. SUBTOTAL inch LM 60 1 inch Each 50 x 50 x 50) cm Each 10 1/2 inch Each 3 Each 1 60 gallon Each 1 9 OTHER ITEMS Item Description 9-1 Provide armed security personnel 24 hoUrs per day during the entire duration of the contract SUBTOTAL Lonpulpe Quantity IncA language Arabic Description SIZE1 Unit Person 2 g 5 - 4574 ) 49 775- 75- U.Price way. larguef Total :7 L 7- ‘' / .25eceo 5 of 5 ,w74q.rompLe...1* PROJECT BID SHEET PROJECT INFORMATION: PROJECT TITLE: AMARAH PRISON- Building No. 2 and 3 CITYNILLAGE: AL-AMARAH CONTRACTOR INFORMATION (To be completed by the Contractor) t moulage CONTRACTOR'S NAME: CONTRACTOR'S ADDRESS: CONTRACTOR'S PHONE NUMBER: 3(72..ng DATE PREPARED: BID ITEMS (To be completed by the Contractor) alplio, SUMMARY 1 Sitework 5-0 2 Floor Systems 3 Wall & Ceiling Systems 4 Roof Systems 5 Doors and Windows 6 Electrical Systems 7 Mechanical Systems 8 Sanitary & Water Systems 9 Other Items I 7- o 0 2.627.25- 474 0/2. 830 - 7/go•e> TOTAL 23 c."9" “ngl, its SITEWORK Item Description 1-1 Remove and dispose off site all trash and 1-2 debris Demolish unsafe structures and dispose of all debris Replace concrete pavements or walkways 1-3 SUBTOTAL 2 - FLOOR SYSTEMS Item Description 2-1 Remove and dispose damaged floor coverings and install new floor coverings( tiling with new mosaic tiles with filling the joints with white cement and polishing) SUBTOTAL 3 - WALL & CEILING SYSTEMS Item Description 3_1 3-2 Remove damaged plaster from walls or ceilings and repair with mortar and/or gypsum plaster as recuired Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats latex (water based) paint with repairing with technical gypsum 3-3 Prepare wall or ceiling surface, apply 1 coat primer/seater and 2 coats oil based paint 3-4 Build new masonry wall with mortar/plaster finish width 24 cm 3-5 remove the damaged plaster and plastering with cement and and mortar and render.ng with white cement, Prison-buildihg no.2 and 3 Arabic Description *nip Lorpmue 0.9, Aroma. 10101lania.0. Arabic Description Arabic Description awl+ •anITAKI , .01 tir UN**, • OrtiLlrl an01.0. SIZE Unit over all over all SM Quantity U.Price Total 1 1 2Ma ab, 2 mei'. escs 55 Co gi 30x30cm olIKP Quantity Unit SM 170 , SIZE Unit SM SM SM SM SM U.Price • ro.:1.1-.CMA /0 Quantity U.Price amp. (Ara*. 600 5 - 750 2 Total r..= areart /I-0 Total oregl, ei.t>erc.o 150 2- 5 375- 40 1 2 ci>c, 200 1 of 5 Prison-building no.2 and 3 onwagromot remove the damaged plaster and plastering 3-6 with cement and sand mortar (fair face) • 3-7 3-8 Build water fountain with brick and cement 24cm thickness and plastering with cement and sand paint with oil paint 2 layers and acording to instruction Install a new ceiling (I-beam with bricks and 5 cm thick. Of concrete over. SUBTOTAL SM 0 5X1 2 1 M SM 4 ROOF SYSTEMS Item Description Install new downspout plastic 4 inch with all 4-1 requirements Repair parapet walls, fascia, or eaves, with 4-2 rebuilding the damaged parts and plastering for two faces with. cement. Installation Of a new roof Remove tiles and 4-3 old dust and clean the roof. Apply mastic and nylon overlaid by mud and dust. Arabic Description ronamt.a.n. Item Description 5-1 Supply and install internal steel doors using rigged steel bars of diameter (lor 7/8 inch) with bolts and box locks, and using double frame (3 inch) or chanal section (2x5 inch), and as per enclosed drawings of doors (D1,D2,D3,04 05) SIZE Quantity Unit 8, PUOVe U.PriCe Total I ons0, sinus?, [LT.. D1 SM D2 SM D3 SM D4 SM D5 SM 14 08 5"-el 76 ' 8.40 6.30 4 50 3 15 4- ev) 5 - 12) 5c 1/-20 316 - 224- 157-5- 2 of 5 5-2 • Prison-building no.2 and 3 crow I an:asKr Supply and install ventilation window ,double 'Maar, 1.9.3, frames, glass width not exceed 10 cm, to include supply and install glass, security bars, painting and ensure window instalment a against removing, a sample should be provided before executing above works to get final acceptance 5-3 Repair and close existing wall holes SUBTOTAL 6 - ELECTRICAL SYSTEMS Item 6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 Description Install new under ground electrical wiring by using old ducts of by making channal in wall, using seimens type wires and then repairing walls with gypsum. Install new electrical outlet complete with wire (Volex type) Install new wet switchcomplete with all wire Install new fluorescent light fixture complete with wire and starter and tube(philips type) Install new ceiling fan (double ball-bearing type) complete with regulator and wires. Install new telepnone cable (single pair) Install new telephone tack Install new control panel consist of main switch (250 A), circuits, fuses, eath system connection as per drawings Install new circuit breaker 6-9 Arabic Description avian taigisge 0001,1 W1 SM 6 00 W2 SM 1 20 W3 SM 0 75 SM 10 00 SIZE Unit aeon Language uantity over all 1 3,15,20 Amp Each 6 Each 15 Each 24 Each 6 LM 100 Each 1 Each 1 3-phase 18 Lines Each 1 2 95- 33* 4 74; - e-A5- 0 2 6 23-25r U.Price rarmisnauwe 3c. 6 I2 F 95- 2- 5- - Total t—It. S,e,.• a!) z '34.0 27- ga 2c54:4 3 of 5 _ tOU .flO.Q. PitS011-bt:11 -01414 4-16:1 'at ILV'S 6-10 Install new mains cabling from control room to buildings. 6-11 Installing electrical bell 6-12 Instal! main alarm switch in guard room and conectting with main alarm system. SUBTOTAL 7 - MECHANICAL SYSTEMS Item Description rmon I 7-1 Installing the exhaust fan 12 inch with the frame and iron cage Install air coolers (4000 cubic meterthr) 7-2 SUBTOTAL 8 - SANITARY AND WATER SYSTEMS Item Description 8-1 Install new Eastern style toilet complete with flush tank 8-2 Test and clean sanitary drain pipes 8-3 Install new sanitary drain pipes .plastic type, high pressure (10 bar) PVC 8-4 8-5 Clean and repair existing septic tanks (to include new locking hatch covers) Install new septic tank including casting floor and plastering walls from inside (to include locking hatch covers) 8-6 Install new porcelain sink with crome mixer and shut-off valves Install, new water piping (galvanized steel) 8-7 r 4x25 LM big type Each Each SIZE Arabic Description ' 1—c e ro, PPM Unit 12 inch Each Each SIZE Arabic Description n ou• Unit I Each over all 4", 6" LM Each 4x3x2 m, Each Each 3/4,1/2,1 inbh LM co mmt IMP 80 .2_ I goo 1 a 26 1 gcs, Quantity Quantity rrzr. 1 30 1 1 6 70 1 7/oiZ U.Price anmn I snwAA Total .10 3C 0 35- o g 3 U.Price Total OTT 1.0.1). cr5 5' 2- So 'to a 6 ) 6 0 43 40 366 2 g ' 4 of 5 Prison-building no.2 and 3 WY/WV Install new math shut-off valve 8-8 8-9 8-10 8-11 8-12 8-13 8-14 Building brick (24 cm) manholes, plastering them from inside, casting the concrete floor. providing top cover Installing chrome tap 1/2" dia (western made) , all necessary galvanized water pipes 1/2" dia. Outside the wall•with all Supply and install conrete latrine big type Build water fountain (1.2m hight and 50cm width) with plastering and painting 2 layers of oil paint Install new plastic shawer with chrome mixer. Install water electrical boiler (capacity 60 gallon of heater 3000 watt) with electrical and mechanical connection. SUBTOTAL 9 - OTHER ITEMS Tamp largaip 1 inch Each (50 x 50 x 50) cm 1/2 inch 60 gallon Each Each Each LM Each Each 1 12 15 6 6 5 2 2 5 3C 3 0 SIZE Powar ',flaw Item U.Price Description Arabic Description Unit creqr 9-1 Provide armed security personnel 24 hours per day during the entire duration of the contract Person 2 ex, SUBTOTAL 5 of 5 r b(, X.,uryol•twex