EEE-C-00-03-00018-00
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PURPOSE
The purpose of this letter contract is to provide the successful design, rehabilitation, upgrading, reconstruction and construction in Iraq of one port, five airports, electric power systems, road networks and rail systems, municipal water and sanitation services, school and health facilities, select government buildings, and irrigation systems as well as institutional capacity building for operation and maintenance and roadmaps for future longer term needs and investments in support of the Iraq Infrastructure Reconstruction Program.
B.2 CONTRACT TYPE
The letter and definitized contract is Cost-Plus-Fixed-Fee (CPFF) term.
The Government will issue
Job Orders (JOB ORDER) to undertake the design, rehabilitation, reconstruction, construction and upgrading efforts.
Technical Directives will be used to have the assessments undertaken within the limitations set forth in Section G.4.
For the consideration set forth below, the Contractor shall provide the deliverables or outputs described in
Section F.5 in accordance with the performance standards specified herein.
B.3 ESTIMATED COST, FIXED FEE, AND OBLIGATED AMOUNT
(a) The estimated cost for the performance of the work required hereunder, CLIN 0001-0009 and CLIN 11 exclusive of fixed fee, if any, is "To Be The estimated cost Definitized" (TBD). The fixed fee, if any, is TBD.
plus fixed fee, if any, will not exceed $80,000, 000.
(b) The estimated cost for the performance of the work required hereunder, The fixed fee, if 'is TBD.
CLIN 0010, exclusive of fixed fee, if any, The estimated cost-plus fixed fee, if any, is any, is TBD.
no ela va in to
$600, 000,000:00.
(c)
Within the estimated cost plus fixed fee (if any) specified in paragraphs (a) and (b) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the Contractor (and payment of fee, if any) for performance hereunder is $34,600, 000.00. The Contractor shall not exceed the aforesaid obligated amount.
(d)
anticipated to be sufficient Funds obligated hereunder are : through May 16, 2003.
=
Page 1 of 82
EEE-C-00-03-00018-00
B.4
PRICE SCHEDULE
DESCRIPTION
COST
CI.IN
0001
Salaries:
• Term
0001A.
Long
TBD
Nor. of Person days: TBD*
*includes 7-day & 6-day workweeks 0001B Short Term TBD Nbr.of Person Days: TBD $ TBD Fringe Benefits 0002.
0003.
Allowances
TBD
Travel and Transportation
TBD
0004.
0005.
Vehicles including GPS equipment & TBD $.
Equipment and Furnishings
TBD
0006
S
TBD
0007.
Supplies
Other Direct Costs:
0008.
Office Space, utilities and work camp $ TBD 0008A.
0008B
Communications including phones, TBD network, satellite services, radios, etc Vehicle 0008C operation, maintenance and TBD repair Vehicle Insurance 0008D $ TBD.
0008E
Office equipment maintenance and $ TBD repair OOOBF Processing, training & other mobilization costs TBD 0008G TBD 0008H MEDEVAC TBD TBD Local medical support 0008I
-Subcontracts
0009
TBD
Demining
0009A
$
0009B
TBD
$
Quality Assurance Surveying Local Agency Support TBD 0009C 0010 $600, 000,000 Repairs; rehabilitation, reconstruction, construction and upgrading projects Total Estimated Cost TBD $ 0010A Fixed Fee on 0010 (subcontract 0010B TBD portion only) TBD Indirect Costs 0011 Fixed Fee(for CLINS 0001-0009 & 0011 0012 except for Facilities Capital Cost TBD of Money under B.5. Indirect Costs) TOTAL NOT TO EXCEED AMOUNT 9680,000,000- B.5 INDIRECT COSTS (DEC 1997) Pending establishment of revised provisional or final indirect cost rates, allowable indirect costs shall be reimbursed on the basis of the followin negotiated provisional or predetermined rates and the appropriate bases:
Page 2 of 82
EEE-С-00-03-00018-00
Description
Base
Type Period
Rate
Permanent office overhead
Project office overhead
Field/construction
office overhead
General and Administrative Facility Capital Cost Money- permanent office
(b) (4)
Facility Capital Cost of
Money-Project office
Facility Capital Cost of
Money-Construction office
Facility Capital Cost of
Money-General and
Administrative office
Base:
(6) (4)
Page 3 of 82
EEE-C-00-03-00018-00
COST REIMBURSABLE
B. 6
The U.S. dollar costs allowable shall be limited to reasonable, allocable and necessary costs determined in accordance with FAR 52.216-7, Allowable Cost and Payment, FAR 52.216-8, Fixed Fee, if applicable, and AIDAR 752.7003, Documentation for Payment.
=
Page 4 of 82