DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 29, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
1. Rotor for Doura #5, SP left Doura plant today for the Siemens factory.
2. Both Doura #5 and #6, SP, successfully passed hi-pot electrical tests .
3. Qudas plant – As of 2 pm Sunday Feb 29, Unit 1 successfully changed over from gas-oil (diesel) fuel to crude oil firing, currently producing 40 Mw.
Generation:
Peak Power 4187Mw, 90,559Mw hours, 7-day Avg. 4153Mw
Generators Returned to Service 168 Mw Dibis 4, SP 8 Mw Doura 3, SP 70 Mw Najebia 5, SP 90 Mw
Generators Unscheduled Out of Service 1025 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* South Baghdad 4
SP
Low Voltage
30
South Baghdad 5
SP
Boiler Leak
30
Doura 3
SP
Drum Level low
70
Mussaibe 1
SP
Boiler Leak
200
Mussaibe 2
SP
Thrust Bearing problem
200
* Hartha 4
SP
Boiler Leak
80
Baiji 2,
CP
Lubricating oil leak
110
* Qudas 2
CP
Fuel Level low
80
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
20
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
* Najaf 2
CP
Bearing oil leak
50
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report Generators Scheduled Out of Service 1166 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Baiji 3
SP
M
ME
29 Feb 04
29 Apr
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Khor Zubayr 2
CP
M
ME
19 Feb 04
TBD
50
Mosul 8
CP
M
ME
28 Feb 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
200
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
20 Apr
45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
287 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
14 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
28 Feb
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
28 Feb
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Power transferred from North to Middle 810 MW.
Power transferred from South to Middle 275 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1470
29323
1222
Duhok
84
1897
79
Naynawa
300
9323
388
Tamim
135
3471
145
Salah Aldeen
205
4951
206
Anbar
179
4650
194
Dyala
80
2313
96
Babil
90
2700
113
Kirbala
130
2598
108
Najaf
165
3487
145
Kadsya
52
1483
62
Wasit
105
2218
92
Muthana
65
1386
58
Nasirya
135
2923
122
Misan
80
1496
62
Basra
340
7690
320
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-fc92cc83
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 29, 2004
- Date
- 29 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: