DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 26, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Qadisiyah and Kut-Nassirya 400 KV Transmission lines operational now.
Generation:
Peak Power 3931Mw, 76,763Mw hours, 7-day Avg. 3889Mw Generators Returned to Service: (7) 283 Mw Dibis 2, SP 8 Mw Nassirya 2 80 Mw Nassirya 4 100 Mw Mosil 3 15 Mw Hilla 5 15 Mw Khor Zubayr 4 50 Mw Shuaiba 2 15 Mw Generators Unscheduled Out of Service (20) 573 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 3
SP
Tripped-Ground/ Differential 8 South Baghdad 5 SP Boiler Leak 30 Najebia 5 SP Under Frequency 80 Baiji 1 CP Filter 85 Baiji Mobile, 4 CP No Fuel Filters 25 Doura 1,2 CP No gas pressure 40 Mosil 1 CP Rotor Defect 15 Mosil 2 CP Load Gear Oil leak 15 Mosil 9 CP Rotor Defect 15 Old Mulla 9 CP Load gear problems 15 New Mulla 4 CP Oil system problem 30 Qudas 2 CP Bearing problem 95 Shuaiba 1 CP Under Frequency 15 Shuaiba 2 CP Vibrations 15 Taji 1,2 CP No gas pressure 45 Taji 3, CP Compressor 15 Taji 5 CP High Exhaust Temp 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (26) 1318 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
30 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
24 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 7
CP
M
ME
24 Apr 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 1
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 2
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 8
CP
M
ME
17 Apr 04
23 Apr
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
TBD
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
TBD
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 4
CP
M
ME
21 Apr 04
15 JUL
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
129 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Loading
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
30 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
25 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 930 MW.
Power transferred from South to Middle 180 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1350
25121
1047
1369
Duhok
82
1929
80
116
Naynawa
350
7138
297
500
Tamim
145
3086
129
181
Salah Aldeen
220
4230
176
241
Anbar
200
4029
168
231
Dyala
90
1844
77
131
Babil
115
2061
86
135
Kirbala
85
1884
79
111
Najaf
115
2049
85
122
Kadsya
65
1274
53
87
Wasit
100
1967
82
114
Muthana
60
1262
53
75
Nasirya
120
2141
89
116
Misan
65
1275
53
78
Basra
215
4687
195
208
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-f0a85b02
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 26, 2004
- Date
- 26 April 2004
- Category
- Essential Services
- Text available
- English
- Files