# ورقة1
DATE: 16 / 1 / 2004
POWER STATION UNITS CONDATION DURING MAIN PEAK LOAD AT : 18:30 HRS
1 2 3 4 5 6 7 8 9 10 11 12 INST. CAP. AVAIL CAP. PEAK LOAD DAILY PROD.
DBSP F F F 8 60 8 8 204
BAJP 100 F 95 90 P P 1320 285 285 6770
BGSP 25 F 25 F F F 355 50 50 1725
DORP 75 F P P 640 75 75 1838
MUSP 185 150 F 190 1200 525 525 12672
NSRP 160 120 140 P 840 420 420 11036
HRTP 130 P 400 130 130 2395
NJBP 30 90 200 120 120 3129
TOTAL STEAM 5015 1613 1613 39769
GAS 1 2 3 4 5 6 7 8 9 10 11 12
MSLG F F F 16 16 F 16 16 F 17 16 16 200 113 113 2712
MSLEM F 6 F F 6 40 12 12 91
DBSG F P 30 112.5 30 30 650
DBSM S 3 3 S S 50 6 6 52
TAMG F F 13 13 F 13 13 12 12 12 12 F 220 100 100 2416
NTAMG 31 31 30 F F P 222 92 92 2142
TAJG 15 16 F F 16 16 120 62 62 1518
TAJM 7 F 24 7 7 164
DORG 20 20 F 20 150 60 60 1429
HILG 15 F 15 17 80 47 47 1195
NJFG 44 P 44 189 88 88 1882
QDSG 110 110 246 220 220 3185
KAZG 35 30 30 F 252 95 95 2875
SHBG+ DISEAL (2*6) 7 F 40 7 7 151
HMAM 1.5 1.5 5 3 3 18
BAJG 130 S 318 130 130 2112
PETG F 10 F F 80 10 10 240
ZAFR+ SHOM+ DIZEL 22 22 22 285
TOTAL GAS 2348.5 1104 1104 23117
HYDRO 1 2 3 4 5 6 7 8 9 10 11 12
MDM 130 P 130 130 750 390 390 7098
MDR 12 P 12 12 60 36 36 823
MPS 110 S 240 110 110 421
KADH F 65 65 S S P 660 130 130 2256
HMRH P 22 50 22 22 340
SMRH 16 S 16 84 32 32 790
HNDBH 1.5 1.5 S 2 15 5 5 120
KUFH S S S S 5 0 0 0
DOKH 400
DRBH 166
TOTAL HYDRO 2430 725 725 11848
ZHUR 60 60 1428
TURK.LINE 80 80 1944
TOTAL 140 140 3372
TOTAL GEN. 9793.5 3582 3582 78106
1
# ورقة2
ELECTRICITY PRODUCTION STATUS IN MW
DATE:16/ 1 / 2004
REGION INSTALLED AVAILABLE GENERATION EXPORTED IMPORTED RECCOMMENDATION
CAPACITY CAPACITY CAPACITY
NORTH 4163.5 1487 1487 510
REGION
MIDDLE 3818 1313 1313
REGION
SOUTH 1812 782 782 200
REGION
TOTAL 9793.5 3582 3582
BAGHDAD = 1300 MW
MAIN ACT . PEAK LOAD = M.P LOAD + L.SH + F.D
5584 MW = 3582 MW + 1680 MW + 322 MW
Eng. ABDUL HAFOUD HUSSEIN DAOUD Eng. THAIR .E. YACOOUB Director Head OF Planing And Tracing DIRECTOR OF NATIONAL DISPACH CENTER Eng. MAHDI DAHAM JASSIM Eng. SALAH NASIR HASSON Director Head OF Operational Study Dept Director Head OF Operational Dept 2
# ورقة7
DATE :16/ 1 / 2004
N GOV. Average planned load (MW) Average supplied load (MW) Deviation 1 BAGD 1834 1069 765 2 DOHK 114 79 35 3 NYNW 522 414 108 4 TAME 202 165 37 5 SLAH 238 194 44 6 ANBR 223 151 72 7 DYLA 128 73 55 8 BABL 128 78 50 9 KRBL 99 75 24 10 NAJF 124 102 22 11 WAST 118 76 42 12 KADS 83 50 33 13 MUTH 74 46 28 14 THQR 124 110 14 15 MYSN 72 57 15 16 BASR 313 282 31 5
Home / Essential Services / ESS-ee2addee
Essential Services
Jan 16
- Date
- 16 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “ورقة1”: 49 rows × 19 columns
| DATE: 16 / 1 / 2004 | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| POWER STATION | UNITS CONDATION DURING MAIN PEAK LOAD | AT : 18:30 HRS | ||||||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | INST. CAP. | AVAIL CAP. | PEAK LOAD | DAILY PROD. | |
| DBSP | F | F | F | 8 | 60 | 8 | 8 | 204 | ||||||||
| BAJP | 100 | F | 95 | 90 | P | P | 1,320 | 285 | 285 | 6,770 | ||||||
| BGSP | 25 | F | 25 | F | F | F | 355 | 50 | 50 | 1,725 | ||||||
| DORP | 75 | F | P | P | 640 | 75 | 75 | 1,838 | ||||||||
| MUSP | 185 | 150 | F | 190 | 1,200 | 525 | 525 | 12,672 | ||||||||
| NSRP | 160 | 120 | 140 | P | 840 | 420 | 420 | 11,036 | ||||||||
| HRTP | 130 | P | 400 | 130 | 130 | 2,395 | ||||||||||
| NJBP | 30 | 90 | 200 | 120 | 120 | 3,129 | ||||||||||
| TOTAL STEAM | 5,015 | 1,613 | 1,613 | 39,769 | ||||||||||||
| GAS | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| MSLG | F | F | F | 16 | 16 | F | 16 | 16 | F | 17 | 16 | 16 | 200 | 113 | 113 | 2,712 |
| MSLEM | F | 6 | F | F | 6 | 40 | 12 | 12 | 91 | |||||||
| DBSG | F | P | 30 | 112.50 | 30 | 30 | 650 | |||||||||
| DBSM | S | 3 | 3 | S | S | 50 | 6 | 6 | 52 | |||||||
| TAMG | F | F | 13 | 13 | F | 13 | 13 | 12 | 12 | 12 | 12 | F | 220 | 100 | 100 | 2,416 |
| NTAMG | 31 | 31 | 30 | F | F | P | 222 | 92 | 92 | 2,142 | ||||||
| TAJG | 15 | 16 | F | F | 16 | 16 | 120 | 62 | 62 | 1,518 | ||||||
| TAJM | 7 | F | 24 | 7 | 7 | 164 | ||||||||||
| DORG | 20 | 20 | F | 20 | 150 | 60 | 60 | 1,429 | ||||||||
| HILG | 15 | F | 15 | 17 | 80 | 47 | 47 | 1,195 | ||||||||
| NJFG | 44 | P | 44 | 189 | 88 | 88 | 1,882 | |||||||||
| QDSG | 110 | 110 | 246 | 220 | 220 | 3,185 | ||||||||||
| KAZG | 35 | 30 | 30 | F | 252 | 95 | 95 | 2,875 | ||||||||
| SHBG+ DISEAL (2*6) | 7 | F | 40 | 7 | 7 | 151 | ||||||||||
| HMAM | 1.50 | 1.50 | 5 | 3 | 3 | 18 | ||||||||||
| BAJG | 130 | S | 318 | 130 | 130 | 2,112 | ||||||||||
| PETG | F | 10 | F | F | 80 | 10 | 10 | 240 | ||||||||
| ZAFR+ SHOM+ DIZEL | 22 | 22 | 22 | 285 | ||||||||||||
| TOTAL GAS | 2,348.50 | 1,104 | 1,104 | 23,117 | ||||||||||||
| HYDRO | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| MDM | 130 | P | 130 | 130 | 750 | 390 | 390 | 7,098 | ||||||||
| MDR | 12 | P | 12 | 12 | 60 | 36 | 36 | 823 | ||||||||
| MPS | 110 | S | 240 | 110 | 110 | 421 | ||||||||||
| KADH | F | 65 | 65 | S | S | P | 660 | 130 | 130 | 2,256 | ||||||
| HMRH | P | 22 | 50 | 22 | 22 | 340 | ||||||||||
| SMRH | 16 | S | 16 | 84 | 32 | 32 | 790 | |||||||||
| HNDBH | 1.50 | 1.50 | S | 2 | 15 | 5 | 5 | 120 | ||||||||
| KUFH | S | S | S | S | 5 | 0 | 0 | 0 | ||||||||
| DOKH | 400 | |||||||||||||||
| DRBH | 166 | |||||||||||||||
| TOTAL HYDRO | 2,430 | 725 | 725 | 11,848 | ||||||||||||
| ZHUR | 60 | 60 | 1,428 | |||||||||||||
| TURK.LINE | 80 | 80 | 1,944 | |||||||||||||
| TOTAL | 140 | 140 | 3,372 | |||||||||||||
| TOTAL GEN. | 9,793.50 | 3,582 | 3,582 | 78,106 | ||||||||||||
| 1 |
Sheet “ورقة2”: 31 rows × 12 columns
| ELECTRICITY PRODUCTION STATUS IN MW | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DATE:16/ 1 / 2004 | |||||||||||
| REGION | INSTALLED | AVAILABLE | GENERATION | EXPORTED | IMPORTED | RECCOMMENDATION | |||||
| CAPACITY | CAPACITY | CAPACITY | |||||||||
| NORTH | 4,163.50 | 1,487 | 1,487 | 510 | |||||||
| REGION | |||||||||||
| MIDDLE | 3,818 | 1,313 | 1,313 | ||||||||
| REGION | |||||||||||
| SOUTH | 1,812 | 782 | 782 | 200 | |||||||
| REGION | |||||||||||
| TOTAL | 9,793.50 | 3,582 | 3,582 | ||||||||
| BAGHDAD = | 1300 MW | ||||||||||
| MAIN ACT . PEAK LOAD = M.P LOAD + L.SH + F.D | |||||||||||
| 5,584 | MW = | 3,582 | MW + | 1,680 | MW + | 322 | MW | ||||
| Eng. ABDUL HAFOUD HUSSEIN DAOUD | Eng. THAIR .E. YACOOUB | ||||||||||
| Director Head OF Planing And Tracing | DIRECTOR OF NATIONAL DISPACH CENTER | ||||||||||
| Eng. MAHDI DAHAM JASSIM | Eng. SALAH NASIR HASSON | ||||||||||
| Director Head OF Operational Study Dept | Director Head OF Operational Dept | ||||||||||
| 2 |
Sheet “ورقة7”: 21 rows × 5 columns
| DATE :16/ 1 / 2004 | ||||
|---|---|---|---|---|
| N | GOV. | Average planned load (MW) | Average supplied load (MW) | Deviation |
| 1 | BAGD | 1,834 | 1,069 | 765 |
| 2 | DOHK | 114 | 79 | 35 |
| 3 | NYNW | 522 | 414 | 108 |
| 4 | TAME | 202 | 165 | 37 |
| 5 | SLAH | 238 | 194 | 44 |
| 6 | ANBR | 223 | 151 | 72 |
| 7 | DYLA | 128 | 73 | 55 |
| 8 | BABL | 128 | 78 | 50 |
| 9 | KRBL | 99 | 75 | 24 |
| 10 | NAJF | 124 | 102 | 22 |
| 11 | WAST | 118 | 76 | 42 |
| 12 | KADS | 83 | 50 | 33 |
| 13 | MUTH | 74 | 46 | 28 |
| 14 | THQR | 124 | 110 | 14 |
| 15 | MYSN | 72 | 57 | 15 |
| 16 | BASR | 313 | 282 | 31 |
| 5 |