Home / Essential Services / ESS-ee2addee

Essential Services

Jan 16

Date
16 January 2004
Category
Essential Services
Text available
English
Files
1
English original XLSDownload English text

Spreadsheet preview

Sheet “ورقة1”: 49 rows × 19 columns

DATE: 16 / 1 / 2004
POWER STATIONUNITS CONDATION DURING MAIN PEAK LOADAT : 18:30 HRS
123456789101112INST. CAP.AVAIL CAP.PEAK LOADDAILY PROD.
DBSPFFF86088204
BAJP100F9590PP1,3202852856,770
BGSP25F25FFF35550501,725
DORP75FPP64075751,838
MUSP185150F1901,20052552512,672
NSRP160120140P84042042011,036
HRTP130P4001301302,395
NJBP30902001201203,129
TOTAL STEAM5,0151,6131,61339,769
GAS123456789101112
MSLGFFF1616F1616F1716162001131132,712
MSLEMF6FF640121291
DBSGFP30112.503030650
DBSMS33SS506652
TAMGFF1313F131312121212F2201001002,416
NTAMG313130FFP22292922,142
TAJG1516FF161612062621,518
TAJM7F2477164
DORG2020F2015060601,429
HILG15F15178047471,195
NJFG44P4418988881,882
QDSG1101102462202203,185
KAZG353030F25295952,875

# ورقة1 DATE: 16 / 1 / 2004 POWER STATION UNITS CONDATION DURING MAIN PEAK LOAD AT : 18:30 HRS 1 2 3 4 5 6 7 8 9 10 11 12 INST. CAP. AVAIL CAP. PEAK LOAD DAILY PROD. DBSP F F F 8 60 8 8 204 BAJP 100 F 95 90 P P 1320 285 285 6770 BGSP 25 F 25 F F F 355 50 50 1725 DORP 75 F P P 640 75 75 1838 MUSP 185 150 F 190 1200 525 525 12672 NSRP 160 120 140 P 840 420 420 11036 HRTP 130 P 400 130 130 2395 NJBP 30 90 200 120 120 3129 TOTAL STEAM 5015 1613 1613 39769 GAS 1 2 3 4 5 6 7 8 9 10 11 12 MSLG F F F 16 16 F 16 16 F 17 16 16 200 113 113 2712 MSLEM F 6 F F 6 40 12 12 91 DBSG F P 30 112.5 30 30 650 DBSM S 3 3 S S 50 6 6 52 TAMG F F 13 13 F 13 13 12 12 12 12 F 220 100 100 2416 NTAMG 31 31 30 F F P 222 92 92 2142 TAJG 15 16 F F 16 16 120 62 62 1518 TAJM 7 F 24 7 7 164 DORG 20 20 F 20 150 60 60 1429 HILG 15 F 15 17 80 47 47 1195 NJFG 44 P 44 189 88 88 1882 QDSG 110 110 246 220 220 3185 KAZG 35 30 30 F 252 95 95 2875 SHBG+ DISEAL (2*6) 7 F 40 7 7 151 HMAM 1.5 1.5 5 3 3 18 BAJG 130 S 318 130 130 2112 PETG F 10 F F 80 10 10 240 ZAFR+ SHOM+ DIZEL 22 22 22 285 TOTAL GAS 2348.5 1104 1104 23117 HYDRO 1 2 3 4 5 6 7 8 9 10 11 12 MDM 130 P 130 130 750 390 390 7098 MDR 12 P 12 12 60 36 36 823 MPS 110 S 240 110 110 421 KADH F 65 65 S S P 660 130 130 2256 HMRH P 22 50 22 22 340 SMRH 16 S 16 84 32 32 790 HNDBH 1.5 1.5 S 2 15 5 5 120 KUFH S S S S 5 0 0 0 DOKH 400 DRBH 166 TOTAL HYDRO 2430 725 725 11848 ZHUR 60 60 1428 TURK.LINE 80 80 1944 TOTAL 140 140 3372 TOTAL GEN. 9793.5 3582 3582 78106 1 # ورقة2 ELECTRICITY PRODUCTION STATUS IN MW DATE:16/ 1 / 2004 REGION INSTALLED AVAILABLE GENERATION EXPORTED IMPORTED RECCOMMENDATION CAPACITY CAPACITY CAPACITY NORTH 4163.5 1487 1487 510 REGION MIDDLE 3818 1313 1313 REGION SOUTH 1812 782 782 200 REGION TOTAL 9793.5 3582 3582 BAGHDAD = 1300 MW MAIN ACT . PEAK LOAD = M.P LOAD + L.SH + F.D 5584 MW = 3582 MW + 1680 MW + 322 MW Eng. ABDUL HAFOUD HUSSEIN DAOUD Eng. THAIR .E. YACOOUB Director Head OF Planing And Tracing DIRECTOR OF NATIONAL DISPACH CENTER Eng. MAHDI DAHAM JASSIM Eng. SALAH NASIR HASSON Director Head OF Operational Study Dept Director Head OF Operational Dept 2 # ورقة7 DATE :16/ 1 / 2004 N GOV. Average planned load (MW) Average supplied load (MW) Deviation 1 BAGD 1834 1069 765 2 DOHK 114 79 35 3 NYNW 522 414 108 4 TAME 202 165 37 5 SLAH 238 194 44 6 ANBR 223 151 72 7 DYLA 128 73 55 8 BABL 128 78 50 9 KRBL 99 75 24 10 NAJF 124 102 22 11 WAST 118 76 42 12 KADS 83 50 33 13 MUTH 74 46 28 14 THQR 124 110 14 15 MYSN 72 57 15 16 BASR 313 282 31 5