DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 21, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3982Mw, 92,534Mw hours, 7-day Avg. 4199Mw
Generators Returned to Service None Reported
Generators Unscheduled Out of Service 686 Mw 876 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler Leak
8
Dibis 4
SP
Boiler Leak
8
South Baghdad 5
SP
Air Heater
30
South Baghdad 6
SP
Thrust bearing test
30
Nassirya 1
SP
System Cleaning
130
Baiji 1
CP
Line Trip
85
Baiji 2,
CP
Lubricating oil leak
110
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
20
Khor Zubayr 4
CP
Testing
50
Mosil 1
CP
Rotor Defect
15
Mosil 3
CP
Over Voltage
15
Mosil 7
CP
Gas Pressure Low
15
Mosil 9
CP
Rotor Defect
15
Mosil 12
CP
Over Voltage
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 2
CP
Maintenance
30
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 961 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Doura 3
CP
R
GRD/RIE
1 Mar 03
1 Jun
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
15 Feb
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
23 Feb
150
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
Najaf 2
CP
M
GRD/RIE
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
GRD/RIE
13 Jan 04
1 Jun
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
1 Jun
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
1 Jun
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
1 Jun
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
Shuaiba 1
CP
M
ME
14 Feb 04
TBD
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
102 towers complete/211req’d Haditha-Baghd West 400 Sabotage GRD/RIE
22 Mar
45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
29 Feb
281 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
5 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
28 Feb
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
Sabotage
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
1 Jun
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
15 Feb
43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 21 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 220 MW.
Baghdad
1400
Duhok
84
Naynawa
310
Tamim
140
Salah Aldeen
190
Anbar
180
Dyala
100
Babil
100
Kirbala
140
Najaf
125
Kadsya
50
Wasit
70
Muthana
65
Nasirya
136
Misan
60
Basra
320
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-ea07e234
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 21, 2004