Home / Essential Services / ESS-ea07e234

Essential Services

DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 21, 2004

Date
21 February 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 21, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 3982Mw, 92,534Mw hours, 7-day Avg. 4199Mw Generators Returned to Service None Reported Generators Unscheduled Out of Service 686 Mw 876 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Boiler Leak 8 Dibis 4 SP Boiler Leak 8 South Baghdad 5 SP Air Heater 30 South Baghdad 6 SP Thrust bearing test 30 Nassirya 1 SP System Cleaning 130 Baiji 1 CP Line Trip 85 Baiji 2, CP Lubricating oil leak 110 Hilla 1 CP Cooling System problems 20 Hilla 2 CP Servo 20 Khor Zubayr 4 CP Testing 50 Mosil 1 CP Rotor Defect 15 Mosil 3 CP Over Voltage 15 Mosil 7 CP Gas Pressure Low 15 Mosil 9 CP Rotor Defect 15 Mosil 12 CP Over Voltage 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo 15 New Mulla 2 CP Maintenance 30 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji Mobile, 2 CP Software problem 15 * RED – Denotes out of service since last report Generators Scheduled Out of Service 961 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 4 Mar 100 Doura 3 CP R GRD/RIE 1 Mar 03 1 Jun 20 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 Apr 100 Doura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 15 Feb 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Hartha 4 SP M ME/Bechtel 23Oct 03 23 Feb 150 Mussaibe 4 SP M ME 7 Feb 04 7 Mar 180 Najaf 2 CP M GRD/RIE 5 Dec 03 30 Apr 50 New Mulla 1 CP M GRD/RIE 13 Jan 04 1 Jun 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 1 Jun 15 Old Mulla 10 CP M GRD/RIE 6 Jan 04 1 Jun 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 1 Jun 15 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 Shuaiba 1 CP M ME 14 Feb 04 TBD 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May 102 towers complete/211req’d Haditha-Baghd West 400 Sabotage GRD/RIE 22 Mar 45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 29 Feb 281 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 5 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 28 Feb 81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE 24 Jan 27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 Sabotage ME 30 Apr Dibis/Irbil-Quarqush 132 New Line GRD/RIE 1 Jun Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME 15 Feb 43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 May 26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 21 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 750 MW. Power transferred from South to Middle 220 MW. Baghdad 1400 Duhok 84 Naynawa 310 Tamim 140 Salah Aldeen 190 Anbar 180 Dyala 100 Babil 100 Kirbala 140 Najaf 125 Kadsya 50 Wasit 70 Muthana 65 Nasirya 136 Misan 60 Basra 320 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3