Electrical System Status on 30/12/2003
A- Steam Power Stations
Power StationsFuel
Use No. of UnitsNo. of Operating UnitsUnits LoadTotal Load MWRemarks123456DibisN.G4210/128-816No.1 prog maint.
No.3 FDF25/1/04BaijiF.O62--80100-5/12180No.1Stopped at 24 hrs at 0050 leakage No 2 stopped at 350 low air flow No.5 Rehab.
No.6 prog maint19/1/04DuraF.O4180---80No.4 leak in econom.
No (5+6) Rehab.S. Bagh.F.O643525-301/1230120No.3 boiler leakage No. 5 prog maint.15/1/04MussaibeC.O + F.O43210150210570No.3 prog maint.18/12NassiryaC.O4213014528/12275No.3 leak in aux. stean.
No.4 prog. maint.28/1/04NajebiaN.G + C.O21-3535No 4 boiler leak. No 5 one boiler HarthaN.G + C.O416023/1060No.4 Progr. maint. No 1 min . load 23/12 Total1336B – Gas Power Stations C – Hydro Power Stations Power StationsNo. of UnitsNo. of Operating UnitsStation load MW Fuel use Gas press RemarksPower StationsNo. of UnitsNo. of Operating UnitsStation load MWDischarge M3/SBaiji21110G.ONo.2 . unsufic fuel.Musil Dam Main43390Quds22130G.O37 truckMusil Dam reg4330450Mosil12812530No.1 Rotor defec..No2 servo ACC. No.3 pearing mint. No 9 roter defectMusil Pumping21110Dibis313033No.(4+5). Rehab. No.6 Synch at 1810 in 28/12Haditha Dam62140300Old Mulla12580540No.1 ACC .gear No.2 servo N o 4 tripped at 2230 Vib No 5 prog main. No 6 Acc ger No 9 tripped at 725 HET No7 prog main No 12 Rehab Samarra3240350New Mulla6413534No. 5 prog .maint.
No.6 Generator defect.Himrin212290Taji723420No.4 Turbine No.3 Compressor.
No 5 pilot excit No 6 tripped at 0032 Aux.No.7 Rehab. Hindia444M. Taji21720No. 2 Software.Kufa4--Dura437521No.3 Rehab. Total926Hilla 4 4 70 34
System Generation = 79103
MWh
Najaf
3
2
100
32
No.2 prog. maint.
Syrian Line Generation = 891 MWh Khor43120NGNo.4 Rehab. Turkey line Generation = 1866MWhTotal Generation = 81860MWhShuaiba2--NG No 1 S/BSystem peak Load = 3414MWM. Shuaiba 2
-
-
NG
Split with refinary
Syrian Line Peak Load = 10 MW Petro 4 1
-
NG
Turkey Line Peak Load = 78 MW M. Dibis 4 2 7 NG
Total Peak Load = 3502
MW
Mossil East
5
4
15
G.O
Equv. Peak load = 3502+1600+315=5417 MW Hmam + Zafranya 7 2 3 GO
Baghdad Load = 1520
MW
Diesel
Sets
Sets
5
GO
Total
1046
NG: Natural Gas FO: Fuel oil CO: Crude oil Start End
D.G
Mohsen T. Hassan
Gas press: Natural Gas GO: Gas oil FO: fuel oil CO: Crude oil
Programmed maint.
Home / Essential Services / ESS-e7560e04
Essential Services
Electrical System Status on 30/12/2003
- Date
- 30 December 2003
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: