Sheet “A-Steam Power Stations”: 13 rows × 13 columns

REPORT DATE -3 DECEMBER 2003
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas410008824No.1 loss of flame. No. 3 boiler leak. No. 2 stopped at 0053 FWP.
BaijiFuel Oil65100759085085435500No. 5 rehab.
DuraFuel Oil417500075180No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South BaghdadFuel Oil6335250350095200No. 6 programmed mnt 11 NOV to 26 DEC. No. 5 boiler leak. No. 3 boiler leak.
MussaibeCrude and Fuel Oil432101000220530860No. 2 synch 1423. No. 3 program mnt 5 NOV to 20 DEC.
NassiryaCrude431501500100400600No. 3 programmed mnt 11 NOV to 11 DEC.
NajebiaNatural Gas and Crude2108585160No. 4 programmed mnt 6 NOV to 21 DEC.
HarthaNatural Gas and Crude411500150300No. 4 Programmed Maintenance from 23 OCT to 23 DEC.
Total:1,7782,824
# A-Steam Power Stations REPORT DATE -3 DECEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 0 0 0 8 8 24 No.1 loss of flame. No. 3 boiler leak. No. 2 stopped at 0053 FWP. Baiji Fuel Oil 6 5 100 75 90 85 0 85 435 500 No. 5 rehab. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 3 35 25 0 35 0 0 95 200 No. 6 programmed mnt 11 NOV to 26 DEC. No. 5 boiler leak. No. 3 boiler leak. Mussaibe Crude and Fuel Oil 4 3 210 100 0 220 530 860 No. 2 synch 1423. No. 3 program mnt 5 NOV to 20 DEC. Nassirya Crude 4 3 150 150 0 100 400 600 No. 3 programmed mnt 11 NOV to 11 DEC. Najebia Natural Gas and Crude 2 1 0 85 85 160 No. 4 programmed mnt 6 NOV to 21 DEC. Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Programmed Maintenance from 23 OCT to 23 DEC. Total: 1778 2824 # B- Gas_C-Power Stations Report Date- 3 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 110 125 Gas Oil No. 2 problem in lube system. Musil Dam Main 4 2 180 600 Quds 2 2 210 160 Gas Oil 40 trucks. Musil Dam reg 4 3 30 60 450 Mosil 12 6 105 150 17 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. No. 4 vibration. No. 7 stopped 0806 vibration. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 20 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. Haditha Dam 6 2 90 160 300 Old Mulla 12 7 95 128 22 No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. No. 3 tripped HET. Samarra 3 2 40 55 550 New Mulla 6 3 90 173 28 No. 6 Generator Defective. No. 3 prog. Mnt. No. 1 EF. Himrin 2 1 18 21 75 Taji 7 3 50 55 15 No. 5 clutch. No.7 Rehabilitation. No. 2 look out gen. No. 4 stopped 1730 generator look out. Hindia 4 4 5 5 120 M. Taji 2 0 0 20 0 NGPL Kufa 4 0 0 1 60 Dura 4 2 30 30 15 No.3 Rehabilitation. No. 1 control. Total 363 896 Hilla 4 4 65 64 24 System Generation 72282 MWh Najaf 3 3 110 129 20 Syrian Line Generation 1382 MWh Khor 4 1 30 80 Natural Gas No. 4: Rehabilitation. No. 1 vibration. No. 3 stopped 1235 fire in control Turkey Line Generation 1653 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 programmed mnt for 4 days. Total Generation 75317 MWh Petro 4 0 0 0 Natural Gas System Peak Load 3486 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 63 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 80 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3706 MW Total 905 1233 Baghdad Load 1350 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 3 DECEMBER, 2003 Baghdad 1350 27016 1125.6667 Power transferred from North to Middle 775 MW Duhok 80 1632 68 Naynawa 315 5715 238.125 Power transferred from South to Middle 160 MW Tamim 135 3240 135 Salah Aldeen 215 4601 191.7083 Anbar 205 3990 166.25 Dyala 77 1714 71.4167 Babil 105 2063 85.9583 Kirbala 90 1252 52.1667 Najaf 85 2030 84.5833 Kadsya 70 1394 58.0833 Wasit 100 2070 86.25 Muthana 60 1403 58.4583 Nasirya 110 2647 110.2917 Misan 60 1443 60.125 Basra 210 6078 253.25 3267