# A-Steam Power Stations
REPORT DATE -22 NOVEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 3 8 0 8 8 24 24 No. 2 Boiler Leakage.
Baiji Fuel Oil 6 4 100 80 95 0 0 85 360 500 No. 5 rehab. No. 4 boiler leak.
Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South Baghdad Fuel Oil 6 3 35 25 30 0 0 0 90 200 No. 6 programmed mnt 11 NOV to 26 DEC. No. 4 hydraulic. No. 5 stopped 1145 boiler leak.
Mussaibe Crude and Fuel Oil 4 2 140 0 0 210 350 860 No. 2 program mnt 20 OCT to 12 NOV prob in field breaker. No. 3 program mnt 5 NOV to 20 DEC.
Nassirya Crude 4 3 145 160 0 120 425 600 No. 3 programmed mnt 11 NOV to 11 DEC. No. 4 expan.
Najebia Natural Gas and Crude 2 1 0 85 85 160 No. 4 programmed mnt 6 NOV to 21 DEC.
Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Programmed Maintenance from 23 OCT to 23 DEC.
Total: 1559 2824
# B- Gas_C-Power Stations
Report Date- 22 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 115 125 Gas Oil No. 1 s/b. Musil Dam Main 4 1 80 600 Quds 2 2 80 160 Gas Oil 44 trucks. Musil Dam reg 4 3 37 60 450 Mosil 12 8 125 150 33 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 32 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. Haditha Dam 6 2 110 160 300 Old Mulla 12 7 95 128 29 No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. No. 6 gene. Prot. Samarra 3 3 57 55 540 New Mulla 6 3 110 173 31 No. 6 Generator Defective. No. 4 cooling fan. No. 3 prog. Mnt. Himrin 2 2 32 21 130 Taji 7 5 80 55 14 No. 5 Diesel. No.7 Rehabilitation. No. 2 synch at 1120. Hindia 4 4 5 5 220 M. Taji 2 0 0 20 0 NGPL Kufa 4 0 0 1 Dura 4 2 40 30 15 No.3 Rehabilitation. No. 1 control. Total 321 896 Hilla 4 4 70 64 21 System Generation 72446 MWh Najaf 3 3 115 129 21 Syrian Line Generation 1393 MWh Khor 4 3 100 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 2021 MWh Shuaiba 2 0 0 20 Natural Gas No. 1 Programmed Maintenance. No. 2 stopped 1520 NGPL. Total Generation 75860 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3700 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 52 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3889 MW Total 940 1233 Baghdad Load 1400 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 22 NOVEMBER, 2003 Baghdad 1400 25935 1080.625 Power transferred from North to Middle 750 MW Duhok 52 1954 81.4167 Naynawa 300 6677 278.2083 Power transferred from South to Middle 200 MW Tamim 135 3315 138.125 Salah Aldeen 200 4547 189.4583 Anbar 190 3762 156.75 Dyala 90 1812 75.5 Babil 110 2051 85.4583 Kirbala 85 1725 71.875 Najaf 110 2283 95.125 Kadsya 80 1463 60.9583 Wasit 80 2457 102.375 Muthana 60 1425 59.375 Nasirya 125 2672 111.3333 Misan 60 1424 59.3333 Basra 290 6812 283.8333 3367
Home / Essential Services / ESS-d5ae9dfe
Essential Services
power system23nov03
- Date
- 22 November 2003
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 13 rows × 13 columns
| REPORT DATE -22 NOVEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 3 | 8 | 0 | 8 | 8 | 24 | 24 | No. 2 Boiler Leakage. | ||
| Baiji | Fuel Oil | 6 | 4 | 100 | 80 | 95 | 0 | 0 | 85 | 360 | 500 | No. 5 rehab. No. 4 boiler leak. |
| Dura | Fuel Oil | 4 | 1 | 75 | 0 | 0 | 0 | 75 | 180 | No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. | ||
| South Baghdad | Fuel Oil | 6 | 3 | 35 | 25 | 30 | 0 | 0 | 0 | 90 | 200 | No. 6 programmed mnt 11 NOV to 26 DEC. No. 4 hydraulic. No. 5 stopped 1145 boiler leak. |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 140 | 0 | 0 | 210 | 350 | 860 | No. 2 program mnt 20 OCT to 12 NOV prob in field breaker. No. 3 program mnt 5 NOV to 20 DEC. | ||
| Nassirya | Crude | 4 | 3 | 145 | 160 | 0 | 120 | 425 | 600 | No. 3 programmed mnt 11 NOV to 11 DEC. No. 4 expan. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 85 | 85 | 160 | No. 4 programmed mnt 6 NOV to 21 DEC. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 150 | 0 | 150 | 300 | No. 4 Programmed Maintenance from 23 OCT to 23 DEC. | ||||
| Total: | 1,559 | 2,824 |
Sheet “B- Gas_C-Power Stations”: 25 rows × 13 columns
| Report Date- 22 NOVEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 115 | 125 | Gas Oil | No. 1 s/b. | Musil Dam Main | 4 | 1 | 80 | 600 | |
| Quds | 2 | 2 | 80 | 160 | Gas Oil | 44 trucks. | Musil Dam reg | 4 | 3 | 37 | 60 | 450 |
| Mosil | 12 | 8 | 125 | 150 | 33 | No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 32 | No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. | Haditha Dam | 6 | 2 | 110 | 160 | 300 |
| Old Mulla | 12 | 7 | 95 | 128 | 29 | No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. No. 6 gene. Prot. | Samarra | 3 | 3 | 57 | 55 | 540 |
| New Mulla | 6 | 3 | 110 | 173 | 31 | No. 6 Generator Defective. No. 4 cooling fan. No. 3 prog. Mnt. | Himrin | 2 | 2 | 32 | 21 | 130 |
| Taji | 7 | 5 | 80 | 55 | 14 | No. 5 Diesel. No.7 Rehabilitation. No. 2 synch at 1120. | Hindia | 4 | 4 | 5 | 5 | 220 |
| M. Taji | 2 | 0 | 0 | 20 | 0 | NGPL | Kufa | 4 | 0 | 0 | 1 | |
| Dura | 4 | 2 | 40 | 30 | 15 | No.3 Rehabilitation. No. 1 control. | Total | 321 | 896 | |||
| Hilla | 4 | 4 | 70 | 64 | 21 | System Generation | 72,446 | MWh | ||||
| Najaf | 3 | 3 | 115 | 129 | 21 | Syrian Line Generation | 1,393 | MWh | ||||
| Khor | 4 | 3 | 100 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 2,021 | MWh | |||
| Shuaiba | 2 | 0 | 0 | 20 | Natural Gas | No. 1 Programmed Maintenance. No. 2 stopped 1520 NGPL. | Total Generation | 75,860 | MWh | |||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | System Peak Load | 3,700 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 52 | MW | ||||
| Hmam | 2 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Total Peak Load | 3,889 | MW | ||||||||||
| Total | 940 | 1,233 | Baghdad Load | 1,400 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 21 rows × 5 columns · preview of the first 19 rows; full file from the original button
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 22 NOVEMBER, 2003 |
|---|---|---|---|---|
| Baghdad | 1,400 | 25,935 | 1,080.62 | Power transferred from North to Middle 750 MW |
| Duhok | 52 | 1,954 | 81.42 | |
| Naynawa | 300 | 6,677 | 278.21 | Power transferred from South to Middle 200 MW |
| Tamim | 135 | 3,315 | 138.12 | |
| Salah Aldeen | 200 | 4,547 | 189.46 | |
| Anbar | 190 | 3,762 | 156.75 | |
| Dyala | 90 | 1,812 | 75.50 | |
| Babil | 110 | 2,051 | 85.46 | |
| Kirbala | 85 | 1,725 | 71.88 | |
| Najaf | 110 | 2,283 | 95.12 | |
| Kadsya | 80 | 1,463 | 60.96 | |
| Wasit | 80 | 2,457 | 102.38 | |
| Muthana | 60 | 1,425 | 59.38 | |
| Nasirya | 125 | 2,672 | 111.33 | |
| Misan | 60 | 1,424 | 59.33 | |
| Basra | 290 | 6,812 | 283.83 | |
| 3,367 |