DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 5, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3774Mw, 84,170Mw hours, 7-day Avg. 3978Mw
Generators Returned to Service: 130 Mw Baiji 1, SP 100 Mw Dibis 5, CP 30 Mw
Generators Unscheduled Out of Service 673 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler Leak
8
Baiji 6
SP
Trip Valve
100
South Baghdad 4
SP
Boiler Leak
30
* Najebia 4
SP
Boiler Leak
90
Baiji 2,
CP
Lubricating oil leak
110
Qudas 1
CP
Fuel Pump
100
Hilla 2
CP
Servo
20
Khor Zubayr 3
CP
Generator Transf. Prob.
50
Mosil 1
CP
Rotor Defect
15
* Mosil 3
CP
Circuit Breaker
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
Old Mulla 7
CP
Load gear
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1101 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Baiji 3
SP
M
GRD/RIE
29 Feb 04
30 Jun
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
200
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
101 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
293 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
22 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
3 Mar
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
28 Feb
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 5 MARCH 2004 Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 270 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1350
Duhok
82
Naynawa
300
Tamim
125
Salah Aldeen
190
Anbar
150
Dyala
91
Babil
90
Kirbala
100
Najaf
101
Kadsya
65
Wasit
80
Muthana
55
Nasirya
120
Misan
60
Basra
300
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3
Home / Essential Services / ESS-d2a96bfc
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 5, 2004
- Date
- 5 March 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: