# A-Steam Power Stations
REPORT DATE -7 DECEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 0 0 0 8 8 24 No.1 loss of protection. No. 3 boiler leak. No. 2 FWP.
Baiji Fuel Oil 6 3 100 85 90 0 0 0 275 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 4 tripped 2310 condenser.
Dura Fuel Oil 4 0 0 0 0 0 0 180 No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation. No. 3 tripped 0020 safety valve closed.
South Baghdad Fuel Oil 6 4 35 25 30 35 0 0 125 200 No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 6 DEC to 12 JAN. No. 3 synch 0320.
Mussaibe Crude and Fuel Oil 4 3 205 150 0 210 565 860 No. 3 program mnt 3 NOV to 18 DEC. No. 2 synch 1800.
Nassirya Crude 4 3 150 150 0 100 400 600 No. 3 mnt 11 NOV to 11 DEC. No. 4 limited to vacuum.
Najebia Natural Gas and Crude 2 1 0 80 80 160 No. 4 mnt 4 NOV to 22 DEC.
Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1603 2824
# B- Gas_C-Power Stations
Report Date- 7 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 110 125 Gas Oil No. 2 lube oil leak. Musil Dam Main 4 2 180 600 Quds 2 0 0 160 Gas Oil 38 trucks. No. 1 & 2 tripped 0627 low fuel pressure. Musil Dam reg 4 3 32 60 450 Mosil 12 8 125 150 27 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 25 No. 4, 5& 6 rehab. Haditha Dam 6 2 100 160 350 Old Mulla 12 8 110 128 22 No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. Samarra 3 2 40 55 0 New Mulla 6 4 120 173 25 No. 6 Generator Defective. No. 3 Mnt. No. 1 EF. No. 4 synch 1355. Himrin 2 1 18 21 75 Taji 7 3 55 55 20 No. 5 clutch. No.7 Rehabilitation. No. 2 mnt. No. 4 generator look out. Hindia 4 2 4 5 100 M. Taji 2 0 0 20 N/A No. 1 and 2 software. Kufa 4 0 0 1 0 Dura 4 3 70 30 18 No.3 Rehabilitation. Total 374 896 Hilla 4 4 70 64 26 System Generation 74602 MWh Najaf 3 2 95 129 23 No. 2 program mnt. Syrian Line Generation 972 MWh Khor 4 3 85 80 Natural Gas No. 4: Rehabilitation. Limited to load flier. Turkey Line Generation 1298 MWh Shuaiba 2 1 5 20 Natural Gas No. 1 S/B. Total Generation 76872 MWh Petro 4 0 0 0 Natural Gas System Peak Load 3613 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 30 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 0 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3720 MW Total 845 1233 Baghdad Load 1250 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 7 DECEMBER, 2003 Baghdad 1350 27280 1136.6667 Power transferred from North to Middle 700 MW.
Duhok 0 1191 49.625
Naynawa 310 7587 316.125 Power transferred from South to Middle 190 MW.
Tamim 150 3206 133.5833
Salah Aldeen 190 4366 181.9167 Anbar 194 4070 169.5833 Dyala 95 1884 78.5 Babil 90 2131 88.7917 Kirbala 78 1721 71.7083 Najaf 90 2010 83.75 Kadsya 95 1410 58.75 Wasit 90 2126 88.5833 Muthana 60 1484 61.8333 Nasirya 125 2696 112.3333 Misan 60 1397 58.2083 Basra 270 6315 263.125 3247
Home / Essential Services / ESS-c5e05a76
Essential Services
Power System 8 dec
- Date
- 8 December 2003
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 13 rows × 13 columns
| REPORT DATE -7 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 0 | 0 | 0 | 8 | 8 | 24 | No.1 loss of protection. No. 3 boiler leak. No. 2 FWP. | ||
| Baiji | Fuel Oil | 6 | 3 | 100 | 85 | 90 | 0 | 0 | 0 | 275 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 4 tripped 2310 condenser. |
| Dura | Fuel Oil | 4 | 0 | 0 | 0 | 0 | 0 | 0 | 180 | No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation. No. 3 tripped 0020 safety valve closed. | ||
| South Baghdad | Fuel Oil | 6 | 4 | 35 | 25 | 30 | 35 | 0 | 0 | 125 | 200 | No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 6 DEC to 12 JAN. No. 3 synch 0320. |
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 205 | 150 | 0 | 210 | 565 | 860 | No. 3 program mnt 3 NOV to 18 DEC. No. 2 synch 1800. | ||
| Nassirya | Crude | 4 | 3 | 150 | 150 | 0 | 100 | 400 | 600 | No. 3 mnt 11 NOV to 11 DEC. No. 4 limited to vacuum. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 80 | 80 | 160 | No. 4 mnt 4 NOV to 22 DEC. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 150 | 0 | 150 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,603 | 2,824 |
Sheet “B- Gas_C-Power Stations”: 25 rows × 13 columns
| Report Date- 7 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 110 | 125 | Gas Oil | No. 2 lube oil leak. | Musil Dam Main | 4 | 2 | 180 | 600 | |
| Quds | 2 | 0 | 0 | 160 | Gas Oil | 38 trucks. No. 1 & 2 tripped 0627 low fuel pressure. | Musil Dam reg | 4 | 3 | 32 | 60 | 450 |
| Mosil | 12 | 8 | 125 | 150 | 27 | No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 25 | No. 4, 5& 6 rehab. | Haditha Dam | 6 | 2 | 100 | 160 | 350 |
| Old Mulla | 12 | 8 | 110 | 128 | 22 | No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. | Samarra | 3 | 2 | 40 | 55 | 0 |
| New Mulla | 6 | 4 | 120 | 173 | 25 | No. 6 Generator Defective. No. 3 Mnt. No. 1 EF. No. 4 synch 1355. | Himrin | 2 | 1 | 18 | 21 | 75 |
| Taji | 7 | 3 | 55 | 55 | 20 | No. 5 clutch. No.7 Rehabilitation. No. 2 mnt. No. 4 generator look out. | Hindia | 4 | 2 | 4 | 5 | 100 |
| M. Taji | 2 | 0 | 0 | 20 | N/A | No. 1 and 2 software. | Kufa | 4 | 0 | 0 | 1 | 0 |
| Dura | 4 | 3 | 70 | 30 | 18 | No.3 Rehabilitation. | Total | 374 | 896 | |||
| Hilla | 4 | 4 | 70 | 64 | 26 | System Generation | 74,602 | MWh | ||||
| Najaf | 3 | 2 | 95 | 129 | 23 | No. 2 program mnt. | Syrian Line Generation | 972 | MWh | |||
| Khor | 4 | 3 | 85 | 80 | Natural Gas | No. 4: Rehabilitation. Limited to load flier. | Turkey Line Generation | 1,298 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | No. 1 S/B. | Total Generation | 76,872 | MWh | |||
| Petro | 4 | 0 | 0 | 0 | Natural Gas | System Peak Load | 3,613 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 30 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 0 | MW | ||||
| Hmam | 2 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Total Peak Load | 3,720 | MW | ||||||||||
| Total | 845 | 1,233 | Baghdad Load | 1,250 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 21 rows × 5 columns · preview of the first 19 rows; full file from the original button
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 7 DECEMBER, 2003 |
|---|---|---|---|---|
| Baghdad | 1,350 | 27,280 | 1,136.67 | Power transferred from North to Middle 700 MW. |
| Duhok | 0 | 1,191 | 49.62 | |
| Naynawa | 310 | 7,587 | 316.12 | Power transferred from South to Middle 190 MW. |
| Tamim | 150 | 3,206 | 133.58 | |
| Salah Aldeen | 190 | 4,366 | 181.92 | |
| Anbar | 194 | 4,070 | 169.58 | |
| Dyala | 95 | 1,884 | 78.50 | |
| Babil | 90 | 2,131 | 88.79 | |
| Kirbala | 78 | 1,721 | 71.71 | |
| Najaf | 90 | 2,010 | 83.75 | |
| Kadsya | 95 | 1,410 | 58.75 | |
| Wasit | 90 | 2,126 | 88.58 | |
| Muthana | 60 | 1,484 | 61.83 | |
| Nasirya | 125 | 2,696 | 112.33 | |
| Misan | 60 | 1,397 | 58.21 | |
| Basra | 270 | 6,315 | 263.12 | |
| 3,247 |