# A-Steam Power Stations
Reporting Peak for 14 MARCH 2004 / Report Date - 15 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 0 24 #1 stopped at 1841 NGPL; #2 boiler leakage; #3 prog maint; #4 fuel filters Baiji Fuel Oil 6 3 85 85 90 260 500 #2 & #3 prog maint; #5 forced outage Daura Fuel Oil 4 1 70 70 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 30 30 60 200 #1 & #2 prog maint; #3 gen earth; #5 a/h; #6 synch at 1153 Mussaibe Crude and Fuel Oil 4 1 215 215 860 #1 stopped at 152 burner problem; #2 prog maint; #4 prog maint Nassirya Crude 4 3 130 130 150 410 600 #2 prog maint Najebia Natural Gas and Crude 2 2 80 85 165 160 Hartha Natural Gas and Crude 4 2 50 60 110 300 load flow problem Out of Service for Unscheduled Maintanence Total: 1290 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 14 MARCH 2004 / Report Date - 15 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 199 125 Gas Oil #1 heavy oil; #2 lub oil Musil Dam Main 4 4 620 600 Quds 2 2 155 160 Gas Oil 29 trucks Musil Dam reg 4 3 26 60 1100 Mosil 12 9 120 150 30 #1 & #9 rotor defect; #11 h.p. Musil Pumping 2 1 110 0 Dibis 3 2 55 30 27 #4 rehab Haditha Dam 6 3 210 160 1250 Old Mulla 12 8 143 128 440 #1 acc gear; #2 servo; #12 needs rehab Samarra 3 3 78 55 780 New Mulla 6 4 122 173 2.9 #2 prog maint; #6 generator defect Himrin 2 2 50 21 200 Taji 7 55 #3 compressor; #7 needs rehab - no control card n.g. press low Hindia 4 4 5 5 160 M. Taji 2 18 #2 software & NGPL Kufa 4 3 2 0 60 Daura 4 30 #2 prog maint; #3 needs rehab ng press low Total 1101 896 Hilla 4 3 50 64 33 #1 synch at 1350; #2 synch at 1333; #3 prog maint; #4 synch at 1350 System Generation 81395 MWh Najaf 3 3 132 129 30 Syrian Line Generation 1412 MWh Khor 4 3 90 80 Natural Gas #4 gen prot Turkey Line Generation 1853 MWh Shuaiba 2 1 2 20 Natural Gas #1 prog maint Total Generation 90087 MWh M. Shuaiba 2 Natural Gas System Peak Load 3712 MW Petro 4 0 Natural Gas #2 vib Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 85 MW Mossil East 5 3 15 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4121 MW Diesel 46 Gas Oil Baghdad Load 1425 MW Total 1140 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 14 MARCH 2004 / Report Date - 15 MARCH 2004 Power transferred from North to Middle 870 MW.
Power transferred from South to Middle 205 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1425 30024 1251 Duhok 85 1912 80 Naynawa 340 8669 361 Tamim 125 3420 143 Salah Aldeen 220 5161 215 Anbar 210 4728 197 Dyala 112 2521 105 Babil 104 2647 110 Kirbala 85 1944 81 Najaf 95 2351 98 Kadsya 100 2082 87 Wasit 108 2342 98 Muthana 68 1508 63 Nasirya 132 2783 116 Misan 70 1544 64 Basra 325 6335 264
Home / Essential Services / ESS-c334368f
Essential Services
System Status Mar 15
- Date
- 15 March 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 14 MARCH 2004 / Report Date - 15 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 0 | 24 | #1 stopped at 1841 NGPL; #2 boiler leakage; #3 prog maint; #4 fuel filters | |||||||
| Baiji | Fuel Oil | 6 | 3 | 85 | 85 | 90 | 260 | 500 | #2 & #3 prog maint; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 1 | 70 | 70 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 2 | 30 | 30 | 60 | 200 | #1 & #2 prog maint; #3 gen earth; #5 a/h; #6 synch at 1153 | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 1 | 215 | 215 | 860 | #1 stopped at 152 burner problem; #2 prog maint; #4 prog maint | |||||
| Nassirya | Crude | 4 | 3 | 130 | 130 | 150 | 410 | 600 | #2 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 80 | 85 | 165 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 2 | 50 | 60 | 110 | 300 | load flow problem | ||||
| Out of Service for Unscheduled Maintanence | Total: | 1,290 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Reporting Peak for 14 MARCH 2004 / Report Date - 15 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 199 | 125 | Gas Oil | #1 heavy oil; #2 lub oil | Musil Dam Main | 4 | 4 | 620 | 600 | |
| Quds | 2 | 2 | 155 | 160 | Gas Oil | 29 trucks | Musil Dam reg | 4 | 3 | 26 | 60 | 1,100 |
| Mosil | 12 | 9 | 120 | 150 | 30 | #1 & #9 rotor defect; #11 h.p. | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 55 | 30 | 27 | #4 rehab | Haditha Dam | 6 | 3 | 210 | 160 | 1,250 |
| Old Mulla | 12 | 8 | 143 | 128 | 440 | #1 acc gear; #2 servo; #12 needs rehab | Samarra | 3 | 3 | 78 | 55 | 780 |
| New Mulla | 6 | 4 | 122 | 173 | 2.90 | #2 prog maint; #6 generator defect | Himrin | 2 | 2 | 50 | 21 | 200 |
| Taji | 7 | 55 | #3 compressor; #7 needs rehab - no control card n.g. press low | Hindia | 4 | 4 | 5 | 5 | 160 | |||
| M. Taji | 2 | 18 | #2 software & NGPL | Kufa | 4 | 3 | 2 | 0 | 60 | |||
| Daura | 4 | 30 | #2 prog maint; #3 needs rehab ng press low | Total | 1,101 | 896 | ||||||
| Hilla | 4 | 3 | 50 | 64 | 33 | #1 synch at 1350; #2 synch at 1333; #3 prog maint; #4 synch at 1350 | System Generation | 81,395 | MWh | |||
| Najaf | 3 | 3 | 132 | 129 | 30 | Syrian Line Generation | 1,412 | MWh | ||||
| Khor | 4 | 3 | 90 | 80 | Natural Gas | #4 gen prot | Turkey Line Generation | 1,853 | MWh | |||
| Shuaiba | 2 | 1 | 2 | 20 | Natural Gas | #1 prog maint | Total Generation | 90,087 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,712 | MW | |||||||
| Petro | 4 | 0 | Natural Gas | #2 vib | Syria Peak Load | 60 | MW | |||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 85 | MW | ||||
| Mossil East | 5 | 3 | 15 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Total Peak Load | 4,121 | MW | |||||
| Diesel | 46 | Gas Oil | Baghdad Load | 1,425 | MW | |||||||
| Total | 1,140 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 14 MARCH 2004 / Report Date - 15 MARCH 2004 | |||
|---|---|---|---|
| Power transferred from North to Middle 870 MW. | |||
| Power transferred from South to Middle 205 MW. | |||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,425 | 30,024 | 1,251 |
| Duhok | 85 | 1,912 | 80 |
| Naynawa | 340 | 8,669 | 361 |
| Tamim | 125 | 3,420 | 143 |
| Salah Aldeen | 220 | 5,161 | 215 |
| Anbar | 210 | 4,728 | 197 |
| Dyala | 112 | 2,521 | 105 |
| Babil | 104 | 2,647 | 110 |
| Kirbala | 85 | 1,944 | 81 |
| Najaf | 95 | 2,351 | 98 |
| Kadsya | 100 | 2,082 | 87 |
| Wasit | 108 | 2,342 | 98 |
| Muthana | 68 | 1,508 | 63 |
| Nasirya | 132 | 2,783 | 116 |
| Misan | 70 | 1,544 | 64 |
| Basra | 325 | 6,335 | 264 |