DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 20, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: We should begin to see a gradual climb in generation as units return from maintenance.
Generation:
Peak Power 3866Mw, 76,387Mw hours, 7-day Avg. 3673Mw Turkish Region Average Generation 169.5 Mw (not included in Peak Power)
Generators Returned to Service: (5) 365 Mw Hartha 4 180 Mw Qudas 2 90 Mw Old Mulla 7 15 Mw New Mulla 3 30 Mw Khor Zubayr 1 50 Mw Generators Unscheduled Out of Service (19) 691 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 1
SP
Gas Pressure Low
8
Dibis 2
SP
Boiler Leak
8
* South Baghdad 5
SP
Boiler leak
30
South Baghdad 6
SP
Feed Water pump
30
* Mussaibe 4
SP
Drum Level low
200
Baiji 1
CP
Filter Cleaning
85
Baiji Mobile, 4
CP
No Fuel Filters
100
Khor Zubayr 4
CP
Flame loss
50
Mosil 1
CP
Rotor Defect
15
Mosil 2
CP
Load Gear Oil leak
15
* Mosil 8
CP
Reverse Power
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 9
CP
Load gear problems
15
Old Mulla 10
CP
Vibrations
15
New Mulla 4
CP
Load gear oil leak
30
Taji 3,
CP
Compressor
15
Taji 5
CP
Excitor problem
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (25) 1438 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
15 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
20 Apr
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 4
CP
M
ME
14 Apr 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla
CP
M
ME
17 Apr 04
TBD
15
Old Mulla 2
CP
M
ME
17 Apr 04
TBD
15
Old Mulla 8
CP
M
ME
17 Apr 04
TBD
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 6
CP
M
ME
2 Apr 04
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Loading
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
MoE completing PLC work
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 775 MW.
Power transferred from South to Middle 35 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1190
23523
980
1425
Duhok
80
1909
80
112
Naynawa
365
7707
321
522
Tamim
135
3204
134
194
Salah Aldeen
220
4737
197
261
Anbar
195
4194
175
234
Dyala
105
2050
85
143
Babil
100
2251
94
150
Kirbala
97
2011
84
104
Najaf
118
2477
103
103
Kadsya
79
1520
63
89
Wasit
100
1993
83
128
Muthana
65
1363
57
77
Nasirya
121
2657
111
126
Misan
65
1518
63
84
Basra
240
5388
225
265
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-bd613867
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 20, 2004
- Date
- 20 April 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: