# A-Steam Power Stations
Report Date - 12 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #2 boiler leakage; #3 prog maint Baiji Fuel Oil 6 3 85 90 100 275 500 #1 starting; #2 prog maint; #5 forced outage Daura Fuel Oil 4 0 180 #3 boiler leakage; #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 3 15 25 25 65 200 #1 & #2 prog maint; #5 stopped at 2155cwp; #6 synch at 1555 Mussaibe Crude and Fuel Oil 4 3 200 200 200 600 860 #4 prog maint Nassirya Crude 4 4 125 150 160 140 575 600 Najebia Natural Gas and Crude 2 2 80 90 170 160 Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1841 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 12 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 560 600 Quds 2 2 230 160 Gas Oil 30 trucks Musil Dam reg 4 4 37 60 1000 Mosil 12 10 150 150 16 #1 rotor defec; #3 synch at 1530; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 2 50 30 28 #4 rehab Haditha Dam 6 2 140 160 300 Old Mulla 12 7 92 128 450 #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab Samarra 3 2 42 55 420 New Mulla 6 3 90 173 2.9 #1 prog maint; #4 servo; #6 generator defect Himrin 2 2 35 21 130 Taji 7 5 67 55 16 #3 compressor; #7 needs rehab Hindia 4 4 4 5 115 M. Taji 2 1 7 18 16 #2 software Kufa 4 3 1 0 70 Daura 4 3 65 30 15 #3 needs rehab Total 929 896 Hilla 4 2 32 64 32 #3 synch at 1940; #4 synch at 1920 System Generation 85033 MWh Najaf 3 2 95 129 33 #2 prog maint Syrian Line Generation 1441 MWh Khor 4 3 128 80 Natural Gas #4 rehab Turkey Line Generation 2015 MWh Shuaiba 2 1 5 20 Natural Gas #2 s/b Total Generation 92540 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3908 MW Petro 4 0 Natural Gas Syria Peak Load 62 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 18 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4316 MW Diesel 57 Gas Oil Baghdad Load 1600 MW Total 1223 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 12 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 820 MW.
Power transferred from South to Middle 180 MW.
Baghdad 1600 34116 1424
Duhok 80 1929 80
Naynawa 385 9269 386
Tamim 151 3616 151
Salah Aldeen 195 4805 200
Anbar 190 4223 176
Dyala 92 2203 92
Babil 95 2439 102
Kirbala 100 2521 105
Najaf 105 2569 107
Kadsya 65 1531 64
Wasit 85 2356 98
Muthana 60 1375 57
Nasirya 120 2771 115
Misan 61 1461 61
Basra 335 7470 311
Home / Essential Services / ESS-b84f16e8
Essential Services
System Status Feb 12
- Date
- 12 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Report Date - 12 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #2 boiler leakage; #3 prog maint | ||||
| Baiji | Fuel Oil | 6 | 3 | 85 | 90 | 100 | 275 | 500 | #1 starting; #2 prog maint; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 0 | 180 | #3 boiler leakage; #4 prog maint; #5 & #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 3 | 15 | 25 | 25 | 65 | 200 | #1 & #2 prog maint; #5 stopped at 2155cwp; #6 synch at 1555 | |||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 200 | 200 | 200 | 600 | 860 | #4 prog maint | |||
| Nassirya | Crude | 4 | 4 | 125 | 150 | 160 | 140 | 575 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 80 | 90 | 170 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,841 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date - 12 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 560 | 600 | |
| Quds | 2 | 2 | 230 | 160 | Gas Oil | 30 trucks | Musil Dam reg | 4 | 4 | 37 | 60 | 1,000 |
| Mosil | 12 | 10 | 150 | 150 | 16 | #1 rotor defec; #3 synch at 1530; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 50 | 30 | 28 | #4 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 7 | 92 | 128 | 450 | #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab | Samarra | 3 | 2 | 42 | 55 | 420 |
| New Mulla | 6 | 3 | 90 | 173 | 2.90 | #1 prog maint; #4 servo; #6 generator defect | Himrin | 2 | 2 | 35 | 21 | 130 |
| Taji | 7 | 5 | 67 | 55 | 16 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 4 | 5 | 115 |
| M. Taji | 2 | 1 | 7 | 18 | 16 | #2 software | Kufa | 4 | 3 | 1 | 0 | 70 |
| Daura | 4 | 3 | 65 | 30 | 15 | #3 needs rehab | Total | 929 | 896 | |||
| Hilla | 4 | 2 | 32 | 64 | 32 | #3 synch at 1940; #4 synch at 1920 | System Generation | 85,033 | MWh | |||
| Najaf | 3 | 2 | 95 | 129 | 33 | #2 prog maint | Syrian Line Generation | 1,441 | MWh | |||
| Khor | 4 | 3 | 128 | 80 | Natural Gas | #4 rehab | Turkey Line Generation | 2,015 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #2 s/b | Total Generation | 92,540 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,908 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | Syria Peak Load | 62 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 18 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 4,316 | MW | |||||
| Diesel | 57 | Gas Oil | Baghdad Load | 1,600 | MW | |||||||
| Total | 1,223 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Report Date - 12 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 820 MW. | |||
| Power transferred from South to Middle 180 MW. | |||
| Baghdad | 1,600 | 34,116 | 1,424 |
| Duhok | 80 | 1,929 | 80 |
| Naynawa | 385 | 9,269 | 386 |
| Tamim | 151 | 3,616 | 151 |
| Salah Aldeen | 195 | 4,805 | 200 |
| Anbar | 190 | 4,223 | 176 |
| Dyala | 92 | 2,203 | 92 |
| Babil | 95 | 2,439 | 102 |
| Kirbala | 100 | 2,521 | 105 |
| Najaf | 105 | 2,569 | 107 |
| Kadsya | 65 | 1,531 | 64 |
| Wasit | 85 | 2,356 | 98 |
| Muthana | 60 | 1,375 | 57 |
| Nasirya | 120 | 2,771 | 115 |
| Misan | 61 | 1,461 | 61 |
| Basra | 335 | 7,470 | 311 |