REPORT DATE - 18 January 2004
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas418824#2 boiler leakage; #1 & #3 prog maint;
BaijiFuel Oil639095100285500#2 prog. maint; #5 forced outage; #6 prog maint
DauraFuel Oil418080180#4 rotor repair; #(5+6) Rehab
South BaghdadFuel Oil6320203070200#2 air heater defect; #1 boiler leakage; #5 prog maint
MussaibeCrude and Fuel Oil43210100225535860# 3starting
NassiryaCrude43130140150420600#4 prog maint. 28 DEC to 28 JAN.
NajebiaNatural Gas and Crude228030110160#5 only one boiler operating
HarthaNatural Gas and Crude41140140300#4 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,6482,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations REPORT DATE - 18 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 8 8 24 #2 boiler leakage; #1 & #3 prog maint; Baiji Fuel Oil 6 3 90 95 100 285 500 #2 prog. maint; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 80 80 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 3 20 20 30 70 200 #2 air heater defect; #1 boiler leakage; #5 prog maint Mussaibe Crude and Fuel Oil 4 3 210 100 225 535 860 # 3starting Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN. Najebia Natural Gas and Crude 2 2 80 30 110 160 #5 only one boiler operating Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1648 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date- 18 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 90 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 4 390 600 Quds 2 3 75 160 Gas Oil #1 Stopped to clean fuel sys. Musil Dam reg 4 3 35 60 450 Mosil 12 7 112 150 26 #1 rotor defect; #2 servo + ACC; #3 prog maint. #6 no diesel; #9 rotor defect; Musil Pumping 2 1 110 0 Dibis 3 1 30 30 30 #4 and #5 rehab Haditha Dam 6 2 120 160 250 Old Mulla 12 7 92 128 480 #1 ACC gear, #2 servo, #5 prog maint, #3 stopped; #12 rehab Samarra 3 2 32 55 320 New Mulla 6 3 94 173 2.9 #4 prog maint; #5 prog maint.#6 Generator defect Himrin 2 1 22 21 90 Taji 7 5 78 55 16 #3 Compressor; #4 stopped at 1330, #7 Rehab. Hindia 4 4 5 5 65 M. Taji 2 1 9 18 16 #2 software. Kufa 4 0 0 0 Daura 4 3 60 30 15 #3 Rehab Total 714 896 Hilla 4 4 62 64 21 System Generation 72657 MWh Najaf 3 2 95 129 19 #2 prog maint Syrian Line Generation 1436 MWh Khor 4 2 80 80 Natural Gas #3 prog maint; #4 Rehab Turkey Line Generation 1798 MWh Shuaiba 2 1 5 20 Natural Gas #2 stand by Total Generation 75891 MWh M. Shuaiba 2 0 0 Natural Gas System Peak Load 3270 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 13 0 Gas Oil Fixed Gen Peak Load 77 MW Hmam/Zafranya 7 0 0 Gas Oil Total Peak Load 3487 MW Diesel 20 Gas Oil Baghdad Load 1460 MW Total 934 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 18 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad Duhok Naynawa Tamim Salah Aldeen Anbar Dyala Babil Kirbala Najaf Kadsya Wasit Muthana Nasirya Misan Basra