System Status Jan 25

Date
25 January 2004
Category
Essential Services
Text available
English
Files
1
English original XLSDownload English text

Spreadsheet preview

Sheet “A-Steam Power Stations”: 16 rows × 13 columns

REPORT DATE - 25 January 2004
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas42881624#3 prog maint; #4 Boiler Leakage
BaijiFuel Oil629085175500#2 Prog. maint. #4 stopped at 0357 Boiler leakage #5 forced outage. #6 prog maint
DauraFuel Oil417575180#4 rotor repair; #(5+6) Rehab
South BaghdadFuel Oil62252550200#2 air heater defect; #3 stopped at 1625 boiler leakage; #5 prog maint; #6 boiler leakage
MussaibeCrude and Fuel Oil4220080150210640860#2 limited to C.W. prepairing; #3 boiler check
NassiryaCrude43130150170450600#4 prog maint. 28 DEC to 28 JAN.
NajebiaNatural Gas and Crude228085165160
HarthaNatural Gas and Crude419090300#1FDF; #4 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,6612,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations REPORT DATE - 25 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 8 8 16 24 #3 prog maint; #4 Boiler Leakage Baiji Fuel Oil 6 2 90 85 175 500 #2 Prog. maint. #4 stopped at 0357 Boiler leakage #5 forced outage. #6 prog maint Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 2 25 25 50 200 #2 air heater defect; #3 stopped at 1625 boiler leakage; #5 prog maint; #6 boiler leakage Mussaibe Crude and Fuel Oil 4 2 200 80 150 210 640 860 #2 limited to C.W. prepairing; #3 boiler check Nassirya Crude 4 3 130 150 170 450 600 #4 prog maint. 28 DEC to 28 JAN. Najebia Natural Gas and Crude 2 2 80 85 165 160 Hartha Natural Gas and Crude 4 1 90 90 300 #1FDF; #4 prog maint Out of Service for Unscheduled Maintanence Total: 1661 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date- 25 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 135 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 3 420 600 Quds 2 1 112 160 Gas Oil 41trucks; #2 C/B problem Musil Dam reg 4 4 44 60 750 Mosil 12 8 126 150 23 #1 rotor defect; #2 servo + ACC; #9 rotor defect; #11 stopped at 0021 11kv earth fault Musil Pumping 2 1 110 0 Dibis 3 1 30 30 30 #4 and #5 rehab Haditha Dam 6 2 140 160 250 Old Mulla 12 7 96 128 460 #1 ACC gear, #2 servo, #5 prog maint, #10 prog maint; #12 rehab Samarra 3 2 34 55 340 New Mulla 6 3 107 173 320 #4 prog maint; #6 Generator defect Himrin 2 1 23 21 330 Taji 7 4 68 55 19 #3 Compressor; #4 flame def; #7 Rehab. Hindia 4 4 5 5 M. Taji 2 1 7 18 #2 software. Kufa 4 0 0 0 Daura 4 3 75 30 17 #3 Rehab Total 776 896 Hilla 4 4 70 64 22 #1 synch at 1720 System Generation 80710 MWh Najaf 3 2 19 129 80 #2 prog maint Syrian Line Generation 1433 MWh Khor 4 3 125 80 Natural Gas #3 synch at 1510; #4 Rehab Turkey Line Generation 2021 MWh Shuaiba 2 1 6 20 Natural Gas #2 gas turbine check Total Generation 84146 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3780 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 12 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 18 0 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4047 MW Diesel 24 Gas Oil Baghdad Load 1494 MW Total 1042 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 25 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 700 MW. Power transferred from South to Middle 150 MW. Baghdad 1494 30689 1279 Duhok 80 1920 80 Naynawa 400 9114 380 Tamim 138 3500 146 Salah Aldeen 199 4668 195 Anbar 185 3904 163 Dyala 113 2109 88 Babil 95 2371 99 Kirbala 90 2088 87 Najaf 100 2615 109 Kadsya 60 1368 57 Wasit 85 1999 83 Muthana 52 1277 53 Nasirya 122 2670 111 Misan 60 1395 58 Basra 340 6929 289