DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 31, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 3881Mw, 81,868Mw hours, 7-day Avg. 3986Mw
Generators Returned to Service: 110 Mw Baiji 4, SP 80 Mw New Mulla 1 30 Mw Generators Unscheduled Out of Service (23) 814 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Baiji 2
SP
Hydrogen leak
120
Baiji 1
CP
Fuel Pressure Low
90
* Baiji 6
SP
High water consumption
85
Baiji 2
CP
Vibrations
110
* South Baghdad 4
SP
Boiler Leak
30
South Baghdad 5
SP
Boiler Leak
30
* Doura 4
CP
Gas pressure low
20
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
* Mosil 12
CP
Transformer problem
15
Dibis 6
CP
Converting to Diesel
30
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
Old Mulla 5
CP
High exhaust temperature
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 8
CP
Vibrations
15
Old Mulla 9,10
CP
Transformer damage
30
New Mulla 3
CP
Hydraulic Pressure
30
Taji 3,
CP
Compressor
15
Taji 1
CP
Vibrations
15
Taji 4
CP
Lubrication oil leak
15
M. Taji 2
CP
Software
15
Khor Zubayr 4
CP
Cooling System problem
50
RED – Denotes out of service since last report Generators Scheduled Out of Service (25) 1638 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 2
CP
M
ME
21 Feb 04
15 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 May
100
Doura 6
SP
R
Bechtel
Jul 03
30 Jun
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mosil 2
CP
M
GRD/RIE
21 Mar 04
15 May
15
Mosil 11
CP
M
ME
30 Mar 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
4 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service: None reported today
Distribution:
Power transferred from North to Middle 785 MW.
Power transferred from South to Middle 80 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1240
26758
1115
1438
Duhok
80
1907
79
104
Naynawa
330
7463
311
473
Tamim
130
2952
123
177
Salah Aldeen
230
4947
206
257
Anbar
220
4594
191
256
Dyala
86
2064
86
134
Babil
95
2372
99
136
Kirbala
86
2041
85
111
Najaf
100
2376
99
130
Kadsya
71
1391
58
84
Wasit
85
1981
83
130
Muthana
60
1313
55
78
Nasirya
130
2727
114
133
Misan
68
1414
59
80
Basra
275
6006
250
250
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3
Home / Essential Services / ESS-b4d195db
Essential Services