# A-Steam Power Stations
Report Date - 06 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 boiler leak; #3 prog maint; #4 boiler leak Baiji Fuel Oil 6 2 85 80 165 500 #1 synch at 0058; #2 prog maint; #4 synch at 1707 stopped at 306 FDF; #5 forced outage Daura Fuel Oil 4 1 65 65 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 3 25 30 30 85 200 #1 & #2 prog maint; #4 boiler leak Mussaibe Crude and Fuel Oil 4 2 200 210 410 860 #2 prog maint; #4 prog maint Nassirya Crude 4 4 130 115 140 125 510 600 Najebia Natural Gas and Crude 2 1 90 90 160 #4 valve leak Hartha Natural Gas and Crude 4 2 60 120 180 300 #1 high furnace press Out of Service for Unscheduled Maintanence Total: 1513 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 06 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 90 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 Quds 2 2 80 160 Gas Oil 25 trucks Musil Dam reg 4 3 26 60 1000 Mosil 12 9 140 150 28 #1 & #9 rotor defect; #12 generator fault Musil Pumping 2 1 110 0 Dibis 3 2 90 30 32 #4 rehab; #5 synch at 1607 Haditha Dam 6 4 160 160 450 Old Mulla 12 5 75 128 540 #1 acc gear; #2 servo; #5 prog maint; #12 needs rehab Samarra 3 3 55 55 New Mulla 6 4 120 173 3.4 #2 prog maint; #6 generator defect Himrin 2 2 50 21 Taji 7 55 #3 compressor; #4 stopped at 600 control card Hindia 4 4 6 5 M. Taji 2 18 #2 software Kufa 4 2 2 0 Daura 4 30 #2 prog maint; #3 needs rehab Total 979 896 Hilla 4 2 25 64 37 #1 cooling sys prob; #2 servo System Generation 74267 MWh Najaf 3 2 80 129 35 #2 stopped at 1705 vib Syrian Line Generation 1350 MWh Khor 4 3 110 80 Natural Gas #2 prog maint Turkey Line Generation 1797 MWh Shuaiba 2 1 6 20 Natural Gas #1 prog maint Total Generation 82841 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3448 MW Petro 4 0 Natural Gas #2 vib Syria Peak Load 53 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 15 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 3847 MW Diesel 40 Gas Oil Baghdad Load 1400 MW Total 882 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 06 MARCH 2004 Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 250 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1400 27414 1142 Duhok 80 1866 78 Naynawa 280 8252 344 Tamim 124 3260 136 Salah Aldeen 200 4912 205 Anbar 190 4429 185 Dyala 75 2043 85 Babil 100 2205 92 Kirbala 115 2238 93 Najaf 132 2548 106 Kadsya 65 1387 58 Wasit 90 2081 87 Muthana 50 1350 56 Nasirya 120 2720 116 Misan 65 1436 60 Basra 275 6350 265
Home / Essential Services / ESS-a5cdb954
Essential Services
System Status Mar 06
- Date
- 6 March 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Report Date - 06 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #2 boiler leak; #3 prog maint; #4 boiler leak | |||||
| Baiji | Fuel Oil | 6 | 2 | 85 | 80 | 165 | 500 | #1 synch at 0058; #2 prog maint; #4 synch at 1707 stopped at 306 FDF; #5 forced outage | ||||
| Daura | Fuel Oil | 4 | 1 | 65 | 65 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 3 | 25 | 30 | 30 | 85 | 200 | #1 & #2 prog maint; #4 boiler leak | |||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 210 | 410 | 860 | #2 prog maint; #4 prog maint | ||||
| Nassirya | Crude | 4 | 4 | 130 | 115 | 140 | 125 | 510 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 1 | 90 | 90 | 160 | #4 valve leak | |||||
| Hartha | Natural Gas and Crude | 4 | 2 | 60 | 120 | 180 | 300 | #1 high furnace press | ||||
| Out of Service for Unscheduled Maintanence | Total: | 1,513 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date - 06 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 90 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 570 | 600 | |
| Quds | 2 | 2 | 80 | 160 | Gas Oil | 25 trucks | Musil Dam reg | 4 | 3 | 26 | 60 | 1,000 |
| Mosil | 12 | 9 | 140 | 150 | 28 | #1 & #9 rotor defect; #12 generator fault | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 90 | 30 | 32 | #4 rehab; #5 synch at 1607 | Haditha Dam | 6 | 4 | 160 | 160 | 450 |
| Old Mulla | 12 | 5 | 75 | 128 | 540 | #1 acc gear; #2 servo; #5 prog maint; #12 needs rehab | Samarra | 3 | 3 | 55 | 55 | |
| New Mulla | 6 | 4 | 120 | 173 | 3.40 | #2 prog maint; #6 generator defect | Himrin | 2 | 2 | 50 | 21 | |
| Taji | 7 | 55 | #3 compressor; #4 stopped at 600 control card | Hindia | 4 | 4 | 6 | 5 | ||||
| M. Taji | 2 | 18 | #2 software | Kufa | 4 | 2 | 2 | 0 | ||||
| Daura | 4 | 30 | #2 prog maint; #3 needs rehab | Total | 979 | 896 | ||||||
| Hilla | 4 | 2 | 25 | 64 | 37 | #1 cooling sys prob; #2 servo | System Generation | 74,267 | MWh | |||
| Najaf | 3 | 2 | 80 | 129 | 35 | #2 stopped at 1705 vib | Syrian Line Generation | 1,350 | MWh | |||
| Khor | 4 | 3 | 110 | 80 | Natural Gas | #2 prog maint | Turkey Line Generation | 1,797 | MWh | |||
| Shuaiba | 2 | 1 | 6 | 20 | Natural Gas | #1 prog maint | Total Generation | 82,841 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,448 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | #2 vib | Syria Peak Load | 53 | MW | |||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 15 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Total Peak Load | 3,847 | MW | |||||
| Diesel | 40 | Gas Oil | Baghdad Load | 1,400 | MW | |||||||
| Total | 882 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Report Date - 06 MARCH 2004 | |||
|---|---|---|---|
| Power transferred from North to Middle 850 MW. | |||
| Power transferred from South to Middle 250 MW. | |||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,400 | 27,414 | 1,142 |
| Duhok | 80 | 1,866 | 78 |
| Naynawa | 280 | 8,252 | 344 |
| Tamim | 124 | 3,260 | 136 |
| Salah Aldeen | 200 | 4,912 | 205 |
| Anbar | 190 | 4,429 | 185 |
| Dyala | 75 | 2,043 | 85 |
| Babil | 100 | 2,205 | 92 |
| Kirbala | 115 | 2,238 | 93 |
| Najaf | 132 | 2,548 | 106 |
| Kadsya | 65 | 1,387 | 58 |
| Wasit | 90 | 2,081 | 87 |
| Muthana | 50 | 1,350 | 56 |
| Nasirya | 120 | 2,720 | 116 |
| Misan | 65 | 1,436 | 60 |
| Basra | 275 | 6,350 | 265 |