# A-Steam Power Stations
Reporting Peak for 12 MAY 2004 / Report Date - 13 MAY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #1 synch at 1401; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 3 125 85 85 295 500 #1 prog maint; #3 GRF Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 2 25 30 55 200 #1, #2, #3 prog maint; #5 A/H Mussaibe Crude and Fuel Oil 4 3 210 205 210 625 860 #2 prog maint Nassirya Crude 4 3 165 155 125 445 600 #1 prog maint Najebia Natural Gas and Crude 2 1 80 80 160 #5 thrust bearing prob Hartha Natural Gas and Crude 4 1 180 180 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1696 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 12 MAY 2004 / Report Date - 13 MAY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 83 125 GO+1+FO #2 c. ch. maint Musil Dam Main 4 3 490 600 M. Baiji 8 3 60 Gas Oil Musil Dam reg 4 2 25 60 300 Quds 2 2 165 160 CO & GO 14 trucks Musil Pumping 2 0 Mosil 12 7 115 150 27 #1, #2 TF; #7 prog maint; #8 TF Haditha Dam 6 4 260 160 Dibis 3 2 44 30 28 #4 TF Samarra 3 3 46 55 500 Old Mulla 12 7 100 128 480 #1, #2 TF; #4 load unbalance; #8 prog maint; #12 TF Himrin 2 2 36 21 450 New Mulla 6 5 140 173 3.1 #6 TF Hindia 4 4 5 5 135 Taji 7 55 #1, #2 NGPL; #3, #4 TF; #5 NGPL; #6 prog maint; #7 TF Kufa 4 0 M. Taji 2 18 Gas Oil #1, #2 TF Total 862 896 Daura 4 30 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 74673 MWh Hilla 4 4 68 64 21 #5 running during peak load Syrian Line Generation 1392 MWh Najaf 3 3 80 129 20 Turkey Line Generation 1856 MWh Khor 4 3 135 80 Natural Gas #2 prog maint Total Generation 83348 MWh Shuaiba 2 2 5 20 Natural Gas System Peak Load 3665 MW M. Shuaiba 2 Natural Gas split with the refinery Syria Peak Load 60 MW Petro 4 1 10 0 Natural Gas #2 synch at 1250 Turkey Peak Load 80 MW M. Dibis 4 2 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 2 12 0 Gas Oil Total Peak Load 4071 MW Hmam/Zafranya 7 1 2 Gas Oil Baghdad Load 1345 MW Diesel 79 Gas Oil Total 1107 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 12 MAY 2004 / Report Date - 13 MAY 2004 Power transferred from North to Middle 790 MW.
Power transferred from South to Middle 220 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1345 27196 1133 1579 Duhok 80 1838 77 112 Naynawa 340 6500 271 519 Tamim 140 2975 124 190 Salah Aldeen 220 4584 191 257 Anbar 200 4348 181 236 Dyala 85 1554 65 130 Babil 110 1997 83 139 Kirbala 85 1351 56 106 Najaf 95 1993 83 130 Kadsya 65 1224 51 91 Wasit 95 1620 68 121 Muthana 45 1205 50 73 Nasirya 110 2694 112 131 Misan 45 1367 57 81 Basra 330 7152 298 342
Home / Essential Services / ESS-a1ea1c86
Essential Services
System Status May 13
- Date
- 13 May 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 12 MAY 2004 / Report Date - 13 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #1 synch at 1401; #3 gen earth fault; #4 prog maint | ||||
| Baiji | Fuel Oil | 6 | 3 | 125 | 85 | 85 | 295 | 500 | #1 prog maint; #3 GRF | |||
| Daura | Fuel Oil | 4 | 0 | 180 | #3, #4 prog maint; #5, #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 2 | 25 | 30 | 55 | 200 | #1, #2, #3 prog maint; #5 A/H | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 210 | 205 | 210 | 625 | 860 | #2 prog maint | |||
| Nassirya | Crude | 4 | 3 | 165 | 155 | 125 | 445 | 600 | #1 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 1 | 80 | 80 | 160 | #5 thrust bearing prob | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 180 | 180 | 300 | #1 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,696 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 27 rows × 13 columns
| Reporting Peak for 12 MAY 2004 / Report Date - 13 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 83 | 125 | GO+1+FO | #2 c. ch. maint | Musil Dam Main | 4 | 3 | 490 | 600 | |
| M. Baiji | 8 | 3 | 60 | Gas Oil | Musil Dam reg | 4 | 2 | 25 | 60 | 300 | ||
| Quds | 2 | 2 | 165 | 160 | CO & GO | 14 trucks | Musil Pumping | 2 | 0 | |||
| Mosil | 12 | 7 | 115 | 150 | 27 | #1, #2 TF; #7 prog maint; #8 TF | Haditha Dam | 6 | 4 | 260 | 160 | |
| Dibis | 3 | 2 | 44 | 30 | 28 | #4 TF | Samarra | 3 | 3 | 46 | 55 | 500 |
| Old Mulla | 12 | 7 | 100 | 128 | 480 | #1, #2 TF; #4 load unbalance; #8 prog maint; #12 TF | Himrin | 2 | 2 | 36 | 21 | 450 |
| New Mulla | 6 | 5 | 140 | 173 | 3.10 | #6 TF | Hindia | 4 | 4 | 5 | 5 | 135 |
| Taji | 7 | 55 | #1, #2 NGPL; #3, #4 TF; #5 NGPL; #6 prog maint; #7 TF | Kufa | 4 | 0 | ||||||
| M. Taji | 2 | 18 | Gas Oil | #1, #2 TF | Total | 862 | 896 | |||||
| Daura | 4 | 30 | #1, #2 NGPL; #3 needs rehab; #4 prog maint | System Generation | 74,673 | MWh | ||||||
| Hilla | 4 | 4 | 68 | 64 | 21 | #5 running during peak load | Syrian Line Generation | 1,392 | MWh | |||
| Najaf | 3 | 3 | 80 | 129 | 20 | Turkey Line Generation | 1,856 | MWh | ||||
| Khor | 4 | 3 | 135 | 80 | Natural Gas | #2 prog maint | Total Generation | 83,348 | MWh | |||
| Shuaiba | 2 | 2 | 5 | 20 | Natural Gas | System Peak Load | 3,665 | MW | ||||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | Syria Peak Load | 60 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | #2 synch at 1250 | Turkey Peak Load | 80 | MW | |||
| M. Dibis | 4 | 2 | 9 | 24 | Natural Gas | Fixed Gen Peak Load | 266 | MW | ||||
| Mossil East | 5 | 2 | 12 | 0 | Gas Oil | Total Peak Load | 4,071 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Baghdad Load | 1,345 | MW | |||||
| Diesel | 79 | Gas Oil | ||||||||||
| Total | 1,107 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 5 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 12 MAY 2004 / Report Date - 13 MAY 2004 | ||||
|---|---|---|---|---|
| Power transferred from North to Middle 790 MW. | ||||
| Power transferred from South to Middle 220 MW. | ||||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | Demand Load MW |
| Baghdad | 1,345 | 27,196 | 1,133 | 1,579 |
| Duhok | 80 | 1,838 | 77 | 112 |
| Naynawa | 340 | 6,500 | 271 | 519 |
| Tamim | 140 | 2,975 | 124 | 190 |
| Salah Aldeen | 220 | 4,584 | 191 | 257 |
| Anbar | 200 | 4,348 | 181 | 236 |
| Dyala | 85 | 1,554 | 65 | 130 |
| Babil | 110 | 1,997 | 83 | 139 |
| Kirbala | 85 | 1,351 | 56 | 106 |
| Najaf | 95 | 1,993 | 83 | 130 |
| Kadsya | 65 | 1,224 | 51 | 91 |
| Wasit | 95 | 1,620 | 68 | 121 |
| Muthana | 45 | 1,205 | 50 | 73 |
| Nasirya | 110 | 2,694 | 112 | 131 |
| Misan | 45 | 1,367 | 57 | 81 |
| Basra | 330 | 7,152 | 298 | 342 |
Highlighting search results for: