# A-Steam Power Stations
Reporting Peak for 28 APRIL 2004 / Report Date - 29 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 0 24 #1, #2 stop work on network; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 2 90 105 195 500 #1 prog maint; #2 48 hrs main on turbine and repair boiler leak; #3 prog maint Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 3 30 30 30 90 200 #1, #2, #3 prog maint Mussaibe Crude and Fuel Oil 4 3 210 220 235 665 860 #2 prog maint Nassirya Crude 4 3 180 160 130 470 600 #1 prog maint Najebia Natural Gas and Crude 2 2 75 80 155 160 #4 boiler; #5 in opeation at 1510 Hartha Natural Gas and Crude 4 1 175 175 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1750 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 28 APRIL 2004 / Report Date - 29 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 180 125 CO +GO Musil Dam Main 4 4 600 600 M. Baiji 8 3 60 Gas Oil Musil Dam reg 4 2 21 60 300 Quds 2 2 117 160 CO Musil Pumping 2 0 Mosil 12 8 125 150 26 #1, #2 TF; #7 prog maint; #9 TF Haditha Dam 6 4 220 160 400 Dibis 3 2 45 30 31 #4 TF; #5 synch at 1135 Samarra 3 3 50 55 590 Old Mulla 12 7 100 128 470 #1, #2 TF; #7 HET; #8 prog maint Himrin 2 2 36 21 135 New Mulla 6 5 151 173 28 #6 TF Hindia 4 4 5 5 120 Taji 7 55 #1, #2 NGPL; #3 TF; #4 NGPL; #5 HET; #6 prog maint; #7 TF Kufa 4 2 1 0 60 M. Taji 2 18 Gas Oil #2 software Total 933 896 Daura 4 30 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 77251 MWh Hilla 4 4 60 64 20 Syrian Line Generation 1350 MWh Najaf 3 3 65 129 19 Turkey Line Generation 1930 MWh Khor 4 3 140 80 Natural Gas #2 prog maint Total Generation 82678 MWh Shuaiba 2 2 10 20 Natural Gas #2 synch at 1041 System Peak Load 3876 MW M. Shuaiba 2 1 4 Natural Gas Syria Peak Load 60 MW Petro 4 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 15 0 Gas Oil Total Peak Load 4282 MW Hmam/Zafranya 7 1 2 Gas Oil Baghdad Load 1500 MW Diesel 54 Gas Oil Total 1137 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 28 APRIL 2004 / Report Date - 29 APRIL 2004 Power transferred from North to Middle 940 MW.
Power transferred from South to Middle 230 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1500 29363 1223 1409 Duhok 80 1937 81 107 Naynawa 350 7709 321 491 Tamim 145 3091 129 179 Salah Aldeen 224 4868 203 248 Anbar 225 4433 185 227 Dyala 110 2292 96 133 Babil 125 2545 106 136 Kirbala 95 2078 87 107 Najaf 120 2440 102 126 Kadsya 65 2110 88 117 Wasit 100 2451 60 82 Muthana 70 1425 59 74 Nasirya 125 2636 110 124 Misan 70 1483 62 76 Basra 300 6979 291 296
Home / Essential Services / ESS-9c9003f2
Essential Services
System Status Apr 29
- Date
- 29 April 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 28 APRIL 2004 / Report Date - 29 APRIL 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 0 | 24 | #1, #2 stop work on network; #3 gen earth fault; #4 prog maint | |||||||
| Baiji | Fuel Oil | 6 | 2 | 90 | 105 | 195 | 500 | #1 prog maint; #2 48 hrs main on turbine and repair boiler leak; #3 prog maint | ||||
| Daura | Fuel Oil | 4 | 0 | 180 | #3, #4 prog maint; #5, #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 3 | 30 | 30 | 30 | 90 | 200 | #1, #2, #3 prog maint | |||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 210 | 220 | 235 | 665 | 860 | #2 prog maint | |||
| Nassirya | Crude | 4 | 3 | 180 | 160 | 130 | 470 | 600 | #1 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 75 | 80 | 155 | 160 | #4 boiler; #5 in opeation at 1510 | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 175 | 175 | 300 | #1 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,750 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 27 rows × 13 columns
| Reporting Peak for 28 APRIL 2004 / Report Date - 29 APRIL 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 2 | 180 | 125 | CO +GO | Musil Dam Main | 4 | 4 | 600 | 600 | ||
| M. Baiji | 8 | 3 | 60 | Gas Oil | Musil Dam reg | 4 | 2 | 21 | 60 | 300 | ||
| Quds | 2 | 2 | 117 | 160 | CO | Musil Pumping | 2 | 0 | ||||
| Mosil | 12 | 8 | 125 | 150 | 26 | #1, #2 TF; #7 prog maint; #9 TF | Haditha Dam | 6 | 4 | 220 | 160 | 400 |
| Dibis | 3 | 2 | 45 | 30 | 31 | #4 TF; #5 synch at 1135 | Samarra | 3 | 3 | 50 | 55 | 590 |
| Old Mulla | 12 | 7 | 100 | 128 | 470 | #1, #2 TF; #7 HET; #8 prog maint | Himrin | 2 | 2 | 36 | 21 | 135 |
| New Mulla | 6 | 5 | 151 | 173 | 28 | #6 TF | Hindia | 4 | 4 | 5 | 5 | 120 |
| Taji | 7 | 55 | #1, #2 NGPL; #3 TF; #4 NGPL; #5 HET; #6 prog maint; #7 TF | Kufa | 4 | 2 | 1 | 0 | 60 | |||
| M. Taji | 2 | 18 | Gas Oil | #2 software | Total | 933 | 896 | |||||
| Daura | 4 | 30 | #1, #2 NGPL; #3 needs rehab; #4 prog maint | System Generation | 77,251 | MWh | ||||||
| Hilla | 4 | 4 | 60 | 64 | 20 | Syrian Line Generation | 1,350 | MWh | ||||
| Najaf | 3 | 3 | 65 | 129 | 19 | Turkey Line Generation | 1,930 | MWh | ||||
| Khor | 4 | 3 | 140 | 80 | Natural Gas | #2 prog maint | Total Generation | 82,678 | MWh | |||
| Shuaiba | 2 | 2 | 10 | 20 | Natural Gas | #2 synch at 1041 | System Peak Load | 3,876 | MW | |||
| M. Shuaiba | 2 | 1 | 4 | Natural Gas | Syria Peak Load | 60 | MW | |||||
| Petro | 4 | 0 | Natural Gas | Turkey Peak Load | 80 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Fixed Gen Peak Load | 266 | MW | ||||
| Mossil East | 5 | 3 | 15 | 0 | Gas Oil | Total Peak Load | 4,282 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Baghdad Load | 1,500 | MW | |||||
| Diesel | 54 | Gas Oil | ||||||||||
| Total | 1,137 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 5 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 28 APRIL 2004 / Report Date - 29 APRIL 2004 | ||||
|---|---|---|---|---|
| Power transferred from North to Middle 940 MW. | ||||
| Power transferred from South to Middle 230 MW. | ||||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | Demand Load MW |
| Baghdad | 1,500 | 29,363 | 1,223 | 1,409 |
| Duhok | 80 | 1,937 | 81 | 107 |
| Naynawa | 350 | 7,709 | 321 | 491 |
| Tamim | 145 | 3,091 | 129 | 179 |
| Salah Aldeen | 224 | 4,868 | 203 | 248 |
| Anbar | 225 | 4,433 | 185 | 227 |
| Dyala | 110 | 2,292 | 96 | 133 |
| Babil | 125 | 2,545 | 106 | 136 |
| Kirbala | 95 | 2,078 | 87 | 107 |
| Najaf | 120 | 2,440 | 102 | 126 |
| Kadsya | 65 | 2,110 | 88 | 117 |
| Wasit | 100 | 2,451 | 60 | 82 |
| Muthana | 70 | 1,425 | 59 | 74 |
| Nasirya | 125 | 2,636 | 110 | 124 |
| Misan | 70 | 1,483 | 62 | 76 |
| Basra | 300 | 6,979 | 291 | 296 |
Highlighting search results for: