# A-Steam Power Stations
REPORT DATE - 07 FEBRUARY 2004
A - Steam Power Stations
Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #2 boiler leakage; #3 prog maint Baiji Fuel Oil 6 3 90 80 85 255 500 #2 prog maint; #5 forced outage; #6 starting Daura Fuel Oil 4 1 65 65 180 #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 2 20 30 50 200 #1 H.O. leakage; #2 air heater defect; #5 starting; #6 boiler leakage Mussaibe Crude and Fuel Oil 4 3 115 105 160 380 860 #4 LPT blade defect Nassirya Crude 4 4 130 70 160 160 520 600 Najebia Natural Gas and Crude 2 2 35 70 105 160 #4 one boiler in operation Hartha Natural Gas and Crude 4 1 95 95 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1486 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 07 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 Quds 2 1 110 160 Gas Oil #2 F.P.L. - 36 trucks Musil Dam reg 4 4 35 60 1000 Mosil 12 9 130 150 17 #1 rotor defect; #3 bleed valve; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 28 30 32 #4 & #5 rehab Haditha Dam 6 2 120 160 250 Old Mulla 12 7 105 128 510 #1 acc. gear; #2 servo; #5 prog main; #10 prog main; #12 needs rehab Samarra 3 2 41 55 New Mulla 6 3 105 173 3.3 #1 prog main; #4 servo; #6 generator defect Himrin 2 2 35 21 Taji 7 3 42 55 17 #3 compressor; #7 needs rehab Hindia 4 4 5 5 M. Taji 2 18 #2 software Kufa 4 4 1 0 Daura 4 2 50 30 16.5 #3 needs rehab Total 917 896 Hilla 4 3 50 64 29 #2 servo System Generation 74476 MWh Najaf 3 2 100 129 28 #2 prog maint Syrian Line Generation 1443 MWh Khor 4 3 130 80 Natural Gas #4 rehab Turkey Line Generation 2010 MWh Shuaiba 2 1 6 20 Natural Gas #2 s/b Total Generation 83356 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3339 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 54 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 17 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 1 Gas Oil Total Peak Load 3739 MW Diesel 24 Gas Oil Baghdad Load 1200 MW Total 1037 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 07 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 200 MW.
Baghdad 1200 23239 968
Duhok 80 1939 81
Naynawa 270 7690 320
Tamim 115 3401 142
Salah Aldeen 190 4590 191
Anbar 190 3955 165
Dyala 95 1828 76
Babil 85 2406 100
Kirbala 95 2540 106
Najaf 95 2443 102
Kadsya 50 1169 49
Wasit 75 2023 84
Muthana 50 1134 47
Nasirya 110 2738 114
Misan 60 1370 57
Basra 310 7642 318
Home / Essential Services / ESS-9c75381a
Essential Services
System Status Feb 07
- Date
- 7 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| REPORT DATE - 07 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #2 boiler leakage; #3 prog maint | ||||
| Baiji | Fuel Oil | 6 | 3 | 90 | 80 | 85 | 255 | 500 | #2 prog maint; #5 forced outage; #6 starting | |||
| Daura | Fuel Oil | 4 | 1 | 65 | 65 | 180 | #4 rotor repair; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 2 | 20 | 30 | 50 | 200 | #1 H.O. leakage; #2 air heater defect; #5 starting; #6 boiler leakage | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 115 | 105 | 160 | 380 | 860 | #4 LPT blade defect | |||
| Nassirya | Crude | 4 | 4 | 130 | 70 | 160 | 160 | 520 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 35 | 70 | 105 | 160 | #4 one boiler in operation | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 95 | 95 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,486 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date - 07 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 570 | 600 | |
| Quds | 2 | 1 | 110 | 160 | Gas Oil | #2 F.P.L. - 36 trucks | Musil Dam reg | 4 | 4 | 35 | 60 | 1,000 |
| Mosil | 12 | 9 | 130 | 150 | 17 | #1 rotor defect; #3 bleed valve; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 28 | 30 | 32 | #4 & #5 rehab | Haditha Dam | 6 | 2 | 120 | 160 | 250 |
| Old Mulla | 12 | 7 | 105 | 128 | 510 | #1 acc. gear; #2 servo; #5 prog main; #10 prog main; #12 needs rehab | Samarra | 3 | 2 | 41 | 55 | |
| New Mulla | 6 | 3 | 105 | 173 | 3.30 | #1 prog main; #4 servo; #6 generator defect | Himrin | 2 | 2 | 35 | 21 | |
| Taji | 7 | 3 | 42 | 55 | 17 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | |
| M. Taji | 2 | 18 | #2 software | Kufa | 4 | 4 | 1 | 0 | ||||
| Daura | 4 | 2 | 50 | 30 | 16.50 | #3 needs rehab | Total | 917 | 896 | |||
| Hilla | 4 | 3 | 50 | 64 | 29 | #2 servo | System Generation | 74,476 | MWh | |||
| Najaf | 3 | 2 | 100 | 129 | 28 | #2 prog maint | Syrian Line Generation | 1,443 | MWh | |||
| Khor | 4 | 3 | 130 | 80 | Natural Gas | #4 rehab | Turkey Line Generation | 2,010 | MWh | |||
| Shuaiba | 2 | 1 | 6 | 20 | Natural Gas | #2 s/b | Total Generation | 83,356 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,339 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 54 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 17 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 1 | Gas Oil | Total Peak Load | 3,739 | MW | |||||
| Diesel | 24 | Gas Oil | Baghdad Load | 1,200 | MW | |||||||
| Total | 1,037 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Report Date - 07 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 750 MW. | |||
| Power transferred from South to Middle 200 MW. | |||
| Baghdad | 1,200 | 23,239 | 968 |
| Duhok | 80 | 1,939 | 81 |
| Naynawa | 270 | 7,690 | 320 |
| Tamim | 115 | 3,401 | 142 |
| Salah Aldeen | 190 | 4,590 | 191 |
| Anbar | 190 | 3,955 | 165 |
| Dyala | 95 | 1,828 | 76 |
| Babil | 85 | 2,406 | 100 |
| Kirbala | 95 | 2,540 | 106 |
| Najaf | 95 | 2,443 | 102 |
| Kadsya | 50 | 1,169 | 49 |
| Wasit | 75 | 2,023 | 84 |
| Muthana | 50 | 1,134 | 47 |
| Nasirya | 110 | 2,738 | 114 |
| Misan | 60 | 1,370 | 57 |
| Basra | 310 | 7,642 | 318 |
Highlighting search results for: