# A-Steam Power Stations
REPORT DATE - 14 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 8 8 16 24 #1 prog maint; #3 prog maint; #4 Live steam pipe leakage Baiji Fuel Oil 6 2 90 90 180 500 #2 prog. maint; #3 thrust bearing defect; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 80 80 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 3 35 20 30 85 200 #2 air heater defect; #4 stopped at 2200 boiler leakage; #5 prog maint Mussaibe Crude and Fuel Oil 4 3 220 100 220 540 860 #3 hydraulic test Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 2 30 30 60 160 #4 one boiler in operation; #5 one boiler in operation Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1521 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 14 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 135 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 3 390 600 Quds 2 2 220 160 Gas Oil 36 trucks Musil Dam reg 4 3 38 60 450 Mosil 12 7 90 150 17 #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 27 30 21 #4 and #5 rehab Haditha Dam 6 2 140 160 350 Old Mulla 12 7 85 128 340 #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab Samarra 3 2 33 55 330 New Mulla 6 3 90 173 250 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 22 21 90 Taji 7 4 50 55 13 #3 Compressor; #4 turbine; #7 Rehab Hindia 4 3 5 5 M. Taji 2 1 7 18 #2 software. Kufa 4 0 0 0 Daura 4 1 20 30 14 #2 stopped at 2225 gen-diff; #3 Rehab Total 738 896 Hilla 4 64 gaspipe leakage System Generation 67706 MWh Najaf 3 1 20 129 #2 prog maint; #3 working on gas oil - gaspipe leakage Syrian Line Generation 1428 MWh Khor 4 3 120 80 Natural Gas synco - after shut down; #2 S/B Turkey Line Generation 1943 MWh Shuaiba 2 1 8 20 Natural Gas Total Generation 71077 MWh M. Shuaiba 2 Natural Gas shut down at 2240 due to heavy rain System Peak Load 3306 MW Petro 4 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 14 0 Gas Oil Fixed Gen Peak Load 77 MW Hmam/Zafranya 7 1 1 Gas Oil Total Peak Load 5561 MW Diesel 17 Gas Oil Baghdad Load 1250 MW Total 904 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 14 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 550 MW.
Power transferred from South to Middle 60 MW.
Baghdad 1350 27735 1156
Duhok 82 1862 78
Naynawa 421 9629 401
Tamim 141 3547 148
Salah Aldeen 200 4407 184
Anbar 185 4101 171
Dyala 81 1918 80
Babil 100 2266 94
Kirbala 95 2203 92
Najaf 100 2530 105
Kadsya 55 1416 59
Wasit 85 1895 79
Muthana 55 1347 56
Nasirya 115 2574 107
Misan 65 1411 59
Basra 350 7740 323
Home / Essential Services / ESS-9b838804
Essential Services
System Status Jan 14
- Date
- 14 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| REPORT DATE - 14 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #1 prog maint; #3 prog maint; #4 Live steam pipe leakage | ||||
| Baiji | Fuel Oil | 6 | 2 | 90 | 90 | 180 | 500 | #2 prog. maint; #3 thrust bearing defect; #5 forced outage; #6 prog maint | ||||
| Daura | Fuel Oil | 4 | 1 | 80 | 80 | 180 | #4 rotor repair; #(5+6) Rehab | |||||
| South Baghdad | Fuel Oil | 6 | 3 | 35 | 20 | 30 | 85 | 200 | #2 air heater defect; #4 stopped at 2200 boiler leakage; #5 prog maint | |||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 220 | 100 | 220 | 540 | 860 | #3 hydraulic test | |||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 150 | 420 | 600 | #4 prog maint. 28 DEC to 28 JAN. | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 30 | 30 | 60 | 160 | #4 one boiler in operation; #5 one boiler in operation | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,521 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date- 14 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 135 | 125 | Gas Oil | #2 lubricating oil leak from bearing | Musil Dam Main | 4 | 3 | 390 | 600 | |
| Quds | 2 | 2 | 220 | 160 | Gas Oil | 36 trucks | Musil Dam reg | 4 | 3 | 38 | 60 | 450 |
| Mosil | 12 | 7 | 90 | 150 | 17 | #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 27 | 30 | 21 | #4 and #5 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 350 |
| Old Mulla | 12 | 7 | 85 | 128 | 340 | #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab | Samarra | 3 | 2 | 33 | 55 | 330 |
| New Mulla | 6 | 3 | 90 | 173 | 250 | #4 & #5 prog maint; #6 Generator defect | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 4 | 50 | 55 | 13 | #3 Compressor; #4 turbine; #7 Rehab | Hindia | 4 | 3 | 5 | 5 | |
| M. Taji | 2 | 1 | 7 | 18 | #2 software. | Kufa | 4 | 0 | 0 | 0 | ||
| Daura | 4 | 1 | 20 | 30 | 14 | #2 stopped at 2225 gen-diff; #3 Rehab | Total | 738 | 896 | |||
| Hilla | 4 | 64 | gaspipe leakage | System Generation | 67,706 | MWh | ||||||
| Najaf | 3 | 1 | 20 | 129 | #2 prog maint; #3 working on gas oil - gaspipe leakage | Syrian Line Generation | 1,428 | MWh | ||||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | synco - after shut down; #2 S/B | Turkey Line Generation | 1,943 | MWh | |||
| Shuaiba | 2 | 1 | 8 | 20 | Natural Gas | Total Generation | 71,077 | MWh | ||||
| M. Shuaiba | 2 | Natural Gas | shut down at 2240 due to heavy rain | System Peak Load | 3,306 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||||
| M. Dibis | 4 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||||
| Mossil East | 5 | 2 | 14 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 1 | Gas Oil | Total Peak Load | 5,561 | MW | |||||
| Diesel | 17 | Gas Oil | Baghdad Load | 1,250 | MW | |||||||
| Total | 904 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Report Date - 14 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 550 MW. | |||
| Power transferred from South to Middle 60 MW. | |||
| Baghdad | 1,350 | 27,735 | 1,156 |
| Duhok | 82 | 1,862 | 78 |
| Naynawa | 421 | 9,629 | 401 |
| Tamim | 141 | 3,547 | 148 |
| Salah Aldeen | 200 | 4,407 | 184 |
| Anbar | 185 | 4,101 | 171 |
| Dyala | 81 | 1,918 | 80 |
| Babil | 100 | 2,266 | 94 |
| Kirbala | 95 | 2,203 | 92 |
| Najaf | 100 | 2,530 | 105 |
| Kadsya | 55 | 1,416 | 59 |
| Wasit | 85 | 1,895 | 79 |
| Muthana | 55 | 1,347 | 56 |
| Nasirya | 115 | 2,574 | 107 |
| Misan | 65 | 1,411 | 59 |
| Basra | 350 | 7,740 | 323 |
Highlighting search results for: