Report Date - 25 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #3 prog maint; #4 synch at 1040, stopped at 647 boiler leakage Baiji Fuel Oil 6 4 90 95 85 100 370 500 #2 prog maint; #5 forced outage Daura Fuel Oil 4 1 75 75 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 1 20 20 200 #1 & #2 prog maint; #4 & #5 boiler leakage; #6 starting Mussaibe Crude and Fuel Oil 4 2 200 200 400 860 #1 boiler leakage; #4 prog maint Nassirya Crude 4 3 140 160 140 440 600 #3 turbine control Najebia Natural Gas and Crude 2 2 95 90 185 160 Hartha Natural Gas and Crude 4 2 120 55 175 300 #4 synch at 1200 Out of Service for Unscheduled Maintanence Total: 1681 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 25 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 140 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 565 600 Quds 2 1 80 160 Gas Oil 32 trucks, #2 fuel level low Musil Dam reg 4 3 25 60 1000 Mosil 12 9 137 150 22 #1 & #9 rotor defect; #12 generator fault Musil Pumping 2 1 110 0 Dibis 3 2 47 30 25 #4 rehab Haditha Dam 6 2 125 160 350 Old Mulla 12 8 105 128 450 #1 acc gear; #2 servo; #5 prog maint; #10 synch at 1011; #12 needs rehab Samarra 3 3 44 55 420 New Mulla 6 3 90 173 2.8 #2 prog maint; #4 stopped at 520 IGV; #6 generator defect Himrin 2 2 50 21 200 Taji 7 5 69 55 14 #3 compressor; #7 needs rehab Hindia 4 4 5 5 120 M. Taji 2 1 8 18 14 #2 software Kufa 4 3 1 0 30 Daura 4 2 50 30 19 #2 prog maint; #3 needs rehab; #4 synch at 956 Total 925 896 Hilla 4 2 37 64 27 #1 cooling sys prob; #2 servo System Generation 83079 MWh Najaf 3 3 145 129 24 Syrian Line Generation 1404 MWh Khor 4 3 96 80 Natural Gas #2 prog maint Turkey Line Generation 1173 MWh Shuaiba 2 1 8 20 Natural Gas #1 prog maint Total Generation 91101 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 4913 MW Petro 4 0 Natural Gas #2 stopped at 600 vib Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 53 MW Mossil East 5 3 13 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4292 MW Diesel 38 Gas Oil Baghdad Load 1400 MW Total 1074 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 25 FEBRUARY 2004 Power transferred from North to Middle 810 MW.
Power transferred from South to Middle 215 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1400 29415 1226 Duhok 53 1517 63 Naynawa 350 8242 343 Tamim 145 3442 143 Salah Aldeen 220 4630 193 Anbar 185 4246 177 Dyala 111 2244 94 Babil 106 2529 105 Kirbala 137 2793 116 Najaf 137 3063 128 Kadsya 46 1344 56 Wasit 95 1946 81 Muthana 60 1374 57 Nasirya 120 2749 115 Misan 75 1405 59 Basra 335 7512 313
Home / Essential Services / ESS-8da7e000
Essential Services
System Status Feb 25
- Date
- 25 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Report Date - 25 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #3 prog maint; #4 synch at 1040, stopped at 647 boiler leakage | ||||
| Baiji | Fuel Oil | 6 | 4 | 90 | 95 | 85 | 100 | 370 | 500 | #2 prog maint; #5 forced outage | ||
| Daura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 1 | 20 | 20 | 200 | #1 & #2 prog maint; #4 & #5 boiler leakage; #6 starting | |||||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 200 | 400 | 860 | #1 boiler leakage; #4 prog maint | ||||
| Nassirya | Crude | 4 | 3 | 140 | 160 | 140 | 440 | 600 | #3 turbine control | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 95 | 90 | 185 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 2 | 120 | 55 | 175 | 300 | #4 synch at 1200 | ||||
| Out of Service for Unscheduled Maintanence | Total: | 1,681 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date - 25 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 140 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 565 | 600 | |
| Quds | 2 | 1 | 80 | 160 | Gas Oil | 32 trucks, #2 fuel level low | Musil Dam reg | 4 | 3 | 25 | 60 | 1,000 |
| Mosil | 12 | 9 | 137 | 150 | 22 | #1 & #9 rotor defect; #12 generator fault | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 47 | 30 | 25 | #4 rehab | Haditha Dam | 6 | 2 | 125 | 160 | 350 |
| Old Mulla | 12 | 8 | 105 | 128 | 450 | #1 acc gear; #2 servo; #5 prog maint; #10 synch at 1011; #12 needs rehab | Samarra | 3 | 3 | 44 | 55 | 420 |
| New Mulla | 6 | 3 | 90 | 173 | 2.80 | #2 prog maint; #4 stopped at 520 IGV; #6 generator defect | Himrin | 2 | 2 | 50 | 21 | 200 |
| Taji | 7 | 5 | 69 | 55 | 14 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | 120 |
| M. Taji | 2 | 1 | 8 | 18 | 14 | #2 software | Kufa | 4 | 3 | 1 | 0 | 30 |
| Daura | 4 | 2 | 50 | 30 | 19 | #2 prog maint; #3 needs rehab; #4 synch at 956 | Total | 925 | 896 | |||
| Hilla | 4 | 2 | 37 | 64 | 27 | #1 cooling sys prob; #2 servo | System Generation | 83,079 | MWh | |||
| Najaf | 3 | 3 | 145 | 129 | 24 | Syrian Line Generation | 1,404 | MWh | ||||
| Khor | 4 | 3 | 96 | 80 | Natural Gas | #2 prog maint | Turkey Line Generation | 1,173 | MWh | |||
| Shuaiba | 2 | 1 | 8 | 20 | Natural Gas | #1 prog maint | Total Generation | 91,101 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 4,913 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | #2 stopped at 600 vib | Syria Peak Load | 60 | MW | |||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 53 | MW | ||||
| Mossil East | 5 | 3 | 13 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Total Peak Load | 4,292 | MW | |||||
| Diesel | 38 | Gas Oil | Baghdad Load | 1,400 | MW | |||||||
| Total | 1,074 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Report Date - 25 FEBRUARY 2004 | |||
|---|---|---|---|
| Power transferred from North to Middle 810 MW. | |||
| Power transferred from South to Middle 215 MW. | |||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,400 | 29,415 | 1,226 |
| Duhok | 53 | 1,517 | 63 |
| Naynawa | 350 | 8,242 | 343 |
| Tamim | 145 | 3,442 | 143 |
| Salah Aldeen | 220 | 4,630 | 193 |
| Anbar | 185 | 4,246 | 177 |
| Dyala | 111 | 2,244 | 94 |
| Babil | 106 | 2,529 | 105 |
| Kirbala | 137 | 2,793 | 116 |
| Najaf | 137 | 3,063 | 128 |
| Kadsya | 46 | 1,344 | 56 |
| Wasit | 95 | 1,946 | 81 |
| Muthana | 60 | 1,374 | 57 |
| Nasirya | 120 | 2,749 | 115 |
| Misan | 75 | 1,405 | 59 |
| Basra | 335 | 7,512 | 313 |
Highlighting search results for: