Home / Essential Services / ESS-8787b075

Essential Services

Electrical System Status on 24/12/2003

Date
24 December 2003
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
Electrical System Status on 24/12/2003 A- Steam Power Stations Power StationsFuel Use No. of UnitsNo. of Operating UnitsUnits LoadTotal Load MWRemarks123456DibisN.G4210/127-717No.1 prog maint. No.3 FDF25/1/04BaijiF.O63100-8590-5/12275No.2 Stopped at 1015 high bearing temp. No.5 Rehab. No.6 prog maint.19/1/04DuraF.O4275---75No.4 Outer leaks. No (5+6) Rehab.S. Bagh.F.O61-25--1/1211/1125No.1 Stopped at 1348 boiler leakage. No.3 Stopped at 945 boiler leakage. No.4 boiler leakage. No. (5+6) prog maint.15/1/0426/12MussaibeC.O + F.O41--3/11210210No.3 Synch at 1634, tripped at 1637 trans. No.3 prog maint. No2 Seal hish temp No.1 ignition. 18/12NassiryaC.O4314014011/11100380No.3 Prog. maint.15/12NajebiaN.G + C.O214/119090No.4 Prog. maint. 22/12HarthaN.G + C.O4114023/10140No.4 Progr. maint.23/12 Total =SUM(ABOVE) 1212B – Gas Power Stations C – Hydro Power Stations Power StationsNo. of UnitsNo. of Operating UnitsStation load MW Fuel use Gas press RemarksPower StationsNo. of UnitsNo. of Operating UnitsStation load MWDischarge ‏M3/SBaiji21120G.ONo.2 . unsufic fuel.Musil Dam Main43320Quds2--G.ONo.2 Stopped at 2121 low fuel level.Musil Dam reg4330450No.1 Stopped at 2310Mosil12711530No.1 Rotor defec.. No. 2 No.8 Bearing high temp. No.4 Cooling weter leak. No. 3 Prog. maint.Musil Pumping2--Dibis3--30No.(4 .5. 6). Rehab.Haditha Dam62130300Old Mulla12560560No.1 Gas control No.2 servo + C/B. No.5 Prog. maint. No.12 Rehab. No 7 prog mints. No.6 Acc. Gear, No.9 Synch 1022Samarra3238400New Mulla641402.9No.4 cooling pump No.6 Generator defect.Himrin212290Taji745519No.7 Rehab. No.4 Turbine. No.3 Compressor. Hindia435100M. Taji2---No.(1+2) software.Kufa4--Dura436816No.3 Rehab. Total =SUM(ABOVE) 545Hilla 4 4 70 32 System Generation = 63634 MWh Najaf 3 2 99 30 No.1 Synch at 1301. No.2 prog. maint. Syrian Line Generation = 1309 MWh Khor43115NGNo.4 Rehab.Turkey line Generation = 1947MWhTotal Generation = 66890MWhShuaiba215NGNo.1 Stand by. No.2 Vib.System peak Load = 2793MWM. Shuaiba 2 - - NG Syrian Line Peak Load = 28 MW Petro 4 1 10 NG Turkey Line Peak Load = 80 MW M. Dibis 4 - - NG Total Peak Load = 2978 MW Mossil East 5 - - G.O Equv. Peak load = 2978+2280+232 = 5490 MW Hmam + Zafranya 7 - - GO Baghdad Load = 770 MW Diesel Sets Sets - GO Total =SUM(ABOVE) 857 NG: Natural Gas FO: Fuel oil CO: Crude oil Start End D.G Mohsen T. Hassan Gas press: Natural Gas GO: Gas oil FO: fuel oil CO: Crude oil ‏Programmed maint.