DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 5, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 3549Mw, 77,826Mw hours, 7-day Avg. 3777Mw
Generators Returned to Service: 30 Mw Old Mulla 9 15 Mw Old Mulla 10 15 Mw
Generators Unscheduled Out of Service (15) 535 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Mussaibe 1
SP
Boiler Leak
200
Mosil 1
CP
Rotor Defect
15
Mosil 2
CP
Hydraulic Pressure Low
15
Mosil 3
CP
Servo
15
Mosil 9
CP
Rotor Defect
15
* Mosil 10
CP
Load gear leakage
15
Khor Zubayr 1
CP
Flame loss
40
Dibis 6
CP
Vibrations
30
Qudus 2
CP
Fuel Pressure Low
100
Old Mulla 1
CP
Acc Gear
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 8
CP
Vibrations
15
Taji 2
CP
Turbine temperature
15
Taji 3,
CP
Compressor
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (28) 1933 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 May
100
Doura 6
SP
R
Bechtel
Jul 03
30 Jun
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 1
CP
M
ME
4 Apr 04
TBD
50
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mosil 11
CP
M
ME
2 Apr 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
4 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
Nassirya 3
SP
M
ME
31 Mar 04
15 Apr
130
Nassirya 4
SP
M
ME
31 Mar 04
15 Apr
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 5
CP
M
ME
2 Apr 04
TBD
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 6
CP
M
ME
2 Apr 04
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
MoE completing PLC work
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
In service 31 March
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 1210 MW.
Power transferred from South to Middle -150 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1260
24195
1008
1366
Duhok
80
1890
79
105
Naynawa
250
7761
323
490
Tamim
111
3212
134
195
Salah Aldeen
165
4554
190
253
Anbar
195
4686
195
246
Dyala
75
2429
101
129
Babil
85
2724
114
141
Kirbala
110
2299
96
110
Najaf
129
2599
108
123
Kadsya
42
1387
58
80
Wasit
75
2244
94
126
Muthana
45
1379
57
73
Nasirya
115
2565
107
122
Misan
60
1395
58
73
Basra
320
2789
241
241
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3
Home / Essential Services / ESS-80c82329
Essential Services