System Status Mar 22

Date
22 March 2004
Category
Essential Services
Text available
English
Files
1
English original XLSDownload English text

Spreadsheet preview

Sheet “A-Steam Power Stations”: 16 rows × 13 columns

Reporting Peak for 21 MARCH 2004 / Report Date - 22 MARCH 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42881624#3 prog maint; #4 fuel filters
BaijiFuel Oil628590175500#1 stopped at 253 high water con; #2 synch at; #3 prog maint; #4 stopped at 730 high water con; #5 forced outage
DauraFuel Oil417070180#4 prog maint; #5 & #6 rehab
South BaghdadFuel Oil62303060200#1 & #2 prog maint; #3 prog maint; #5 stopped at 0010 a/h
MussaibeCrude and Fuel Oil42200200400860#2 prog maint; #4 prog maint
NassiryaCrude42140145285600#2 prog maint; #4 IDF defect
NajebiaNatural Gas and Crude219090160#4 stopped at 1340 oil leakage
HarthaNatural Gas and Crude4250150200300load flow problem
Out of Service for Unscheduled MaintanenceTotal:1,2962,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 21 MARCH 2004 / Report Date - 22 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #3 prog maint; #4 fuel filters Baiji Fuel Oil 6 2 85 90 175 500 #1 stopped at 253 high water con; #2 synch at; #3 prog maint; #4 stopped at 730 high water con; #5 forced outage Daura Fuel Oil 4 1 70 70 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 30 30 60 200 #1 & #2 prog maint; #3 prog maint; #5 stopped at 0010 a/h Mussaibe Crude and Fuel Oil 4 2 200 200 400 860 #2 prog maint; #4 prog maint Nassirya Crude 4 2 140 145 285 600 #2 prog maint; #4 IDF defect Najebia Natural Gas and Crude 2 1 90 90 160 #4 stopped at 1340 oil leakage Hartha Natural Gas and Crude 4 2 50 150 200 300 load flow problem Out of Service for Unscheduled Maintanence Total: 1296 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 21 MARCH 2004 / Report Date - 22 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 90/20 125 Gas Oil #1 gas oil; #2 6.6 kV defect 3 mobil gas unite at peak load Musil Dam Main 4 4 620 600 Quds 2 2 215 160 Gas Oil #2 synch at 1905 - 36 trucks Musil Dam reg 4 3 28 60 1100 Mosil 12 8 130 150 16 #1 rotor defect; #2 prog maint; #9 rotor defect; #11 HP Musil Pumping 2 1 110 0 Dibis 3 2 56 30 28 #4 rehab Haditha Dam 6 4 230 160 2000 Old Mulla 12 6 90 128 440 #1 acc gear; #2 servo; #5 inlet valve; #8 VIB; #9 & #10 CT explosion; #12 needs rehab Samarra 3 3 78 55 780 New Mulla 6 5 170 173 3 #6 generator defect Himrin 2 2 44 21 200 Taji 7 3 45 55 17 #3 compressor; #7 needs rehab - no control card NG press low Hindia 4 4 4 5 160 M. Taji 2 18 #2 software + NGPL Kufa 4 2 2 0 60 Daura 4 2 40 30 16 #2 prog maint; #3 needs rehab NG press low Total 1116 896 Hilla 4 3 47 64 32 #3 prog maint System Generation 80674 MWh Najaf 3 3 135 129 29 Syrian Line Generation 1345 MWh Khor 4 2 80 80 Natural Gas #2 prog maint; #4 flame off Turkey Line Generation 1854 MWh Shuaiba 2 2 6 20 Natural Gas #2 synch at 602 Total Generation 89300 MWh M. Shuaiba 2 Natural Gas System Peak Load 3752 MW Petro 4 1 10 0 Natural Gas #2 vib Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 3 14 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4160 MW Diesel 48 Gas Oil Baghdad Load 1450 MW Total 1097 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 21 MARCH 2004 / Report Date - 22 MARCH 2004 Power transferred from North to Middle 850 MW. Power transferred from South to Middle 80 MW. GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1450 29919 1247 Duhok 82 1921 80 Naynawa 360 8668 361 Tamim 140 3720 155 Salah Aldeen 225 5562 232 Anbar 226 4916 205 Dyala 107 2678 112 Babil 126 3013 126 Kirbala 110 2234 93 Najaf 120 2766 115 Kadsya 68 1504 63 Wasit 95 2211 90 Muthana 65 1393 58 Nasirya 125 2823 118 Misan 75 1509 63 Basra 280 6057 252