DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 15, 2004

Date
15 April 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 15, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Baiji-Baghdad 400 Kv Transmission line now operational Generation: Peak Power 3766Mw, 74,861Mw hours, 7-day Avg. 3667Mw Generators Returned to Service: 138 Mw Dibis 2, SP 8 Mw Baiji 4, SP 70 Mw South Baghdad 5 30 Mw Mosil 11 15 Mw Hilla 5 15 Mw Generators Unscheduled Out of Service (15) 275 Mw PLANT Type SP, CP, RP, HP Fault Mw Baiji 1 CP Filter Cleaning 85 * Baiji2 CP High Generator temperature 90 Baiji Mobile, 1,2,3,4 CP No Fuel 100 Doura 4 CP Natural Gas Pressure low 15 Mosil 1 CP Rotor Defect 15 Mosil 3 CP Power Supply problem 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 6 CP High exhaust temperature 15 Old Mulla 7 CP Generator Vibrations 15 Old Mulla 8 CP Vibrations 15 * Old Mulla 10 CP Vibrations 15 Taji 3, CP Compressor 15 Taji 5 CP Excitor problem 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1923 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M TBD 21 Mar 04 15 May 100 Baiji 3 SP M Bechtel 29 Feb 04 20 Apr 100 Dibis 4 SP M ME 15 Mar 04 30 Apr 8 Doura 1 CP M ME 14 Apr 04 TBD 20 Doura 3 CP R GRD/RIE 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 1 CP M ME 4 Apr 04 TBD 50 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 15 Jun 50 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Mussaibe 4 SP M ME 7 Feb 04 30 Apr 200 Nassirya 1 SP M ME 30 Mar 04 15 May 130 Nassirya 2 SP M ME 9 Mar 04 15 Apr 150 Nassirya 3 SP M ME 31 Mar 04 15 Apr 130 Nassirya 4 SP M ME 31 Mar 04 15 Apr 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Shuaiba 2 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 6 CP M ME 2 Apr 04 TBD 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE Complete MoE completing PLC work Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 15 May Contractor mobilized Dibis to Old Kirkuk 132 Reconductor GRD-RIE 15 Jun Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Jazair to Yarmook 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Baghd West – Jamia 132 Sabotage ME TBD Al Amarah-Burzulgan 132 Looting GRD-RIE 15 Jun 26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: Power transferred from North to Middle 900 MW. Power transferred from South to Middle 150 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1385 22224 926 1465 Duhok 80 1901 79 115 Naynawa 280 6867 286 511 Tamim 115 2985 124 190 Salah Aldeen 180 4734 197 260 Anbar 180 4187 174 244 Dyala 70 1642 68 138 Babil 90 1920 80 144 Kirbala 85 2145 89 107 Najaf 85 2238 93 132 Kadsya 87 1928 80 135 Wasit 58 1323 55 91 Muthana 67 1379 57 86 Nasirya 95 2346 98 128 Misan 64 1407 59 85 Basra 330 5857 244 244 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3