DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 13, 2004

Date
13 April 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 13, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: At approximately 1800 12 April a gun battle in the vicinity of the Baghdad South Substation, (MB 729962463), resulted in damage to a transformer which caused a trip in the 400 Kv line to Qadisiyah and the Baghdad South Kut line. The trip also affected the power plants at Khor Zubayr and Najebia, knocking them offline for a while, they are operational now. The result was only 30 MW of power was exported from the south. No further details at report time. We will continue to see decreased power as we progress through the spring maintenance period. Generation: Peak Power 3371Mw, 77, 529Mw hours, 7-day Avg. 3735Mw Generators Returned to Service: 15 Mw Old Mulla 5 15 Mw Generators Unscheduled Out of Service (19) 538 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Boiler Leak 8 * South Baghdad 5 SP Boiler Leak 30 * Najebia 4 SP Over Current 70 Baiji 1 CP Differential Pressure 85 Baiji Mobile, 1,2,3,4 CP No Fuel 100 Doura 4 CP Natural Gas Pressure low 15 Hilla 5 CP Test 15 * Khor Zubayr 4 CP Over Current 50 Mosil 1 CP Rotor Defect 15 * Mosil 3 CP Power Separator problem 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 6 CP High exhaust temperature 15 Old Mulla 7 CP Generator Vibrations 15 Old Mulla 8 CP Vibrations 15 Old Mulla 11 CP Stopped to allow work on 12 15 Taji 3, CP Compressor 15 Taji 5 CP Excitor problem 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1918 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M TBD 21 Mar 04 21 May 100 Baiji 3 SP M Bechtel 29 Feb 04 1 May 100 Dibis 4 SP M ME 15 Mar 04 30 Apr 8 Doura 3 CP R GRD/RIE 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 1 CP M ME 4 Apr 04 TBD 50 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 15 Jun 50 Mosil 11 CP M ME 2 Apr 04 TBD 15 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Mussaibe 4 SP M ME 7 Feb 04 30 Apr 200 Nassirya 1 SP M ME 30 Mar 04 15 May 130 Nassirya 2 SP M ME 9 Mar 04 15 Apr 150 Nassirya 3 SP M ME 31 Mar 04 15 Apr 130 Nassirya 4 SP M ME 31 Mar 04 15 Apr 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 6 CP M ME 2 Apr 04 TBD 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE 15 Apr 246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE Complete MoE completing PLC work Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete In service 31 March Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 15 May Contractor mobilized Dibis to Old Kirkuk 132 Reconductor GRD-RIE 15 Jun Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Jazair to Yarmook 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Baghd West – Jamia 132 Sabotage ME TBD Al Amarah-Burzulgan 132 Looting GRD-RIE 15 Jun 26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: Power transferred from North to Middle 900 MW. Power transferred from South to Middle -120 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1230 25028 1043 1368 Duhok 80 1925 80 107 Naynawa 300 7593 316 482 Tamim 135 3110 130 188 Salah Aldeen 200 4775 199 249 Anbar 207 4593 191 242 Dyala 79 2107 88 138 Babil 93 2457 102 143 Kirbala 102 2158 90 90 Najaf 138 2475 103 118 Kadsya 75 1881 78 120 Wasit 50 1386 58 82 Muthana 45 1367 57 77 Nasirya 65 2156 90 118 Misan 47 1317 55 77 Basra 30 5450 277 279 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3