DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 13, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: At approximately 1800 12 April a gun battle in the vicinity of the Baghdad South Substation, (MB 729962463), resulted in damage to a transformer which caused a trip in the 400 Kv line to Qadisiyah and the Baghdad South Kut line. The trip also affected the power plants at Khor Zubayr and Najebia, knocking them offline for a while, they are operational now. The result was only 30 MW of power was exported from the south. No further details at report time.
We will continue to see decreased power as we progress through the spring maintenance period.
Generation:
Peak Power 3371Mw, 77, 529Mw hours, 7-day Avg. 3735Mw
Generators Returned to Service: 15 Mw Old Mulla 5 15 Mw
Generators Unscheduled Out of Service (19) 538 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler Leak
8
* South Baghdad 5
SP
Boiler Leak
30
* Najebia 4
SP
Over Current
70
Baiji 1
CP
Differential Pressure
85
Baiji Mobile, 1,2,3,4
CP
No Fuel
100
Doura 4
CP
Natural Gas Pressure low
15
Hilla 5
CP
Test
15
* Khor Zubayr 4
CP
Over Current
50
Mosil 1
CP
Rotor Defect
15
* Mosil 3
CP
Power Separator problem
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 7
CP
Generator Vibrations
15
Old Mulla 8
CP
Vibrations
15
Old Mulla 11
CP
Stopped to allow work on 12 15 Taji 3, CP Compressor 15 Taji 5 CP Excitor problem 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1918 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 1
CP
M
ME
4 Apr 04
TBD
50
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mosil 11
CP
M
ME
2 Apr 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
30 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
Nassirya 3
SP
M
ME
31 Mar 04
15 Apr
130
Nassirya 4
SP
M
ME
31 Mar 04
15 Apr
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 6
CP
M
ME
2 Apr 04
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
MoE completing PLC work
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
In service 31 March
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 900 MW.
Power transferred from South to Middle -120 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1230
25028
1043
1368
Duhok
80
1925
80
107
Naynawa
300
7593
316
482
Tamim
135
3110
130
188
Salah Aldeen
200
4775
199
249
Anbar
207
4593
191
242
Dyala
79
2107
88
138
Babil
93
2457
102
143
Kirbala
102
2158
90
90
Najaf
138
2475
103
118
Kadsya
75
1881
78
120
Wasit
50
1386
58
82
Muthana
45
1367
57
77
Nasirya
65
2156
90
118
Misan
47
1317
55
77
Basra
30
5450
277
279
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-71e11cbe
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 13, 2004
- Date
- 13 April 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: