DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 15, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: No power from Syria due to high winds affecting power lines.
Generation:
Peak Power 4070Mw, 91,541Mw hours, 7-day Avg. 4275Mw
Generators Returned to Service 85 Mw Daura 3 65 Mw Shuaiba 2 20 Mw
Generators Unscheduled Out of Service 656 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler leak
8
* Dibis 4
SP
Boiler Leak
8
* Baiji 4
SP
Boiler Leak
80
South Baghdad 3
SP
Hydraulic System problems
30
South Baghdad 5
SP
Air Heater
30
* Nassirya 1
SP
System Cleaning
130
* Baiji 1
CP
Line Trip
85
Baiji 2,
CP
Lubricating oil leak
110
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
20
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo and Circuit breaker
15
Old Mulla 3
CP
Principle Protector
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1016 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Daura 3
CP
R
GRD/RIE
1 Mar 03
1 Jun
20
Daura 4
SP
M
ME
2 Feb 04
20 Apr
65
Daura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Daura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
15 Feb
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
14 Feb
150
Khor Zubayr 4
CP
R
GRD/RIE
20Dec03
14 Feb
55
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
Najaf 2
CP
M
GRD/RIE
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
GRD/RIE
13 Jan 04
1 Jun
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
1 Jun
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
1 Jun
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
1 Jun
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
Shuaiba 1
CP
M
ME
14 Feb 04
TBD
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
Haditha-Baghd West
400
Sabotage
GRD/RIE
22 Mar
41 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
29 Feb
264 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
5 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
20 Feb
81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
Sabotage
ME
30 Apr
Mosul – Mosul East
132
Sabotage
ME
TBD
Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE
1 Jun
Shuwaiba-Toba-Hamar
132
Sabotage
ME
15 Feb
Baghd West – Jamia
132
Sabotage
ME
TBD
Omara-Burzegan
132
Looting
ME
1 Mar
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Power transferred from North to Middle 800 MW.
Power transferred from South to Middle 220MW.
Baghdad
1520
32973
1374
Duhok
50
1912
80
Naynawa
330
9757
407
Tamim
121
3739
156
Salah Aldeen
185
5111
213
Anbar
180
4527
189
Dyala
100
2446
102
Babil
110
2571
107
Kirbala
110
2561
107
Najaf
120
2880
120
Kadsya
65
1518
63
Wasit
95
2364
99
Muthana
60
1396
58
Nasirya
120
2710
113
Misan
60
1466
61
Basra
260
7319
305
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-70446048
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 15, 2004
- Date
- 15 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: