# A-Steam Power Stations
REPORT DATE - 11 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 8 8 16 24 #1 prog maint; #2 synch at 1140, (8/1); #3 prog maint Baiji Fuel Oil 6 2 95 100 195 500 #2 prog. maint; #3 0549 tripped drum level low; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 3 35 20 30 85 200 #2 A/H; #4 stopped at 001 boiler leakage; #5 prog maint Mussaibe Crude and Fuel Oil 4 2 210 220 430 860 #2 inspec + treament of sealing by Russian expert; #3 0330 stopped boiler leakage Nassirya Crude 4 3 130 140 145 415 600 #4 prog maint Najebia Natural Gas and Crude 2 2 35 90 125 160 #4 one boiler in operation Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1481 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 11 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 3 390 600 Quds 2 2 215 160 Gas Oil 33 trucks Musil Dam reg 4 3 34 60 450 Mosil 12 8 126 150 26 #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect Musil Pumping 2 0 Dibis 3 1 30 30 31 #4 and #5 rehab Haditha Dam 6 2 140 160 300 Old Mulla 12 7 90 128 400 #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab Samarra 3 2 34 55 330 New Mulla 6 3 95 173 280 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 22 21 90 Taji 7 4 60 55 17 #3 Compressor; #4 turbine; #7 Rehab Hindia 4 4 5 5 130 M. Taji 2 1 7 18 #2 software. Kufa 4 0 0 0 Daura 4 3 67 30 17 #3 Rehab Total 625 896 Hilla 4 4 40 64 20 System Generation 79095 MWh Najaf 3 2 75 129 19 #2 prog maint Syrian Line Generation 428 MWh Khor 4 3 120 80 Natural Gas #4 Rehab Turkey Line Generation 1926 MWh Shuaiba 2 1 7 20 Natural Gas #2 S/B Total Generation 81449 MWh M. Shuaiba 2 Natural Gas System Peak Load 3502 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 12 0 Gas Oil Fixed Gen Peak Load 77 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 3719 MW Diesel 15 Gas Oil Baghdad Load 1380 MW Total 1106 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 11 January 2004 GOVERNORATE Average Planned Load (MW) Average Supplied Load (MW) Deviation Power transferred from North to Middle = MW Power transferred from South to Middle = MW Baghdad 1803 1103 700 Duhok 109 78 31 Naynawa 519 311 208 Tamim 183 121 62 Salah Aldeen 233 189 44 Anbar 228 164 64 Dyala 127 76 51 Babil 129 76 53 Kirbala 101 72 29 Najaf 126 88 38 Kadsya 121 71 50 Wasit 87 49 38 Muthana 76 51 25 Nasirya 139 120 19 Misan 77 54 23 Basra 339 308 31
Home / Essential Services / ESS-5d4e1c57
Essential Services
System Status Jan 11
- Date
- 11 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| REPORT DATE - 11 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #1 prog maint; #2 synch at 1140, (8/1); #3 prog maint | ||||
| Baiji | Fuel Oil | 6 | 2 | 95 | 100 | 195 | 500 | #2 prog. maint; #3 0549 tripped drum level low; #5 forced outage; #6 prog maint | ||||
| Daura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 rotor repair; #(5+6) Rehab | |||||
| South Baghdad | Fuel Oil | 6 | 3 | 35 | 20 | 30 | 85 | 200 | #2 A/H; #4 stopped at 001 boiler leakage; #5 prog maint | |||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 210 | 220 | 430 | 860 | #2 inspec + treament of sealing by Russian expert; #3 0330 stopped boiler leakage | ||||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 145 | 415 | 600 | #4 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 35 | 90 | 125 | 160 | #4 one boiler in operation | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,481 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date- 11 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | #2 lubricating oil leak from bearing | Musil Dam Main | 4 | 3 | 390 | 600 | |
| Quds | 2 | 2 | 215 | 160 | Gas Oil | 33 trucks | Musil Dam reg | 4 | 3 | 34 | 60 | 450 |
| Mosil | 12 | 8 | 126 | 150 | 26 | #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect | Musil Pumping | 2 | 0 | |||
| Dibis | 3 | 1 | 30 | 30 | 31 | #4 and #5 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 7 | 90 | 128 | 400 | #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab | Samarra | 3 | 2 | 34 | 55 | 330 |
| New Mulla | 6 | 3 | 95 | 173 | 280 | #4 & #5 prog maint; #6 Generator defect | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 4 | 60 | 55 | 17 | #3 Compressor; #4 turbine; #7 Rehab | Hindia | 4 | 4 | 5 | 5 | 130 |
| M. Taji | 2 | 1 | 7 | 18 | #2 software. | Kufa | 4 | 0 | 0 | 0 | ||
| Daura | 4 | 3 | 67 | 30 | 17 | #3 Rehab | Total | 625 | 896 | |||
| Hilla | 4 | 4 | 40 | 64 | 20 | System Generation | 79,095 | MWh | ||||
| Najaf | 3 | 2 | 75 | 129 | 19 | #2 prog maint | Syrian Line Generation | 428 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | #4 Rehab | Turkey Line Generation | 1,926 | MWh | |||
| Shuaiba | 2 | 1 | 7 | 20 | Natural Gas | #2 S/B | Total Generation | 81,449 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,502 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 2 | 12 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 3,719 | MW | |||||
| Diesel | 15 | Gas Oil | Baghdad Load | 1,380 | MW | |||||||
| Total | 1,106 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 21 rows × 4 columns
| Report Date - 11 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Average Planned Load (MW) | Average Supplied Load (MW) | Deviation |
| Power transferred from North to Middle = MW | |||
| Power transferred from South to Middle = MW | |||
| Baghdad | 1,803 | 1,103 | 700 |
| Duhok | 109 | 78 | 31 |
| Naynawa | 519 | 311 | 208 |
| Tamim | 183 | 121 | 62 |
| Salah Aldeen | 233 | 189 | 44 |
| Anbar | 228 | 164 | 64 |
| Dyala | 127 | 76 | 51 |
| Babil | 129 | 76 | 53 |
| Kirbala | 101 | 72 | 29 |
| Najaf | 126 | 88 | 38 |
| Kadsya | 121 | 71 | 50 |
| Wasit | 87 | 49 | 38 |
| Muthana | 76 | 51 | 25 |
| Nasirya | 139 | 120 | 19 |
| Misan | 77 | 54 | 23 |
| Basra | 339 | 308 | 31 |