DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 6, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3647Mw, 85,645Mw hours, 7-day Avg. 4000 Mw
Generators Returned to Service 170Mw Baiji 3 80 Mw Najebia 4 90 Mw Generators Unscheduled Out of Service 973 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler leak
8
Daura 4
SP
Turbine Vibration
25
*Mussaibe 4
SP
Emergency stop, Vibration
170
South Baghdad 1
SP
Air Heater
30
South Baghdad 2
SP
Boiler Leak
30
Nassirya 2
SP
Boiler Leak
150
Qudas 2
CP
Tripped by loss of Flame
110
Baiji 2,
CP
Lubricating oil leak
110
Baiji 1
CP
High Compression Vibration 110 Mosil 1 CP Rotor Defect 15 Mosil 3 CP Transformr. Primary Protec.
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo and Circuit breaker
15
New Mulla 6
CP
Generator Defect
15
Taji 3,
CP
Compressor
15
Taji 4
CP
Combustion chamber temp.
15
Taji Mobile, 2
CP
Software problem
15
Daura 4
CP
Diesel trouble
15
Shuaiba 2,
CP
Gas Turbine Leak
80
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 874 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
01Mar
100
Baiji 6
SP
M
Bechtel
5 Dec 03
18 Feb
100
Daura 3
CP
R
GRD/RIE
1 Mar 03
1 Jun
20
Daura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Daura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
15 Feb
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Dibis 5
CP
R
GRD/RIE
Sep 03
6 Feb
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
14 Feb
150
Khor Zubayr 4
CP
R
GRD/RIE
20Dec03
14 Feb
55
Najaf 2
CP
R
GRD/RIE
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
GRD/RIE
13 Jan 04
1 Jun
30
New Mulla 4
CP
M
GRD/RIE
3 Jan 04
1 Jun
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
1 Jun
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
1 Jun
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
1 Jun
15
South Baghdad 5
SP
M
ME/Bechtel
1 Mar 03
No ECD
35
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
Haditha-Baghd West
400
Sabotage
GRD/RIE
15 Mar
38 towers complete/236 req’d Hartha-Qarna – Wasit 400 Sabotage GRD/RIE
29 Feb
227 towers complete/293 req’d Baghd South – Diwaniya 400 Sabotage GRD/RIE
Complete
27 towers complete/27 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
10 Feb
60 towers complete/66 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
10 Feb
81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME
TBD
No Contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
Sabotage
ME
30 Apr
Baiji – Mosul
400
Damaged
ME
Complete
Mosul – Mosul East
132
Sabotage
ME
TBD
Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE
Shuwaiba-Toba-Hamar
132
Sabotage
ME
TBD
Baghd West – Jamia
132
Sabotage
ME
TBD
Omara-Burzegan
132
Looting
ME
1 Mar
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 6 February 2004
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 180 MW.
Baghdad
1417
Duhok
82
Naynawa
225
Tamim
116
Salah Aldeen
150
Anbar
157
Dyala
88
Babil
75
Kirbala
92
Najaf
94
Kadsya
40
Wasit
50
Muthana
30
Nasirya
125
Misan
50
Basra
340
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3
Home / Essential Services / ESS-5bcd31f1
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 6, 2004
- Date
- 6 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: