# A-Steam Power Stations
Reporting Peak for 09 MAY 2004 / Report Date - 10 MAY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 DLL; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 4 125 105 85 100 415 500 #1 prog maint Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 2 25 25 50 200 #1, #2, #3 prog maint; #5 A/H Mussaibe Crude and Fuel Oil 4 2 200 210 410 860 #2 prog maint; #4 oil leak Nassirya Crude 4 3 165 165 115 445 600 #1 prog maint Najebia Natural Gas and Crude 2 1 35 35 160 #4 boiler (4) stopped at 218 leak in FWP; #5 thrust bearing prob Hartha Natural Gas and Crude 4 1 180 180 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1543 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 09 MAY 2004 / Report Date - 10 MAY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 160 125 GO+1+FO Musil Dam Main 4 3 400 600 M. Baiji 8 3 60 Gas Oil Musil Dam reg 4 2 28 60 300 Quds 2 2 150 160 CO & GO Musil Pumping 2 0 Mosil 12 7 115 150 27 #1, #2 TF; #7 prog maint; #8 TF; #9 reverse power Haditha Dam 6 4 200 160 400 Dibis 3 1 50 30 28 #4 TF Samarra 3 3 48 55 480 Old Mulla 12 7 90 128 460 #1, #2 TF; #4 engine unbalance; #8 prog maint; #12 TF Himrin 2 2 36 21 135 New Mulla 6 5 140 173 300 #6 TF Hindia 4 4 5 5 140 Taji 7 55 #1, #2 NGPL; #3, #4 TF; #5 NGPL; #6 prog maint; #7 TF Kufa 4 0 M. Taji 2 18 Gas Oil #1, #2 TF Total 717 896 Daura 4 30 #1, #2 NGPL; #3 needs Rehab; #4 prog maint System Generation 71259 MWh Hilla 4 4 55 64 22 #5 running during peak load Syrian Line Generation 1422 MWh Najaf 3 3 115 129 20 Turkey Line Generation 1922 MWh Khor 4 3 90 80 Natural Gas #2 prog maint Total Generation 80030 MWh Shuaiba 2 20 Natural Gas #2 S/B System Peak Load 3380 MW M. Shuaiba 2 1 6 Natural Gas Syria Peak Load 60 MW Petro 4 0 Natural Gas Turkey Peak Load 83 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 20 0 Gas Oil Total Peak Load 3789 MW Hmam/Zafranya 7 2 1 Gas Oil Baghdad Load 1300 MW Diesel 77 Gas Oil Total 1138 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 09 MAY 2004 / Report Date - 10 MAY 2004 Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 185 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1300 27360 1140 1563 Duhok 83 1921 80 111 Naynawa 270 6440 268 284 Tamim 118 2985 124 177 Salah Aldeen 185 4371 182 237 Anbar 185 4098 171 233 Dyala 75 1610 67 131 Babil 75 1956 82 134 Kirbala 70 1563 65 113 Najaf 90 2034 85 135 Kadsya 50 1261 53 94 Wasit 70 1750 73 123 Muthana 45 1120 47 81 Nasirya 127 2846 119 140 Misan 60 1402 58 86 Basra 300 6755 281 348
Home / Essential Services / ESS-570f4765
Essential Services
System Status May 10
- Date
- 10 May 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 09 MAY 2004 / Report Date - 10 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #2 DLL; #3 gen earth fault; #4 prog maint | |||||
| Baiji | Fuel Oil | 6 | 4 | 125 | 105 | 85 | 100 | 415 | 500 | #1 prog maint | ||
| Daura | Fuel Oil | 4 | 0 | 180 | #3, #4 prog maint; #5, #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 2 | 25 | 25 | 50 | 200 | #1, #2, #3 prog maint; #5 A/H | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 210 | 410 | 860 | #2 prog maint; #4 oil leak | ||||
| Nassirya | Crude | 4 | 3 | 165 | 165 | 115 | 445 | 600 | #1 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 1 | 35 | 35 | 160 | #4 boiler (4) stopped at 218 leak in FWP; #5 thrust bearing prob | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 180 | 180 | 300 | #1 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,543 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 27 rows × 13 columns
| Reporting Peak for 09 MAY 2004 / Report Date - 10 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 2 | 160 | 125 | GO+1+FO | Musil Dam Main | 4 | 3 | 400 | 600 | ||
| M. Baiji | 8 | 3 | 60 | Gas Oil | Musil Dam reg | 4 | 2 | 28 | 60 | 300 | ||
| Quds | 2 | 2 | 150 | 160 | CO & GO | Musil Pumping | 2 | 0 | ||||
| Mosil | 12 | 7 | 115 | 150 | 27 | #1, #2 TF; #7 prog maint; #8 TF; #9 reverse power | Haditha Dam | 6 | 4 | 200 | 160 | 400 |
| Dibis | 3 | 1 | 50 | 30 | 28 | #4 TF | Samarra | 3 | 3 | 48 | 55 | 480 |
| Old Mulla | 12 | 7 | 90 | 128 | 460 | #1, #2 TF; #4 engine unbalance; #8 prog maint; #12 TF | Himrin | 2 | 2 | 36 | 21 | 135 |
| New Mulla | 6 | 5 | 140 | 173 | 300 | #6 TF | Hindia | 4 | 4 | 5 | 5 | 140 |
| Taji | 7 | 55 | #1, #2 NGPL; #3, #4 TF; #5 NGPL; #6 prog maint; #7 TF | Kufa | 4 | 0 | ||||||
| M. Taji | 2 | 18 | Gas Oil | #1, #2 TF | Total | 717 | 896 | |||||
| Daura | 4 | 30 | #1, #2 NGPL; #3 needs Rehab; #4 prog maint | System Generation | 71,259 | MWh | ||||||
| Hilla | 4 | 4 | 55 | 64 | 22 | #5 running during peak load | Syrian Line Generation | 1,422 | MWh | |||
| Najaf | 3 | 3 | 115 | 129 | 20 | Turkey Line Generation | 1,922 | MWh | ||||
| Khor | 4 | 3 | 90 | 80 | Natural Gas | #2 prog maint | Total Generation | 80,030 | MWh | |||
| Shuaiba | 2 | 20 | Natural Gas | #2 S/B | System Peak Load | 3,380 | MW | |||||
| M. Shuaiba | 2 | 1 | 6 | Natural Gas | Syria Peak Load | 60 | MW | |||||
| Petro | 4 | 0 | Natural Gas | Turkey Peak Load | 83 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Fixed Gen Peak Load | 266 | MW | ||||
| Mossil East | 5 | 3 | 20 | 0 | Gas Oil | Total Peak Load | 3,789 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 1 | Gas Oil | Baghdad Load | 1,300 | MW | |||||
| Diesel | 77 | Gas Oil | ||||||||||
| Total | 1,138 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 5 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 09 MAY 2004 / Report Date - 10 MAY 2004 | ||||
|---|---|---|---|---|
| Power transferred from North to Middle 850 MW. | ||||
| Power transferred from South to Middle 185 MW. | ||||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | Demand Load MW |
| Baghdad | 1,300 | 27,360 | 1,140 | 1,563 |
| Duhok | 83 | 1,921 | 80 | 111 |
| Naynawa | 270 | 6,440 | 268 | 284 |
| Tamim | 118 | 2,985 | 124 | 177 |
| Salah Aldeen | 185 | 4,371 | 182 | 237 |
| Anbar | 185 | 4,098 | 171 | 233 |
| Dyala | 75 | 1,610 | 67 | 131 |
| Babil | 75 | 1,956 | 82 | 134 |
| Kirbala | 70 | 1,563 | 65 | 113 |
| Najaf | 90 | 2,034 | 85 | 135 |
| Kadsya | 50 | 1,261 | 53 | 94 |
| Wasit | 70 | 1,750 | 73 | 123 |
| Muthana | 45 | 1,120 | 47 | 81 |
| Nasirya | 127 | 2,846 | 119 | 140 |
| Misan | 60 | 1,402 | 58 | 86 |
| Basra | 300 | 6,755 | 281 | 348 |
Highlighting search results for: