DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 4, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3832Mw, 79,983Mw hours, 7-day Avg. 4077Mw Generators Returned to Service: (3) 170 Mw Baiji 2, SP 125 Mw Mosil 3 15 Mw Najaf 2 30 Mw
Generators Unscheduled Out of Service (17) 640 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Najebia 5
SP
Thrust bearing problem
80
* Mussaibe 4
SP
Governor problem
230
South Baghdad 5
SP
Boiler Leak
30
Baiji Mobile, 4
CP
Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
Mosil 1
CP
Rotor Defect
15
* Mosil 2
CP
Reverse Power
15
Mosil 9
CP
Reverse Power
15
New Mulla 4
CP
Unstable Load
30
Old Mulla 7
CP
High exhaust temp
15
Qudas 1
CP
Filter Cleaning
70
Taji 1,2
CP
No gas pressure
30
Taji 3,
CP
Compressor
15
Taji 5
CP
High Exhaust Temp
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (27) 1326 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
Bechtel
21 Mar 04
21 May
100
Baiji 3
SP
M(Additional work)
Bechtel
29 Feb 04
TBD
100
Dibis 3
SP
M
ME
26 Apr 04
5 May
8
Dibis 4
SP
M
ME
15 Mar 04
5 May
8
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
ME
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
TBD
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 7
CP
M
ME
24 Apr 04
TBD
15
Mussaibe 2
SP
M (additional work)
ME
28 Feb 04
20 May
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 1
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 2
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 8
CP
M
ME
17 Apr 04
TBD
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
31 May
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
31 May
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 4
CP
M
GRD/RIE
21 Apr 04
15 JUL
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
New In-service date
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
129 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Complete
246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
28 Feb 05
Start date 21 May 04
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
22 May
Construction ongoing
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
31 Jul
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
5 Jul
Assessment underway
Jazair to Yarmook
132
Reconductor
GRD-RIE
5 Jul
Assessment underway
Baghd West – Jamia
132
Sabotage
ME
TBD
Old Amarah-Burzulgan
132
Looting
GRD-RIE
25 Jun
Assessment underway
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution: No report today Power transferred from North to Middle 800 MW.
Power transferred from South to Middle 2000 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1450
26500
1104
1508
Duhok
80
1928
80
118
Naynawa
400
7719
322
495
Tamim
133
3021
126
188
Salah Aldeen
176
4340
181
247
Anbar
150
3655
152
229
Dyala
75
1906
79
136
Babil
85
2238
93
144
Kirbala
61
1526
64
110
Najaf
80
2002
83
131
Kadsya
40
1058
44
85
Wasit
75
1970
82
128
Muthana
60
1213
51
82
Nasirya
125
2295
96
123
Misan
60
1273
53
81
Basra
320
7432
310
335
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-55153b39
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 4, 2004
- Date
- 4 May 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: