# A-Steam Power Stations
REPORT DATE - 27 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 8 8 24 #1 1450 tript (gov); #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 3 90 90 85 265 500 #2 prog maint; #5 forced outage; #6 prog maint Dura Fuel Oil 4 1 75 75 180 #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 3 25 30 20 75 200 #1 stopped at 1105 boiler leakage; #2 air heater defect; #4 0555 synch; #5 prog maint; #6 1955 synch Mussaibe Crude and Fuel Oil 4 4 100 170 150 210 630 860 #1 limited F.W.P.; #3 boiler check Nassirya Crude 4 3 130 170 180 480 600 #4 prog maint Najebia Natural Gas and Crude 2 2 80 85 165 160 Hartha Natural Gas and Crude 4 1 90 90 300 #1 F.D.F.; #4 prog maint Total: 1788 2824
# B- Gas_C-Power Stations
Report Date- 27 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 3 420 600 Quds 2 2 220 160 Gas Oil 40 trucks, #1 synch at 2010 Musil Dam reg 4 4 48 60 750 Mosil 12 7 131 150 32 #1 rotor defec; #2 servo & ACC; #3 stopped at 2301 bleed valve; #6 stopped at 956 diesel; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 33 60 33 No. 4 and 5 rehab Haditha Dam 6 2 140 160 250 Old Mulla 12 7 94 128 530 #1 ACC gear; #2 servo; #5 prog maint; #10 prog maint; #12 rehab Samarra 3 2 33 55 330 New Mulla 6 3 102 173 340 #1 & #4 prog maint; #6 generator defect Himrin 2 1 23 21 90 Taji 7 4 56 55 18 #3 compressor; #4 flame def; #7 rehab Hindia 4 4 5 5 M. Taji 2 1 7 20 18 #2 software. Kufa 4 0 0 1 Dura 4 3 70 30 18 #3 Rehab Total 779 896 Hilla 4 4 67 64 20 System Generation 78120 MWh Najaf 3 2 65 129 20 #2 prog maint. Syrian Line Generation 1453 MWh Khor 4 3 120 80 Natural Gas #4 Rehab Turkey Line Generation 1963 MWh Shuaiba 2 1 6 20 Natural Gas #2 S/B Total Generation 81536 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3616 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 13 15 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 3883 MW Diesel 27 Gas Oil Baghdad Load 1400 MW Total 1163 1233 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 27 January, 2004 Baghdad 1400 31731 1322 Power transferred from North to Middle 675 MW.
Duhok 80 1920 80
Naynawa 300 7369 307 Power transferred from South to Middle 180MW.
Tamim 125 3299 137
Salah Aldeen 196 4644 194
Anbar 175 3996 167
Dyala 110 2182 91
Babil 80 2253 94
Kirbala 90 1824 76
Najaf 100 2425 101
Kadsya 70 1490 62
Wasit 85 2025 84
Muthana 55 1327 55
Nasirya 120 2700 113
Misan 61 1413 59
Basra 305 7010 292
3352
Home / Essential Services / ESS-5144676c
Essential Services
Power System 27 Jan
- Date
- 27 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 13 rows × 13 columns
| REPORT DATE - 27 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #1 1450 tript (gov); #3 prog maint; #4 boiler leakage | |||||
| Baiji | Fuel Oil | 6 | 3 | 90 | 90 | 85 | 265 | 500 | #2 prog maint; #5 forced outage; #6 prog maint | |||
| Dura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 rotor repair; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 3 | 25 | 30 | 20 | 75 | 200 | #1 stopped at 1105 boiler leakage; #2 air heater defect; #4 0555 synch; #5 prog maint; #6 1955 synch | |||
| Mussaibe | Crude and Fuel Oil | 4 | 4 | 100 | 170 | 150 | 210 | 630 | 860 | #1 limited F.W.P.; #3 boiler check | ||
| Nassirya | Crude | 4 | 3 | 130 | 170 | 180 | 480 | 600 | #4 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 80 | 85 | 165 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 90 | 90 | 300 | #1 F.D.F.; #4 prog maint | |||||
| Total: | 1,788 | 2,824 |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date- 27 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 130 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 3 | 420 | 600 | |
| Quds | 2 | 2 | 220 | 160 | Gas Oil | 40 trucks, #1 synch at 2010 | Musil Dam reg | 4 | 4 | 48 | 60 | 750 |
| Mosil | 12 | 7 | 131 | 150 | 32 | #1 rotor defec; #2 servo & ACC; #3 stopped at 2301 bleed valve; #6 stopped at 956 diesel; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 33 | 60 | 33 | No. 4 and 5 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 250 |
| Old Mulla | 12 | 7 | 94 | 128 | 530 | #1 ACC gear; #2 servo; #5 prog maint; #10 prog maint; #12 rehab | Samarra | 3 | 2 | 33 | 55 | 330 |
| New Mulla | 6 | 3 | 102 | 173 | 340 | #1 & #4 prog maint; #6 generator defect | Himrin | 2 | 1 | 23 | 21 | 90 |
| Taji | 7 | 4 | 56 | 55 | 18 | #3 compressor; #4 flame def; #7 rehab | Hindia | 4 | 4 | 5 | 5 | |
| M. Taji | 2 | 1 | 7 | 20 | 18 | #2 software. | Kufa | 4 | 0 | 0 | 1 | |
| Dura | 4 | 3 | 70 | 30 | 18 | #3 Rehab | Total | 779 | 896 | |||
| Hilla | 4 | 4 | 67 | 64 | 20 | System Generation | 78,120 | MWh | ||||
| Najaf | 3 | 2 | 65 | 129 | 20 | #2 prog maint. | Syrian Line Generation | 1,453 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | #4 Rehab | Turkey Line Generation | 1,963 | MWh | |||
| Shuaiba | 2 | 1 | 6 | 20 | Natural Gas | #2 S/B | Total Generation | 81,536 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,616 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 2 | 13 | 15 | Gas Oil | Fixed Gen Peak Load | 127 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 3,883 | MW | |||||
| Diesel | 27 | Gas Oil | Baghdad Load | 1,400 | MW | |||||||
| Total | 1,163 | 1,233 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 21 rows × 5 columns · preview of the first 19 rows; full file from the original button
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 27 January, 2004 |
|---|---|---|---|---|
| Baghdad | 1,400 | 31,731 | 1,322 | Power transferred from North to Middle 675 MW. |
| Duhok | 80 | 1,920 | 80 | |
| Naynawa | 300 | 7,369 | 307 | Power transferred from South to Middle 180MW. |
| Tamim | 125 | 3,299 | 137 | |
| Salah Aldeen | 196 | 4,644 | 194 | |
| Anbar | 175 | 3,996 | 167 | |
| Dyala | 110 | 2,182 | 91 | |
| Babil | 80 | 2,253 | 94 | |
| Kirbala | 90 | 1,824 | 76 | |
| Najaf | 100 | 2,425 | 101 | |
| Kadsya | 70 | 1,490 | 62 | |
| Wasit | 85 | 2,025 | 84 | |
| Muthana | 55 | 1,327 | 55 | |
| Nasirya | 120 | 2,700 | 113 | |
| Misan | 61 | 1,413 | 59 | |
| Basra | 305 | 7,010 | 292 | |
| 3,352 |