# A-Steam Power Stations
Reporting Peak for 11 MAY 2004 / Report Date - 12 MAY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #1 synch at 1401; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 3 79 80 97 256 500 #1 prog maint; #3 GRF Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 2 25 35 60 200 #1, #2, #3 prog maint; #5 A/H Mussaibe Crude and Fuel Oil 4 3 200 200 160 560 860 #2 prog maint Nassirya Crude 4 3 160 160 120 440 600 #1 prog maint Najebia Natural Gas and Crude 2 1 80 80 160 #5 thrust bearing prob Hartha Natural Gas and Crude 4 1 180 180 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1592 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 11 MAY 2004 / Report Date - 12 MAY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 80 125 GO+1+FO #2 prog maint Musil Dam Main 4 3 490 600 M. Baiji 8 3 60 Gas Oil Musil Dam reg 4 2 26 60 300 Quds 2 2 140 160 CO & GO Musil Pumping 2 0 Mosil 12 7 108 150 24 #1, #2 TF; #6 synch at 1135; #7 prog maint; #8 TF Haditha Dam 6 4 260 160 500 Dibis 3 2 45 30 26 #4 TF Samarra 3 3 45 55 450 Old Mulla 12 7 98 128 460 #1, #2 TF; #4 load unbalance; #8 prog maint; #12 TF Himrin 2 2 36 21 135 New Mulla 6 5 130 173 280 #6 TF Hindia 4 4 5 5 Taji 7 55 #1, #2 NGPL; #3, #4 TF; #5 NGPL; #6 prog maint; #7 TF Kufa 4 0 M. Taji 2 18 Gas Oil #1, #2 TF Total 862 896 Daura 4 30 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 74001 MWh Hilla 4 4 64 64 22 #5 running during peak load Syrian Line Generation 1421 MWh Najaf 3 3 110 129 19 Turkey Line Generation 1824 MWh Khor 4 3 140 80 Natural Gas #2 prog maint Total Generation 82673 MWh Shuaiba 2 1 5 20 Natural Gas #2 S/B System Peak Load 3570 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 2 12 0 Gas Oil Total Peak Load 3976 MW Hmam/Zafranya 7 1 2 Gas Oil Baghdad Load 1365 MW Diesel 79 Gas Oil Total 1082 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 11 MAY 2004 / Report Date - 12 MAY 2004 Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 180 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1365 28014 1167 1661 Duhok 80 1909 80 115 Naynawa 348 6070 253 491 Tamim 132 2662 111 188 Salah Aldeen 190 4210 175 247 Anbar 205 3536 147 227 Dyala 90 1742 73 136 Babil 95 1976 82 142 Kirbala 65 1497 62 111 Najaf 90 1896 79 134 Kadsya 57 167 49 90 Wasit 85 1822 76 126 Muthana 60 1142 48 77 Nasirya 125 2808 197 131 Misan 65 1450 60 78 Basra 320 7471 311 354
Home / Essential Services / ESS-419ad3ea
Essential Services
System Status May 12
- Date
- 12 May 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 11 MAY 2004 / Report Date - 12 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #1 synch at 1401; #3 gen earth fault; #4 prog maint | ||||
| Baiji | Fuel Oil | 6 | 3 | 79 | 80 | 97 | 256 | 500 | #1 prog maint; #3 GRF | |||
| Daura | Fuel Oil | 4 | 0 | 180 | #3, #4 prog maint; #5, #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 2 | 25 | 35 | 60 | 200 | #1, #2, #3 prog maint; #5 A/H | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 200 | 200 | 160 | 560 | 860 | #2 prog maint | |||
| Nassirya | Crude | 4 | 3 | 160 | 160 | 120 | 440 | 600 | #1 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 1 | 80 | 80 | 160 | #5 thrust bearing prob | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 180 | 180 | 300 | #1 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,592 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 27 rows × 13 columns
| Reporting Peak for 11 MAY 2004 / Report Date - 12 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 80 | 125 | GO+1+FO | #2 prog maint | Musil Dam Main | 4 | 3 | 490 | 600 | |
| M. Baiji | 8 | 3 | 60 | Gas Oil | Musil Dam reg | 4 | 2 | 26 | 60 | 300 | ||
| Quds | 2 | 2 | 140 | 160 | CO & GO | Musil Pumping | 2 | 0 | ||||
| Mosil | 12 | 7 | 108 | 150 | 24 | #1, #2 TF; #6 synch at 1135; #7 prog maint; #8 TF | Haditha Dam | 6 | 4 | 260 | 160 | 500 |
| Dibis | 3 | 2 | 45 | 30 | 26 | #4 TF | Samarra | 3 | 3 | 45 | 55 | 450 |
| Old Mulla | 12 | 7 | 98 | 128 | 460 | #1, #2 TF; #4 load unbalance; #8 prog maint; #12 TF | Himrin | 2 | 2 | 36 | 21 | 135 |
| New Mulla | 6 | 5 | 130 | 173 | 280 | #6 TF | Hindia | 4 | 4 | 5 | 5 | |
| Taji | 7 | 55 | #1, #2 NGPL; #3, #4 TF; #5 NGPL; #6 prog maint; #7 TF | Kufa | 4 | 0 | ||||||
| M. Taji | 2 | 18 | Gas Oil | #1, #2 TF | Total | 862 | 896 | |||||
| Daura | 4 | 30 | #1, #2 NGPL; #3 needs rehab; #4 prog maint | System Generation | 74,001 | MWh | ||||||
| Hilla | 4 | 4 | 64 | 64 | 22 | #5 running during peak load | Syrian Line Generation | 1,421 | MWh | |||
| Najaf | 3 | 3 | 110 | 129 | 19 | Turkey Line Generation | 1,824 | MWh | ||||
| Khor | 4 | 3 | 140 | 80 | Natural Gas | #2 prog maint | Total Generation | 82,673 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #2 S/B | System Peak Load | 3,570 | MW | |||
| M. Shuaiba | 2 | Natural Gas | Syria Peak Load | 60 | MW | |||||||
| Petro | 4 | 0 | Natural Gas | Turkey Peak Load | 80 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Fixed Gen Peak Load | 266 | MW | ||||
| Mossil East | 5 | 2 | 12 | 0 | Gas Oil | Total Peak Load | 3,976 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Baghdad Load | 1,365 | MW | |||||
| Diesel | 79 | Gas Oil | ||||||||||
| Total | 1,082 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 5 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 11 MAY 2004 / Report Date - 12 MAY 2004 | ||||
|---|---|---|---|---|
| Power transferred from North to Middle 750 MW. | ||||
| Power transferred from South to Middle 180 MW. | ||||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | Demand Load MW |
| Baghdad | 1,365 | 28,014 | 1,167 | 1,661 |
| Duhok | 80 | 1,909 | 80 | 115 |
| Naynawa | 348 | 6,070 | 253 | 491 |
| Tamim | 132 | 2,662 | 111 | 188 |
| Salah Aldeen | 190 | 4,210 | 175 | 247 |
| Anbar | 205 | 3,536 | 147 | 227 |
| Dyala | 90 | 1,742 | 73 | 136 |
| Babil | 95 | 1,976 | 82 | 142 |
| Kirbala | 65 | 1,497 | 62 | 111 |
| Najaf | 90 | 1,896 | 79 | 134 |
| Kadsya | 57 | 167 | 49 | 90 |
| Wasit | 85 | 1,822 | 76 | 126 |
| Muthana | 60 | 1,142 | 48 | 77 |
| Nasirya | 125 | 2,808 | 197 | 131 |
| Misan | 65 | 1,450 | 60 | 78 |
| Basra | 320 | 7,471 | 311 | 354 |