Spreadsheet preview

Sheet “A-Steam Power Stations”: 16 rows × 13 columns

Reporting Peak for 08 MAY 2004 / Report Date - 09 MAY 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas4024#1 stopped at 810 boiler leak; #2 DLL; #3 gen earth fault; #4 prog maint
BaijiFuel Oil6311085100295500#1 prog maint; #2 synch at 1551; #3 synch at 1220; #4 stopped at 200 excit prob
DauraFuel Oil40180#3, #4 prog maint; #5, #6 rehab
South BaghdadFuel Oil613030200#1, #2, #3 prog maint; #5 stopped at 505 a/h; #6 BL
MussaibeCrude and Fuel Oil42200210410860#2 prog maint; #4 oil leak
NassiryaCrude43160160125445600#1 prog maint
NajebiaNatural Gas and Crude213535160#4 boiler (4) stopped at 218 leak in FWP; #5 thrust bearing prob
HarthaNatural Gas and Crude41180180300#1 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,3952,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 08 MAY 2004 / Report Date - 09 MAY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 0 24 #1 stopped at 810 boiler leak; #2 DLL; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 3 110 85 100 295 500 #1 prog maint; #2 synch at 1551; #3 synch at 1220; #4 stopped at 200 excit prob Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 1 30 30 200 #1, #2, #3 prog maint; #5 stopped at 505 a/h; #6 BL Mussaibe Crude and Fuel Oil 4 2 200 210 410 860 #2 prog maint; #4 oil leak Nassirya Crude 4 3 160 160 125 445 600 #1 prog maint Najebia Natural Gas and Crude 2 1 35 35 160 #4 boiler (4) stopped at 218 leak in FWP; #5 thrust bearing prob Hartha Natural Gas and Crude 4 1 180 180 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1395 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 08 MAY 2004 / Report Date - 09 MAY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 160 125 GO+1+FO Musil Dam Main 4 3 400 600 M. Baiji 8 3 57 Gas Oil Musil Dam reg 4 2 24 60 300 Quds 2 2 175 160 CO & GO Musil Pumping 2 0 Mosil 12 7 115 150 27 #1, #2 TF; #7 prog maint; #8 TF; #9 reverse power Haditha Dam 6 4 250 160 400 Dibis 3 2 50 30 28 #4 TF Samarra 3 3 47 55 590 Old Mulla 12 7 98 128 480 #1, #2 TF; #4 engine unbalabce; #8 prog maint; #12 TF Himrin 2 2 36 21 135 New Mulla 6 5 150 173 3 #4 synch at 1430; #6 TF Hindia 4 4 5 5 120 Taji 7 55 #1, #2 NGPL; #3, #4 TF; #5 NGPL; #6 prog maint; #7 TF Kufa 4 0 60 M. Taji 2 18 Gas Oil #1, #2 TF Total 762 896 Daura 4 30 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 69386 MWh Hilla 4 4 63 64 25 #5 running during peak load Syrian Line Generation 1387 MWh Najaf 3 3 120 129 23 Turkey Line Generation 1905 MWh Khor 4 3 95 80 Natural Gas #2 prog maint; #4 stopped at 1812 oil leak Total Generation 78105 MWh Shuaiba 2 1 4 20 Natural Gas #2 s/b System Peak Load 3479 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 17 0 Gas Oil Total Peak Load 3885 MW Hmam/Zafranya 7 1 2 Gas Oil Baghdad Load 1370 MW Diesel 78 Gas Oil Total 1193 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 08 MAY 2004 / Report Date - 09 MAY 2004 Power transferred from North to Middle950 MW. Power transferred from South to Middle 250 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1370 24008 1000 1544 Duhok 80 1895 79 110 Naynawa 250 6129 255 499 Tamim 130 2813 117 185 Salah Aldeen 210 4363 182 250 Anbar 108 4137 172 234 Dyala 70 1590 66 136 Babil 95 1924 80 140 Kirbala 65 1542 64 111 Najaf 95 1989 83 134 Kadsya 55 1147 48 95 Wasit 75 1750 73 123 Muthana 45 1154 48 76 Nasirya 120 2591 108 128 Misan 65 1405 59 81 Basra 320 6853 286 325