# A-Steam Power Stations
REPORT DATE - 3 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 0 0 0 8 8 24 No.1 mnt 10 DEC to 25 JAN. No 3 FDF. No. 2 stopped 1523 gas valve.
Baiji Fuel Oil 6 2 95 0 0 90 0 0 185 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 boiler leak. No. 2 stopped 1407 leak at HCL. No. 3 boiler leak.
Dura Fuel Oil 4 1 75 0 0 0 75 180 Nos. 5 & 6: Rehab. No. 4 stopped 0405 noise in bearing.
South Baghdad Fuel Oil 6 4 35 25 20 30 0 30 140 200 No. 5 mnt 1 DEC to 15 JAN.
Mussaibe Crude and Fuel Oil 4 2 215 0 0 220 435 860 No. 3 starting. No. 2 sealing.
Nassirya Crude 4 3 130 140 135 0 405 600 No. 4 programmed mnt 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 1 30 0 30 160 No. stopped 1515 cooling eject sealing.
Hartha Natural Gas and Crude 4 1 130 0 130 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1408 2824
# B- Gas_C-Power Stations
Report Date- 3 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil No. 2 insufficient fuel. Musil Dam Main 4 3 390 600 Quds 2 1 112 160 Gas Oil 32 trucks. Musil Dam reg 4 3 30 60 450 Mosil 12 8 120 150 29 No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. Musil Pumping 2 1 110 0 Dibis 3 1 30 60 29 No. 4 and 5 rehab. No. 6 synch 1810 28 DEC. Haditha Dam 6 2 140 160 300 Old Mulla 12 6 63 128 490 No. 1 ACC gear. No. 2 servo. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. Samarra 3 3 40 55 400 New Mulla 6 4 120 173 3.2 No. 5 programmed mnt. No. 6 Generator Defective. Himrin 2 1 22 21 90 Taji 7 3 42 55 18 No. 3 Compressor. No. 4 Turbine. No. 5 pilot excit. No. 7 Rehab. Hindia 4 3 4 5 M. Taji 2 1 7 20 Natural Gas No. 2 software. Kufa 4 0 0 1 Dura 4 3 70 30 17 No.3 Rehabilitation. Total 736 896 Hilla 4 4 65 64 32 System Generation 72722 MWh Najaf 3 2 98 129 28 No. 2 program mnt. Syrian Line Generation 1430 MWh Khor 4 3 120 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1874 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 S/B Total Generation 76026 MWh Petro 4 1 0 0 Natural Gas System Peak Load 3290 MW M. Dibis 4 0 10 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 80 MW Hmam/Zafranya 7 0 0 Gas Oil Fixed Gen Peak Load 77 MW Diesel 0 Gas Oil Total Peak Load 3507 MW Total 992 1233 Baghdad Load 1520 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 10 January, 2004 Baghdad 1500 31054 1293.9167 Power transferred from North to Middle 460 MW.
Duhok 80 1883 78.4583
Naynawa 385 7518 313.25 Power transferred from South to Middle 150 MW.
Tamim 120 3087 128.625
Salah Aldeen 150 4381 182.5417 Anbar 180 4030 167.9167 Dyala 70 1705 71.0417 Babil 75 1847 76.9583 Kirbala 60 1635 68.125 Najaf 85 2218 92.4167 Kadsya 50 1307 54.4583 Wasit 55 1834 76.4167 Muthana 45 1156 48.1667 Nasirya 100 2385 99.375 Misan 55 1343 55.9583 Basra 315 7290 106 3325
Home / Essential Services / ESS-2c1685ff
Essential Services
Power System 10 jan
- Date
- 10 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 13 rows × 13 columns
| REPORT DATE - 3 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 0 | 0 | 0 | 8 | 8 | 24 | No.1 mnt 10 DEC to 25 JAN. No 3 FDF. No. 2 stopped 1523 gas valve. | ||
| Baiji | Fuel Oil | 6 | 2 | 95 | 0 | 0 | 90 | 0 | 0 | 185 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 boiler leak. No. 2 stopped 1407 leak at HCL. No. 3 boiler leak. |
| Dura | Fuel Oil | 4 | 1 | 75 | 0 | 0 | 0 | 75 | 180 | Nos. 5 & 6: Rehab. No. 4 stopped 0405 noise in bearing. | ||
| South Baghdad | Fuel Oil | 6 | 4 | 35 | 25 | 20 | 30 | 0 | 30 | 140 | 200 | No. 5 mnt 1 DEC to 15 JAN. |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 215 | 0 | 0 | 220 | 435 | 860 | No. 3 starting. No. 2 sealing. | ||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 135 | 0 | 405 | 600 | No. 4 programmed mnt 28 DEC to 28 JAN. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 30 | 0 | 30 | 160 | No. stopped 1515 cooling eject sealing. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 130 | 0 | 130 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,408 | 2,824 |
Sheet “B- Gas_C-Power Stations”: 25 rows × 13 columns
| Report Date- 3 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | No. 2 insufficient fuel. | Musil Dam Main | 4 | 3 | 390 | 600 | |
| Quds | 2 | 1 | 112 | 160 | Gas Oil | 32 trucks. | Musil Dam reg | 4 | 3 | 30 | 60 | 450 |
| Mosil | 12 | 8 | 120 | 150 | 29 | No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 30 | 60 | 29 | No. 4 and 5 rehab. No. 6 synch 1810 28 DEC. | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 6 | 63 | 128 | 490 | No. 1 ACC gear. No. 2 servo. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. | Samarra | 3 | 3 | 40 | 55 | 400 |
| New Mulla | 6 | 4 | 120 | 173 | 3.20 | No. 5 programmed mnt. No. 6 Generator Defective. | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 3 | 42 | 55 | 18 | No. 3 Compressor. No. 4 Turbine. No. 5 pilot excit. No. 7 Rehab. | Hindia | 4 | 3 | 4 | 5 | |
| M. Taji | 2 | 1 | 7 | 20 | Natural Gas | No. 2 software. | Kufa | 4 | 0 | 0 | 1 | |
| Dura | 4 | 3 | 70 | 30 | 17 | No.3 Rehabilitation. | Total | 736 | 896 | |||
| Hilla | 4 | 4 | 65 | 64 | 32 | System Generation | 72,722 | MWh | ||||
| Najaf | 3 | 2 | 98 | 129 | 28 | No. 2 program mnt. | Syrian Line Generation | 1,430 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 1,874 | MWh | |||
| Shuaiba | 2 | 1 | 10 | 20 | Natural Gas | No. 1 S/B | Total Generation | 76,026 | MWh | |||
| Petro | 4 | 1 | 0 | 0 | Natural Gas | System Peak Load | 3,290 | MW | ||||
| M. Dibis | 4 | 0 | 10 | 24 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 80 | MW | ||||
| Hmam/Zafranya | 7 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Diesel | 0 | Gas Oil | Total Peak Load | 3,507 | MW | |||||||
| Total | 992 | 1,233 | Baghdad Load | 1,520 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 21 rows × 5 columns · preview of the first 19 rows; full file from the original button
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 10 January, 2004 |
|---|---|---|---|---|
| Baghdad | 1,500 | 31,054 | 1,293.92 | Power transferred from North to Middle 460 MW. |
| Duhok | 80 | 1,883 | 78.46 | |
| Naynawa | 385 | 7,518 | 313.25 | Power transferred from South to Middle 150 MW. |
| Tamim | 120 | 3,087 | 128.62 | |
| Salah Aldeen | 150 | 4,381 | 182.54 | |
| Anbar | 180 | 4,030 | 167.92 | |
| Dyala | 70 | 1,705 | 71.04 | |
| Babil | 75 | 1,847 | 76.96 | |
| Kirbala | 60 | 1,635 | 68.12 | |
| Najaf | 85 | 2,218 | 92.42 | |
| Kadsya | 50 | 1,307 | 54.46 | |
| Wasit | 55 | 1,834 | 76.42 | |
| Muthana | 45 | 1,156 | 48.17 | |
| Nasirya | 100 | 2,385 | 99.38 | |
| Misan | 55 | 1,343 | 55.96 | |
| Basra | 315 | 7,290 | 106 | |
| 3,325 |
Highlighting search results for: