# A-Steam Power Stations
Reporting Peak for 27 APRIL 2004 / Report Date - 28 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 0 24 #1, #2 stop work on network; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 2 90 105 195 500 #1 prog maint; #2 48 hrs maint; #3 prog maint Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 3 30 30 30 90 200 #1, #2, #3 prog maint; #4 synch at 1850 Mussaibe Crude and Fuel Oil 4 3 215 205 215 635 860 #2 prog maint Nassirya Crude 4 3 170 160 130 460 600 #1 prog maint Najebia Natural Gas and Crude 2 2 75 35 110 160 Hartha Natural Gas and Crude 4 1 175 175 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1665 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 27 APRIL 2004 / Report Date - 28 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 190 125 Gas Oil #1 synch at 1620 Musil Dam Main 4 4 600 600 M. Baiji 8 3 60 Gas Oil Musil Dam reg 4 3 27 60 350 Quds 2 2 150 160 Gas Oil 26 trucks Musil Pumping 2 0 Mosil 12 8 126 150 26 #1, #2 TF; #7 prog maint; #9 TF Haditha Dam 6 4 230 160 400 Dibis 3 1 25 30 30 #4 TF; #5 stopped at 710 due to turbine vibration Samarra 3 3 49 55 590 Old Mulla 12 7 110 128 490 #1, #2 TF; #7 HET; #8 prog maint; #12 TF Himrin 2 2 35 21 135 New Mulla 6 5 148 173 28 #6 TF Hindia 4 4 5 5 120 Taji 7 55 #1, #2 NGPL; #3 TF; #4 NGPL; #5 HET; #6 prog maint; #7 TF Kufa 4 2 1 0 60 M. Taji 2 18 Gas Oil #2 software Total 947 896 Daura 4 30 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 74609 MWh Hilla 4 4 63 64 24 Syrian Line Generation 1321 MWh Najaf 3 3 126 129 24 Turkey Line Generation 1926 MWh Khor 4 3 140 80 Natural Gas #2 prog maint Total Generation 82283 MWh Shuaiba 2 1 13 20 Natural Gas #1 vib System Peak Load 3858 MW M. Shuaiba 2 Natural Gas Syria Peak Load 45 MW Petro 4 0 Natural Gas Turkey Peak Load 82 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 15 0 Gas Oil Total Peak Load 4251 MW Hmam/Zafranya 7 1 2 Gas Oil Baghdad Load 1350 MW Diesel 56 Gas Oil Total 1233 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 27 APRIL 2004 / Report Date - 28 APRIL 2004 Power transferred from North to Middle 940 MW.
Power transferred from South to Middle 230 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1350 29940 1248 1439 Duhok 80 1918 80 105 Naynawa 385 8019 334 488 Tamim 145 3221 134 175 Salah Aldeen 210 4880 203 243 Anbar 210 4184 174 213 Dyala 100 2197 92 130 Babil 105 2251 94 138 Kirbala 102 2109 88 110 Najaf 115 2435 101 126 Kadsya 70 1508 63 84 Wasit 75 2111 88 114 Muthana 58 1358 57 75 Nasirya 130 2593 108 125 Misan 60 1306 54 80 Basra 300 6461 269 284
Home / Essential Services / ESS-1d81834a
Essential Services
System Status Apr 28
- Date
- 28 April 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 27 APRIL 2004 / Report Date - 28 APRIL 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 0 | 24 | #1, #2 stop work on network; #3 gen earth fault; #4 prog maint | |||||||
| Baiji | Fuel Oil | 6 | 2 | 90 | 105 | 195 | 500 | #1 prog maint; #2 48 hrs maint; #3 prog maint | ||||
| Daura | Fuel Oil | 4 | 0 | 180 | #3, #4 prog maint; #5, #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 3 | 30 | 30 | 30 | 90 | 200 | #1, #2, #3 prog maint; #4 synch at 1850 | |||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 215 | 205 | 215 | 635 | 860 | #2 prog maint | |||
| Nassirya | Crude | 4 | 3 | 170 | 160 | 130 | 460 | 600 | #1 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 75 | 35 | 110 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 175 | 175 | 300 | #1 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,665 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 27 rows × 13 columns
| Reporting Peak for 27 APRIL 2004 / Report Date - 28 APRIL 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 2 | 190 | 125 | Gas Oil | #1 synch at 1620 | Musil Dam Main | 4 | 4 | 600 | 600 | |
| M. Baiji | 8 | 3 | 60 | Gas Oil | Musil Dam reg | 4 | 3 | 27 | 60 | 350 | ||
| Quds | 2 | 2 | 150 | 160 | Gas Oil | 26 trucks | Musil Pumping | 2 | 0 | |||
| Mosil | 12 | 8 | 126 | 150 | 26 | #1, #2 TF; #7 prog maint; #9 TF | Haditha Dam | 6 | 4 | 230 | 160 | 400 |
| Dibis | 3 | 1 | 25 | 30 | 30 | #4 TF; #5 stopped at 710 due to turbine vibration | Samarra | 3 | 3 | 49 | 55 | 590 |
| Old Mulla | 12 | 7 | 110 | 128 | 490 | #1, #2 TF; #7 HET; #8 prog maint; #12 TF | Himrin | 2 | 2 | 35 | 21 | 135 |
| New Mulla | 6 | 5 | 148 | 173 | 28 | #6 TF | Hindia | 4 | 4 | 5 | 5 | 120 |
| Taji | 7 | 55 | #1, #2 NGPL; #3 TF; #4 NGPL; #5 HET; #6 prog maint; #7 TF | Kufa | 4 | 2 | 1 | 0 | 60 | |||
| M. Taji | 2 | 18 | Gas Oil | #2 software | Total | 947 | 896 | |||||
| Daura | 4 | 30 | #1, #2 NGPL; #3 needs rehab; #4 prog maint | System Generation | 74,609 | MWh | ||||||
| Hilla | 4 | 4 | 63 | 64 | 24 | Syrian Line Generation | 1,321 | MWh | ||||
| Najaf | 3 | 3 | 126 | 129 | 24 | Turkey Line Generation | 1,926 | MWh | ||||
| Khor | 4 | 3 | 140 | 80 | Natural Gas | #2 prog maint | Total Generation | 82,283 | MWh | |||
| Shuaiba | 2 | 1 | 13 | 20 | Natural Gas | #1 vib | System Peak Load | 3,858 | MW | |||
| M. Shuaiba | 2 | Natural Gas | Syria Peak Load | 45 | MW | |||||||
| Petro | 4 | 0 | Natural Gas | Turkey Peak Load | 82 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Fixed Gen Peak Load | 266 | MW | ||||
| Mossil East | 5 | 3 | 15 | 0 | Gas Oil | Total Peak Load | 4,251 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Baghdad Load | 1,350 | MW | |||||
| Diesel | 56 | Gas Oil | ||||||||||
| Total | 1,233 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 5 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 27 APRIL 2004 / Report Date - 28 APRIL 2004 | ||||
|---|---|---|---|---|
| Power transferred from North to Middle 940 MW. | ||||
| Power transferred from South to Middle 230 MW. | ||||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | Demand Load MW |
| Baghdad | 1,350 | 29,940 | 1,248 | 1,439 |
| Duhok | 80 | 1,918 | 80 | 105 |
| Naynawa | 385 | 8,019 | 334 | 488 |
| Tamim | 145 | 3,221 | 134 | 175 |
| Salah Aldeen | 210 | 4,880 | 203 | 243 |
| Anbar | 210 | 4,184 | 174 | 213 |
| Dyala | 100 | 2,197 | 92 | 130 |
| Babil | 105 | 2,251 | 94 | 138 |
| Kirbala | 102 | 2,109 | 88 | 110 |
| Najaf | 115 | 2,435 | 101 | 126 |
| Kadsya | 70 | 1,508 | 63 | 84 |
| Wasit | 75 | 2,111 | 88 | 114 |
| Muthana | 58 | 1,358 | 57 | 75 |
| Nasirya | 130 | 2,593 | 108 | 125 |
| Misan | 60 | 1,306 | 54 | 80 |
| Basra | 300 | 6,461 | 269 | 284 |