# A-Steam Power Stations
REPORT DATE - 02 FEBRUARY 2004
A - Steam Power Stations
Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 8 8 16 24 Baiji Fuel Oil 6 90 85 175 500 Daura Fuel Oil 4 65 65 180 South Baghdad Fuel Oil 6 30 30 200 4 stopped Mussaibe Crude and Fuel Oil 4 200 200 190 190 780 860 Nassirya Crude 4 150 140 290 600 Najebia Natural Gas and Crude 2 90 90 160 Hartha Natural Gas and Crude 4 80 80 300 Out of Service for Unscheduled Maintanence Total: 1526 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 02 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil 1 stopped - comp vibration Musil Dam Main 4 4 500 600 Quds 2 2 120 160 Gas Oil Musil Dam reg 4 3 37 60 Mosil 12 9 147 150 Musil Pumping 2 1 110 0 Dibis 3 1 28 30 Haditha Dam 6 160 Old Mulla 12 7 94 128 Samarra 3 2 44 55 New Mulla 6 3 103 173 Himrin 2 2 34 21 Taji 7 4 66 55 Hindia 4 4 5 5 M. Taji 2 2 8 18 Kufa 4 2 1 0 Daura 4 3 70 30 4 stopped - generator trip Total 731 896 Hilla 4 4 67 64 System Generation MWh Najaf 3 2 90 129 Syrian Line Generation MWh Khor 4 3 130 80 Natural Gas Turkey Line Generation MWh Shuaiba 2 1 4 20 Natural Gas Total Generation 87291 MWh M. Shuaiba 2 Natural Gas System Peak Load 3814 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 17 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 3 51 Gas Oil Total Peak Load 4220 MW Diesel Gas Oil Baghdad Load 1450 MW Total 1144 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 02 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1000 Duhok 82 Naynawa 450 Tamim 190 Salah Aldeen 175 Anbar 218 Dyala 136 Babil 114 Kirbala 131 Najaf 128 Kadsya 60 Wasit 115 Muthana 65 Nasirya 135 Misan 65 Basra 290 3354
Home / Essential Services / ESS-120b00ca
Essential Services
System Status Feb 02
- Date
- 2 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| REPORT DATE - 02 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 8 | 8 | 16 | 24 | ||||||
| Baiji | Fuel Oil | 6 | 90 | 85 | 175 | 500 | ||||||
| Daura | Fuel Oil | 4 | 65 | 65 | 180 | |||||||
| South Baghdad | Fuel Oil | 6 | 30 | 30 | 200 | 4 stopped | ||||||
| Mussaibe | Crude and Fuel Oil | 4 | 200 | 200 | 190 | 190 | 780 | 860 | ||||
| Nassirya | Crude | 4 | 150 | 140 | 290 | 600 | ||||||
| Najebia | Natural Gas and Crude | 2 | 90 | 90 | 160 | |||||||
| Hartha | Natural Gas and Crude | 4 | 80 | 80 | 300 | |||||||
| Out of Service for Unscheduled Maintanence | Total: | 1,526 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date - 02 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 130 | 125 | Gas Oil | 1 stopped - comp vibration | Musil Dam Main | 4 | 4 | 500 | 600 | |
| Quds | 2 | 2 | 120 | 160 | Gas Oil | Musil Dam reg | 4 | 3 | 37 | 60 | ||
| Mosil | 12 | 9 | 147 | 150 | Musil Pumping | 2 | 1 | 110 | 0 | |||
| Dibis | 3 | 1 | 28 | 30 | Haditha Dam | 6 | 160 | |||||
| Old Mulla | 12 | 7 | 94 | 128 | Samarra | 3 | 2 | 44 | 55 | |||
| New Mulla | 6 | 3 | 103 | 173 | Himrin | 2 | 2 | 34 | 21 | |||
| Taji | 7 | 4 | 66 | 55 | Hindia | 4 | 4 | 5 | 5 | |||
| M. Taji | 2 | 2 | 8 | 18 | Kufa | 4 | 2 | 1 | 0 | |||
| Daura | 4 | 3 | 70 | 30 | 4 stopped - generator trip | Total | 731 | 896 | ||||
| Hilla | 4 | 4 | 67 | 64 | System Generation | MWh | ||||||
| Najaf | 3 | 2 | 90 | 129 | Syrian Line Generation | MWh | ||||||
| Khor | 4 | 3 | 130 | 80 | Natural Gas | Turkey Line Generation | MWh | |||||
| Shuaiba | 2 | 1 | 4 | 20 | Natural Gas | Total Generation | 87,291 | MWh | ||||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,814 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 17 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 3 | 51 | Gas Oil | Total Peak Load | 4,220 | MW | |||||
| Diesel | Gas Oil | Baghdad Load | 1,450 | MW | ||||||||
| Total | 1,144 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 22 rows; full file from the original button
| Report Date - 02 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,000 | ||
| Duhok | 82 | ||
| Naynawa | 450 | ||
| Tamim | 190 | ||
| Salah Aldeen | 175 | ||
| Anbar | 218 | ||
| Dyala | 136 | ||
| Babil | 114 | ||
| Kirbala | 131 | ||
| Najaf | 128 | ||
| Kadsya | 60 | ||
| Wasit | 115 | ||
| Muthana | 65 | ||
| Nasirya | 135 | ||
| Misan | 65 | ||
| Basra | 290 | ||
| 3,354 |