# A-Steam Power Stations
REPORT DATE - 13 DECEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 0 8 8 16 24 No.1 mnt 10 DEC to 25 JAN. No. 2 FWP.
Baiji Fuel Oil 6 3 95 85 85 0 0 0 265 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 4 tripped 2052.
Dura Fuel Oil 4 0 0 0 0 0 0 180 No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehab. No. 3 boiler leak 2213.
South Baghdad Fuel Oil 6 2 35 35 0 0 0 0 70 200 No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 3 and 4 boiler leakage.
Mussaibe Crude and Fuel Oil 4 2 200 0 0 210 410 860 No. 3 program mnt 3 NOV to 18 DEC. No. 2 problem in sealing.
Nassirya Crude 4 2 50 160 0 0 210 600 No. 3 mnt 11 NOV to 11 DEC. No. 4 boiler leak. No. 1 synch 0615.
Najebia Natural Gas and Crude 2 1 0 95 95 160 No. 4 mnt 4 NOV to 22 DEC.
Hartha Natural Gas and Crude 4 1 100 0 100 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1166 2824
# B- Gas_C-Power Stations
Report Date- 13 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil No. 2 lub oil leak. Musil Dam Main 4 3 400 600 Quds 2 2 200 160 Gas Oil 42 trucks. Musil Dam reg 4 4 35 60 450 Mosil 12 7 110 150 31 No. 1 rotor defect. No. 4 vibration. No. 2 ACC. No.3 and 8 program mnt. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 33 No. 4, 5& 6 rehab. Haditha Dam 6 2 150 160 400 Old Mulla 12 8 110 128 480 No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 HET. Samarra 3 2 63 55 New Mulla 6 4 130 173 380 No. 6 Generator Defective. No. 3 Mnt. Himrin 2 1 19 21 Taji 7 2 35 55 18 No. 5 flame. No.7 Rehabilitation. No. 2 mnt. No. 4 turbine. No. 3 compressor. Hindia 4 3 4 5 M. Taji 2 0 0 20 0 No. 1 and 2 software. Kufa 4 0 0 1 Dura 4 3 75 30 17 No.3 Rehabilitation. Total 671 896 Hilla 4 0 0 64 0 NGPL System Generation 60970 MWh Najaf 3 1 25 129 Gas Oil No. 2 program mnt. NGPL Syrian Line Generation 1196 MWh Khor 4 3 90 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 325 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 oil leak. No 2 VIB. Total Generation 62491 MWh Petro 4 0 0 0 Natural Gas System Peak Load 2604 MW M. Dibis 4 1 5 24 Natural Gas Syria Peak Load 0 MW Mossil East 5 4 20 15 Gas Oil Turkey Peak Load 0 MW Hmam/Zafranya 7 3 2 Gas Oil Fixed Gen Peak Load 77 MW Diesel 8 Total Peak Load 2681 MW Total 940 1233 Baghdad Load 1170 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 13 DECEMBER, 2003 Baghdad 1170 15 Power transferred from North to Middle 685 MW.
Duhok 35 15
Naynawa 220 15 Power transferred from South to Middle 50 MW.
Tamim 90 15
Salah Aldeen 155 15
Anbar 125 15
Dyala 50 15
Babil 70 15
Kirbala 45 15
Najaf 70 15
Kadsya 35 15
Wasit 60 15
Muthana 40 15
Nasirya 130 15
Misan 35 15
Basra 0 15
2330
MWH not provided by Ministry of Electricity
Home / Essential Services / ESS-06de17d9
Essential Services
Power System 15 dec
- Date
- 16 December 2003
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 13 rows × 13 columns
| REPORT DATE - 13 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 0 | 0 | 8 | 8 | 16 | 24 | No.1 mnt 10 DEC to 25 JAN. No. 2 FWP. | ||
| Baiji | Fuel Oil | 6 | 3 | 95 | 85 | 85 | 0 | 0 | 0 | 265 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 4 tripped 2052. |
| Dura | Fuel Oil | 4 | 0 | 0 | 0 | 0 | 0 | 0 | 180 | No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehab. No. 3 boiler leak 2213. | ||
| South Baghdad | Fuel Oil | 6 | 2 | 35 | 35 | 0 | 0 | 0 | 0 | 70 | 200 | No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 3 and 4 boiler leakage. |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 0 | 0 | 210 | 410 | 860 | No. 3 program mnt 3 NOV to 18 DEC. No. 2 problem in sealing. | ||
| Nassirya | Crude | 4 | 2 | 50 | 160 | 0 | 0 | 210 | 600 | No. 3 mnt 11 NOV to 11 DEC. No. 4 boiler leak. No. 1 synch 0615. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 95 | 95 | 160 | No. 4 mnt 4 NOV to 22 DEC. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 100 | 0 | 100 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,166 | 2,824 |
Sheet “B- Gas_C-Power Stations”: 25 rows × 13 columns
| Report Date- 13 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | Gas Oil | No. 2 lub oil leak. | Musil Dam Main | 4 | 3 | 400 | 600 | |
| Quds | 2 | 2 | 200 | 160 | Gas Oil | 42 trucks. | Musil Dam reg | 4 | 4 | 35 | 60 | 450 |
| Mosil | 12 | 7 | 110 | 150 | 31 | No. 1 rotor defect. No. 4 vibration. No. 2 ACC. No.3 and 8 program mnt. | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 33 | No. 4, 5& 6 rehab. | Haditha Dam | 6 | 2 | 150 | 160 | 400 |
| Old Mulla | 12 | 8 | 110 | 128 | 480 | No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 HET. | Samarra | 3 | 2 | 63 | 55 | |
| New Mulla | 6 | 4 | 130 | 173 | 380 | No. 6 Generator Defective. No. 3 Mnt. | Himrin | 2 | 1 | 19 | 21 | |
| Taji | 7 | 2 | 35 | 55 | 18 | No. 5 flame. No.7 Rehabilitation. No. 2 mnt. No. 4 turbine. No. 3 compressor. | Hindia | 4 | 3 | 4 | 5 | |
| M. Taji | 2 | 0 | 0 | 20 | 0 | No. 1 and 2 software. | Kufa | 4 | 0 | 0 | 1 | |
| Dura | 4 | 3 | 75 | 30 | 17 | No.3 Rehabilitation. | Total | 671 | 896 | |||
| Hilla | 4 | 0 | 0 | 64 | 0 | NGPL | System Generation | 60,970 | MWh | |||
| Najaf | 3 | 1 | 25 | 129 | Gas Oil | No. 2 program mnt. NGPL | Syrian Line Generation | 1,196 | MWh | |||
| Khor | 4 | 3 | 90 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 325 | MWh | |||
| Shuaiba | 2 | 1 | 10 | 20 | Natural Gas | No. 1 oil leak. No 2 VIB. | Total Generation | 62,491 | MWh | |||
| Petro | 4 | 0 | 0 | 0 | Natural Gas | System Peak Load | 2,604 | MW | ||||
| M. Dibis | 4 | 1 | 5 | 24 | Natural Gas | Syria Peak Load | 0 | MW | ||||
| Mossil East | 5 | 4 | 20 | 15 | Gas Oil | Turkey Peak Load | 0 | MW | ||||
| Hmam/Zafranya | 7 | 3 | 2 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Diesel | 8 | Total Peak Load | 2,681 | MW | ||||||||
| Total | 940 | 1,233 | Baghdad Load | 1,170 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 21 rows × 5 columns · preview of the first 20 rows; full file from the original button
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 13 DECEMBER, 2003 |
|---|---|---|---|---|
| Baghdad | 1,170 | 15 | Power transferred from North to Middle 685 MW. | |
| Duhok | 35 | 15 | ||
| Naynawa | 220 | 15 | Power transferred from South to Middle 50 MW. | |
| Tamim | 90 | 15 | ||
| Salah Aldeen | 155 | 15 | ||
| Anbar | 125 | 15 | ||
| Dyala | 50 | 15 | ||
| Babil | 70 | 15 | ||
| Kirbala | 45 | 15 | ||
| Najaf | 70 | 15 | ||
| Kadsya | 35 | 15 | ||
| Wasit | 60 | 15 | ||
| Muthana | 40 | 15 | ||
| Nasirya | 130 | 15 | ||
| Misan | 35 | 15 | ||
| Basra | 0 | 15 | ||
| 2,330 | ||||
| MWH not provided by Ministry of Electricity |
Highlighting search results for: