Home / US Department of Defense records / DOD-4aff9724

US Department of Defense records

05-F-2311 may health mtg

Date
Unknown
Category
US Department of Defense records
Text available
English
Source
US Department of Defense — FOIA reading room (Internet Archive)
English original PDFDownload English text
. . ,. ® Debrief nota or meedDg lleld ill the Ministry of Healtla on Saturday 14 May to coordinate tbe Fallujah Healtbcare AIRP with USD6.l million DF1 fwull t: MoH. Senior Adviser's Team 0 Healthcare lead MoH Project Director Anbar DG of Health ~=-------J~,:; M ;,:; oH Operations b)<6> MoH Primary Care 2. 1 chaired the meeting with the stated aim of identifying a clear way ahead to "make a difference" quickly in Fallujah. 3. b)(S) rtcd that Fallujah wishes to: a. Complete and unfinished PHC in AI Nazal where fitting out was halted due to military operations. The main structure is complete and the intention was to . get the original Iraqi contractor to return and complete the project using these DFI funds. b. Design and build two new construction primary healthcarc centres (PH C) at A1 Shuhadaa and Gugafee in Fallujah - ideally using a local design build contractor to ensure a speedy process that could result in both PHCs being commissioned within six months. c. Refurbish the critical systems in Fallujah hospital to the limit of the DFI funding. 4. Other issues addressed were: a. The land for the two new PHC's at Al Sbuhadaa and Gugafee is owned by other Ministries, but they were prepared to sell the plots at a cost of 4M Dinar (USD2. 7K) and 2.SM Dinar (USD 1.6K) respectively for use by the Anbar Department ofHealth. This issue would be resolved within one week of this meeting. b. The MoH agreed to provide engineers fo rust si assessments if this were formalized with ~uest from DG Anbar 6><6> greed this action. c. b)(S) ad a mobile phone which would be used to ensure good communications between the MoHIDG Anbar and tbe FIP,llujab authorities to ensure that this project was not hindered in its progress. 5. a. 130b (b 6 summarized the meeting by getting wwlimous agreement for: Anbar Department of Health providing a written proposal signed by the Director General with castings and statements of work for all the projects in paragraph 3. This document would also include confirmation that any land issues had been resolved. b. This document being hand delivered by (6) the MoH probably within three days but no later than a week. c. Convening the next meeting to coincide with Engineer delivering the document. --L.~