Home / Business / BUS-e00c54ed

Business

Renovation of Pod W-2

Date
Unknown
Category
Business
Text available
English
Files
1
English original DOCDownload English text
ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT 0001 Firm Fixed Price - Contractor shall furnish all labor, equipment, appliances, devices and materials necessary to accomplish Phase III-Renovation Brigade Buildings at KMTB in accordance with the attached drawings and specifications 0001AA Renovation of Pod W-2 1 Job $ $ 0001AB Detailed Design of: Water Treatment and Distribution, Wastewater Treatment and Collection, Centralized Power Generator and Distribution Center 1 Job $ $ 0001AC Renovation of Pod W-1 1 Job $ $ 0001AD Construction of: Water Treatment and Distribution, Wastewater Treatment and Collection, Power Generator and Distribution Center 1 Job $ $ 0001AE Renovation of Support Buildings, and the Parade Ground 1 Job $ $ DABV01-03-R-0033 PAGE 3