Sheet “load list 1”: 12 rows × 24 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | DATA SOURCE | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | Sefty factor | Over | Drawing | Data | TO | Components | ||||||||||||
| Rev | Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | ||||
| A | 1 | Incoming main circuit breaker | 400 | ESTIMATE | |||||||||||||||||||
| A | 2 | High Voltage Room | 30 | ESTIMATE | |||||||||||||||||||
| A | 3 | Lighting/Receptacles (Sockets) | 60 | ESTIMATE | |||||||||||||||||||
| A | 4 | Guard Rooms | 60 | ESTIMATE | |||||||||||||||||||
| A | 5 | Spare | 100 | ESTIMATE | |||||||||||||||||||
| A | 6 | Spare | 60 | ESTIMATE | |||||||||||||||||||
| A | 7 | Spare | 30 | ESTIMATE | |||||||||||||||||||
| 1) Provide the following MCB in the lighting cubicle: 1- 3P, 40A; 2 - 2P, 25A; 2 - 2P, 16A; 2 - 2P10A; 2 -2P, 6A | |||||||||||||||||||||||
| 2) IP 42 |
Sheet “load list 2”: 11 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | IP | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming main circuit breaker | 200 | Fed From main panel in power house. See sketch #4 | ||||||||||||||||||
| 2 | Air Circulation Fan | 5 | KW | 10 | 9 | 1 | FVNR | 20 | 2 mode operating auto- hand | ||||||||||||
| 3 | Water pump #1 | 3.50 | KW | 7 | 6 | 1 | FVNR | 15 | 2 mode operating auto- hand | ||||||||||||
| 4 | Water pump #2 | 3.50 | KW | 7 | 6 | 1 | FVNR | 15 | 2 mode operating auto- hand | ||||||||||||
| 5 | Compressor #1 | 37 | KW | 75 | 60 | 3 | Star Delta | 125 | 2 mode operating auto- hand | ||||||||||||
| 6 | Compressor #2 | 37 | KW | 75 | 60 | 3 | Star Delta | 125 | 2 mode operating auto- hand | ||||||||||||
| 7 | Spare | 30 | |||||||||||||||||||
| 8 | (Empty Cubicle) |
Sheet “load list3C”: 15 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | Safety factor | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | 90 KW Pump Motor | 90 | KW | 6 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 2 | 160 KW Pump Motor | 160 | KW | 6 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 3 | 160 KW Pump Motor | 160 | KW | 6 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 4 | 250 KW Pump Motor | 250 | KW | 7 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 5 | Spare | 250 | KW | 7 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| Specification of Main Lift Pumping Station U2 : | |||||||||||||||||||||
| 1. Provide draw-able starters (C.B + contactors + control). | |||||||||||||||||||||
| 2. Provide auto-transformer starting which give motor 35% then 75% then full voltage with all protection for motor and cables. | |||||||||||||||||||||
| 3. Provide remote start-stop. | |||||||||||||||||||||
| 4. Provide auto/off/hand selector switch, auto by water level control system. | |||||||||||||||||||||
| 5. Provide all required cable termination boxes |
Sheet “load list 3D”: 15 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | Safety factor | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | 90 KW Pump Motor | 90 | KW | 6 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 2 | 160 KW Pump Motor | 160 | KW | 6 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 3 | 160 KW Pump Motor | 160 | KW | 6 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 4 | 250 KW Pump Motor | 250 | KW | 7 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| 5 | Spare | 250 | KW | 7 | Auto-transformer | Sketch #3 | Ampmeter, voltmeter, selector switches, start/stop/fault lights and protective relaying to be included. | ||||||||||||||
| Specification of Main Lift Pumping Station U2 : | |||||||||||||||||||||
| 1. Provide draw-able starters (C.B + contactors + control). | |||||||||||||||||||||
| 2. Provide auto-transformer starting which give motor 35% then 75% then full voltage with all protection for motor and cables. | |||||||||||||||||||||
| 3. Provide remote start-stop. | |||||||||||||||||||||
| 4. Provide auto/off/hand selector switch, auto by water level control system. | |||||||||||||||||||||
| 5. Provide all required cable termination boxes |
Sheet “load list 3A”: 8 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | Safety factor | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker A | 630 | 400 | 4*150mm^2 | Sketch #3 | Ampmeter, voltmeter, selector switches, and protective relaying to be included. | |||||||||||||||
| 2 | Incoming Main Circuit Breaker B | 630 | 400 | 4*150mm^2 | Sketch #3 | Ampmeter, voltmeter, selector switches, and protective relaying to be included. | |||||||||||||||
| Specification of Main Lift Pumping Station U2 : | |||||||||||||||||||||
| 1. Provide draw-able starters (C.B + contactors + control). | |||||||||||||||||||||
| 2. Provide all required cable termination boxes. |
Sheet “load list 3B”: 9 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | Safety factor | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming MCC Circuit Breaker A | 630 | 400 | 4*150mm^2 | Sketch #3 | Ampmeter, voltmeter, selector switches, and protective relaying to be included. | |||||||||||||||
| 2 | Incoming MCC Circuit Breaker B | 630 | 400 | 4*150mm^2 | Sketch #3 | Ampmeter, voltmeter, selector switches, and protective relaying to be included. | |||||||||||||||
| 3 | Bus Tie Breaker | 630 | 400 | 4*150mm^2 | Sketch #3 | Bus tie breaker to be interlocked to avoid paralleling of incoming supply. Ampmeter, voltmeter, selector switches, and protective relaying to be included. | |||||||||||||||
| Specification of Main Lift Pumping Station U2 : | |||||||||||||||||||||
| 1. Provide draw-able starters (C.B + contactors + control). | |||||||||||||||||||||
| 2. Provide all required cable termination boxes. |
Sheet “load list 4”: 23 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker | 2,000 | Sketch #4 | Fed from TR.11.2 1MVA, transformer earth fault protection relay (50N) shall be provided in addition of breaker protection. | |||||||||||||||||
| 2 | Raw Sludge Pump Station U5 MCC | 400 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 3 | Raw Sludge Pump Station U5 MCC | 400 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 4 | Main Lift Pump Station U2 MCC Feeder A | 200 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 5 | Main Lift Pump Station U2 MCC Feeder B | 200 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 6 | Administration Building Pwr Dist Pnl | 200 | Sketch #4 | ||||||||||||||||||
| 7 | Air Chiller MCC | 200 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 8 | Raw Sludge Pump Station U5 & U6 MCC | 200 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 9 | Air Chiller Blower MCC | 100 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 10 | Detritors U4 MCC | 100 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 11 | Lighting/Receptacles | 60 | Sketch #4 | ||||||||||||||||||
| 12 | Potable Water MCC | 30 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 13 | Generator #1 | 30 | Sketch #4 | ||||||||||||||||||
| 14 | Generator #2 | 30 | Sketch #4 | ||||||||||||||||||
| 15 | Generator #3 | 30 | Sketch #4 | ||||||||||||||||||
| 16 | Grease Removal MCC | 30 | Sketch #4 | Provide ampmeter and selector switch. | |||||||||||||||||
| 17 | Spare | 200 | Sketch #4 | ||||||||||||||||||
| 18 | Spare | 100 | Sketch #4 | ||||||||||||||||||
| 19 | Spare | 100 | Sketch #4 | ||||||||||||||||||
| 20 | Spare | 30 | Sketch #4 |
Sheet “load list 5”: 146 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | sefty | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | factor | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | ||
| 1 | Incoming Circuit Breaker -Transformer TR12.1 | 2,500 | Sketch #5 | Transformer ground fault protection relay (50N) shall be provided in addition of breaker protection. Provide Voltmeter, Ampmeter and selector switches. | |||||||||||||||||
| 2 | Incoming Circuit Breaker -Transformer TR12.2 | 2,500 | Sketch #5 | Transformer ground fault protection relay (50N) shall be provided in addition of breaker protection. Provide Voltmeter, Ampmeter and selector switches. | |||||||||||||||||
| 3 | Bus Tie Circuit Breaker | 2000 | Sketch #5 | 3NO. | Bus Tie circuit breaker to be interlocked to avoid apralleling of incoming supply. Ampmeter, voltmeter, selector switches and protective relaying to be included | ||||||||||||||||
| 4 | Aeration Motor A1 | 37 | KW | 4 | FVNR | Sketch #5 | 3NO. | ||||||||||||||
| 5 | Aeration Motor A2 | 37 | KW | 4 | FVNR | Sketch #5 | 3NO. | ||||||||||||||
| 6 | Aeration Motor A3 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 7 | Aeration Motor A4 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 8 | Aeration Motor A5 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 9 | Aeration Motor B1 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 10 | Aeration Motor B2 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 11 | Aeration Motor B3 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 12 | Aeration Motor B4 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 13 | Aeration Motor B5 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 14 | Aeration Motor C1 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 15 | Aeration Motor C2 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 16 | Aeration Motor C3 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 17 | Aeration Motor C4 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 18 | Aeration Motor C5 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 19 | Aeration Motor D1 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 20 | Aeration Motor D2 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 21 | Aeration Motor D3 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 22 | Aeration Motor D4 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 23 | Aeration Motor D5 | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 24 | Spare | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 25 | Spare | 37 | KW | 4 | FVNR | Sketch #5 | |||||||||||||||
| 26 | Aeration Motor E1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 27 | Aeration Motor E2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 28 | Aeration Motor E3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 29 | Aeration Motor E4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 30 | Aeration Motor E5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 31 | Aeration Motor E6 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 32 | Aeration Motor E7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 33 | Aeration Motor E8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 34 | Aeration Motor E9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 35 | Aeration Motor E10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 36 | Aeration Motor F1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 37 | Aeration Motor F2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 38 | Aeration Motor F3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 39 | Aeration Motor F4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 40 | Aeration Motor F5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 41 | Aeration Motor F6 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 42 | Aeration Motor F7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 43 | Aeration Motor F8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 44 | Aeration Motor F9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 45 | Aeration Motor F10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 46 | Aeration Motor G1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 47 | Aeration Motor G2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 48 | Aeration Motor G3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 49 | Aeration Motor G4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 50 | Aeration Motor G5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 51 | Aeration Motor G6 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 52 | Aeration Motor G7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 53 | Aeration Motor G8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 54 | Aeration Motor G9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 55 | Aeration Motor G10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 56 | Aeration Motor H1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 57 | Aeration Motor H2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 58 | Aeration Motor H3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 59 | Aeration Motor H4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 60 | Aeration Motor H5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 61 | Aeration Motor H6 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 62 | Aeration Motor H7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 63 | Aeration Motor H8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 64 | Aeration Motor H9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 65 | Aeration Motor H10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 66 | Aeration Motor I1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 67 | Aeration Motor I2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 68 | Aeration Motor I3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 69 | Aeration Motor I4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 70 | Aeration Motor I5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 71 | Aeration Motor I6 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 72 | Aeration Motor I7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 73 | Aeration Motor I8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 74 | Aeration Motor I9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 75 | Aeration Motor I10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 76 | Aeration Motor J1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 77 | Aeration Motor J2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 78 | Aeration Motor J3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 79 | Aeration Motor J4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 80 | Aeration Motor J5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 81 | Aeration Motor J6 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 82 | Aeration Motor J7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 83 | Aeration Motor J8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 84 | Aeration Motor J9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 85 | Aeration Motor J10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 86 | Aeration Motor K1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 87 | Aeration Motor K2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 88 | Aeration Motor K3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 89 | Aeration Motor K4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 90 | Aeration Motor K5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 91 | Aeration Motor K6 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 92 | Aeration Motor K7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 93 | Aeration Motor K8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 94 | Aeration Motor K9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 95 | Aeration Motor K10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 96 | Aeration Motor L1 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 97 | Aeration Motor L2 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 98 | Aeration Motor L3 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 99 | Aeration Motor L4 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 100 | Aeration Motor L5 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 101 | Aeration Motor L6 | 2 | FVNR | Sketch #5 | |||||||||||||||||
| 102 | Aeration Motor L7 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 103 | Aeration Motor L8 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 104 | Aeration Motor L9 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 105 | Aeration Motor L10 | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 106 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 107 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 108 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 109 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 110 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 111 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 112 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 113 | Spare | 7.50 | KW | 2 | FVNR | Sketch #5 | |||||||||||||||
| 114 | Resident Engineer's Office - U24 | 100 | Sketch #5 | ||||||||||||||||||
| 115 | Mess Room - U25 | 100 | Sketch #5 | ||||||||||||||||||
| 116 | Lighting | 30 | Sketch #5 | ||||||||||||||||||
| 117 | Spare | 100 | Sketch #5 | ||||||||||||||||||
| 118 | Spare | 100 | Sketch #5 | ||||||||||||||||||
| 119 | Spare | 60 | Sketch #5 | ||||||||||||||||||
| 120 | Spare | 60 | Sketch #5 | ||||||||||||||||||
| 121 | Spare | 30 | Sketch #5 | ||||||||||||||||||
| 122 | Spare | 30 | Sketch #5 | ||||||||||||||||||
| SPECIFICATION OF AERATION CONTROL PANEL U8(OB,1B): | |||||||||||||||||||||
| 1. For all 88 unit size2 use (13-18A) over load relay. | |||||||||||||||||||||
| 2. The 88unit and 22 starters starting auto sequence group by group using timers and hand by push buttons. | |||||||||||||||||||||
| 3. For size 4 uses (65-85A) over load relay. | |||||||||||||||||||||
| 4. All the motors will use overheat P.T.C. | |||||||||||||||||||||
| 5. Use Isolating transformer for control. | |||||||||||||||||||||
| 6. All starters should have local and remote control. | |||||||||||||||||||||
| 7. Provide 88 size 2 starters and 22 size 4. | |||||||||||||||||||||
| 8. The circuit breaker air 2-2500A drawable, 1-2000A air drawable, 4-100A MCCB, 2-60A MCCB, 3-30A MCCB. | |||||||||||||||||||||
| 9. Provide the following MCB in the lighting cubicle: | |||||||||||||||||||||
| 2 - 3P, 25A | |||||||||||||||||||||
| 2 - 3P, 16A | |||||||||||||||||||||
| 3 - 2P, 25A | |||||||||||||||||||||
| 4 - 2P, 16A | |||||||||||||||||||||
| 6 - 2P, 6A | |||||||||||||||||||||
| The motors operate 24 hours continuous duty |
Sheet “load list 6”: 28 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker - Transformer TR13.1 | 2,000 | Ground fault protection relay (50N) shall be provided in addition of breaker protection. Provide voltmeter, ampmeter and selector switches. | ||||||||||||||||||
| 2 | Final Effluent Pump Motor | 85 | KW | 6 | FVNR | ||||||||||||||||
| 3 | Final Effluent Pump Motor | 85 | KW | 6 | FVNR | 3NO. | |||||||||||||||
| 4 | Final Effluent Pump Motor | 85 | KW | 6 | FVNR | ||||||||||||||||
| 5 | Final Effluent Pump Motor | 85 | KW | 6 | FVNR | ||||||||||||||||
| 6 | Final Effluent Pump Motor | 38 | KW | 4 | FVNR | 5 | |||||||||||||||
| 7 | Final Effluent Pump Motor | 38 | KW | 4 | FVNR | A | |||||||||||||||
| 8 | Return Sludge Pump Station | 400 | 5 | ||||||||||||||||||
| 9 | Lighting | 60 | 5 | ||||||||||||||||||
| 10 | Penstock Actuator | 2.50 | KW | 0 | FVR | ||||||||||||||||
| 11 | Spare | 85 | kw | 6 | FVNR | ||||||||||||||||
| 12 | Spare | 100 | |||||||||||||||||||
| 13 | Spare | 100 | |||||||||||||||||||
| 14 | Spare | 30 | |||||||||||||||||||
| Specification of final effluent P.S (OB1B) U11: | |||||||||||||||||||||
| 1. IP=41. | |||||||||||||||||||||
| 2. For starter size 0 FVR there is limit and torque switches working local and remote. | |||||||||||||||||||||
| 3. For starters size 4 FVNR and starters size 6 FVNR use star coupling starting electrolyte liquid starters, operated by push button. | |||||||||||||||||||||
| 4. Provide the following MCB in the lighting cubical. | |||||||||||||||||||||
| 2 - 3P, 25A | |||||||||||||||||||||
| 2 - 3P, 16A | |||||||||||||||||||||
| 2 - 2P, 25A | |||||||||||||||||||||
| 3 - 2P, 16A | |||||||||||||||||||||
| 5 - 2P, 6A |
Sheet “load list 7”: 17 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | sefty | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | factor | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | ||
| 1 | Incoming Main Circuit Breaker - Transformer TR14.1 | 630 | 500 | Provide voltmeter, ampmeter and selector switches | |||||||||||||||||
| 2 | Return Sludge Pump Motor #1 | 40 | KW | 3 | FVNR | ||||||||||||||||
| 3 | Return Sludge Pump Motor #2 | 40 | KW | 3 | FVNR | ||||||||||||||||
| 4 | Return Sludge Pump Motor #3 | 40 | KW | 3 | FVNR | 3NO. | |||||||||||||||
| 5 | Return Sludge Pump Motor #4 | 40 | KW | 3 | FVNR | 3NO. | |||||||||||||||
| 6 | Fan #1 | 3.50 | KW | 0 | FVNR | ||||||||||||||||
| 7 | Fan #2 | 3.50 | KW | 0 | FVNR | ||||||||||||||||
| 8 | Workshop | 100 | 5 | ||||||||||||||||||
| 9 | Warehouse | 60 | 5 | ||||||||||||||||||
| 10 | Lighting | 30 | 5 | Install MCB's in lighting cubical. 2 - 3 pole 25A, 2 - 3 pole 16A, 8 - 2 pole 6A, 3 -2 pole 25A, 2 - 2 pole 16A | |||||||||||||||||
| 11 | Sump Pump | 6 | KW | 1 | FVNR | Fu | |||||||||||||||
| 12 | Spare | 100 | |||||||||||||||||||
| 13 | Spare | 60 | |||||||||||||||||||
| 14 | Spare | 30 |
Sheet “load list 8”: 10 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker - Transformer TR31.1 | 3,200 | 3,200 | Ground fault protection relay (50N) shall be provided in addition of breaker protection. | |||||||||||||||||
| 2 | Detritor U33 | 3,200 | 3,200 | Provide voltmeter, ampmeter and selector switches. | |||||||||||||||||
| 3 | Main Lift Pump Station U33 | 3,200 | 3,200 | Provide voltmeter, ampmeter and selector switches. | |||||||||||||||||
| 4 | Lights | 60 | 30 | Provide the following MCB in the lighting cubicle: 1-3P, 25A; 2-2P, 16A; 2-2P, 10A; 1-1P, 6A | |||||||||||||||||
| 5 | Spare | 200 | 100 | ||||||||||||||||||
| 6 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 7 | Spare | 200 | 100 |
Sheet “load list 9”: 98 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | sefty | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | factor | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | ||
| 1 | Incoming Main Circuit Breaker - Transformer TR32.1 | 2500 A | Transformer ground fault protection relay (50N) shaft be provided in addition of breaker protection | ||||||||||||||||||
| 2 | Incoming Main Circuit Breaker - Transformer TR32.2 | 2000 A | Transformer ground fault protection relay (50N) shaft be provided in addition of breaker protection | ||||||||||||||||||
| 3 | Bus Tie Circuit Breaker | 2000 A | Bus Tie circuit breaker to be interlocked to avoid apralleling of incoming supply. Ampmeter, Voltmeter, selector switches and protective relaying to be included | ||||||||||||||||||
| 4 | Raw Sludge Pump Station - U37 | 400 A | 3NO. | Provide voltmeter, ampmeter and selector switch | |||||||||||||||||
| 5 | Aeration Tanks - U38 | 400 A | 3NO. | Provide voltmeter, ampmeter and selector switch | |||||||||||||||||
| 6 | Sludge Return Pump Station - U41 | 400 A | 3NO. | Provide voltmeter, ampmeter and selector switch | |||||||||||||||||
| 7 | Motor #A1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 8 | Motor # A2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 9 | Motor # A3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 10 | Motor # A4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 11 | Motor # A5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 12 | Motor # A6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 13 | Motor # B1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 14 | Motor # B2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 15 | Motor # B3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 16 | Motor # B4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 17 | Motor # B5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 18 | Motor # B6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 19 | Motor # C1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 20 | Motor # C2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 21 | Motor # C3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 22 | Motor # C4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 23 | Motor # C5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 24 | Motor # C6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 25 | Motor # D1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 26 | Motor # D2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 27 | Motor # D3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 28 | Motor # D4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 29 | Motor # D5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 30 | Motor # D6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 31 | Motor # E1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 32 | Motor # E2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 33 | Motor # E3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 34 | Motor # E4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 35 | Motor # E5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 36 | Motor # E6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 37 | Motor # F1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 38 | Motor # F2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 39 | Motor # F3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 40 | Motor # F4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 41 | Motor # F5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 42 | Motor # F6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 43 | Motor # G1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 44 | Motor # G2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 45 | Motor # G3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 46 | Motor # G4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 47 | Motor # G5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 48 | Motor # G6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 49 | Motor # H1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 50 | Motor # H2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 51 | Motor # H3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 52 | Motor # H4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 53 | Motor # H5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 54 | Motor # H6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 55 | Motor # I1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 56 | Motor # I2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 57 | Motor # I3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 58 | Motor # I4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 59 | Motor # I5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 60 | Motor # I6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 61 | Motor # J1 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 62 | Motor # J2 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 63 | Motor # J3 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 64 | Motor # J4 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 65 | Motor # J5 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 66 | Motor # J6 | 15 | KW | 2 | FVNR | ||||||||||||||||
| 67 | Spare | 15 | KW | 2 | FVNR | ||||||||||||||||
| 68 | Spare | 15 | KW | 2 | FVNR | ||||||||||||||||
| 69 | Spare | 15 | KW | 2 | FVNR | ||||||||||||||||
| 70 | Spare | 15 | KW | 2 | FVNR | ||||||||||||||||
| 71 | Spare | 15 | KW | 2 | FVNR | ||||||||||||||||
| 72 | Spare | 15 | KW | 2 | FVNR | ||||||||||||||||
| 73 | Spare | 100 A | |||||||||||||||||||
| 74 | Spare | 100 A | |||||||||||||||||||
| 75 | Spare | 100 A | |||||||||||||||||||
| 76 | Spare | 60 A | |||||||||||||||||||
| 77 | Spare | 60 A | |||||||||||||||||||
| 78 | Spare | 30 A | |||||||||||||||||||
| SPECIFICATION OF AERATION CONTROL PENAL U39 | |||||||||||||||||||||
| 1. The 66 motors are to start auto sequence group by group, using timers and hand by push buttons. | |||||||||||||||||||||
| 2. All the motors will be provided with P.T.C. | |||||||||||||||||||||
| 3. Provide Isolating transformer for control. | |||||||||||||||||||||
| 4. All starters should have local and remote control. | |||||||||||||||||||||
| 5. Provide the following MCB in the lighting cubicle: | |||||||||||||||||||||
| 2 - 3P, 25A | |||||||||||||||||||||
| 2 - 3P, 16A | |||||||||||||||||||||
| 3 - 2P, 25A | |||||||||||||||||||||
| 4 - 2P, 16A | |||||||||||||||||||||
| 6 - 2P, 6A | |||||||||||||||||||||
| Provide drawable starters | |||||||||||||||||||||
| All motors listed are of continuous duty rating |
Sheet “load list 10 ”: 29 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker - Transformer TR33.1 | 2,500 | 2,000 | Provide ground fault protection (50N) in addition to breaker protection. Provide Voltmeter, Ampmeter and selector switches | |||||||||||||||||
| 2 | Spare | 60 | 30 | ||||||||||||||||||
| 3 | Lighting | 100 | 60 | 3NO. | lighting see the MCBs | ||||||||||||||||
| 4 | Spare | 200 | 100 | ||||||||||||||||||
| 5 | Spare | 200 | 100 | ||||||||||||||||||
| 6 | Spare | 400 | 200 | ||||||||||||||||||
| 7 | Pump Motor #1 | 102 | KW | 205 | 200 | 6 | FVNR | 5 | star coupling electrolyte starter | ||||||||||||
| 8 | Pump Motor #2 | 102 | KW | 205 | 200 | 6 | FVNR | 5 | star coupling electrolyte starter | ||||||||||||
| 9 | Pump Motor #3 | 102 | KW | 205 | 200 | 6 | FVNR | 5 | star coupling electrolyte starter | ||||||||||||
| 10 | Pump Motor #4 | 102 | KW | 205 | 200 | 6 | FVNR | 5 | star coupling electrolyte starter | ||||||||||||
| 11 | Spare | 102 | KW | 205 | 200 | 6 | FVNR | 5 | star coupling electrolyte starter | ||||||||||||
| 12 | Pump Motor #6 | 45 | KW | 95 | 90 | 4 | FVNR | star coupling electrolyte starter | |||||||||||||
| 13 | Pump Motor #7 | 45 | KW | 95 | 90 | 4 | FVNR | star coupling electrolyte starter | |||||||||||||
| 14 | Penstock Actuator #1 | 3.50 | KW | 7 | 6 | 0 | FVR | ||||||||||||||
| Specification of final effluent P.S U42: | |||||||||||||||||||||
| 1. IP=42. | |||||||||||||||||||||
| 2. Starter size O-FVR has limit and torque switches working local and remote. | |||||||||||||||||||||
| 3. Starters size 4-FVNR and 6-FVNR are using star coupling starting electrolyte liquid starters working by push buttons. | |||||||||||||||||||||
| 4. Provide the following MCB in the lighting cubicle: | |||||||||||||||||||||
| 2 - 3P, 25A | |||||||||||||||||||||
| 2 - 3P, 16A | |||||||||||||||||||||
| 2 - 2P, 25A | |||||||||||||||||||||
| 3 - 2P, 16A | |||||||||||||||||||||
| 5 - 2P, 6A | |||||||||||||||||||||
| 5. Provide drawable starters |
Sheet “load list 11”: 31 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 200 | 100 | ||||||||||||||||||
| 2 | Spare | 60 | 30 | ||||||||||||||||||
| 3 | Lighting | 60 | 30 | ||||||||||||||||||
| 4 | Crane | 60 | 30 | ||||||||||||||||||
| 5 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 6 | Screen #1 | 4 | KW | 8.50 | 8 | 1 | FVR | 5 | |||||||||||||
| 7 | Screen #2 | 4 | KW | 8.50 | 8 | 1 | FVR | 5 | |||||||||||||
| 8 | Screen #3 | 4 | KW | 8.50 | 8 | 1 | FVR | 5 | |||||||||||||
| 9 | Screen #4 | 4 | KW | 8.50 | 8 | 1 | FVR | 5 | |||||||||||||
| 10 | Conveyor #1 | 1.50 | KW | 6 | 5 | 0 | FVNR | ||||||||||||||
| 11 | Conveyor #2 | 1.50 | KW | 6 | 5 | 0 | FVNR | ||||||||||||||
| 12 | Fan #1 | 2.50 | KW | 6 | 5 | 0 | FVNR | ||||||||||||||
| 13 | Fan #2 | 2.50 | KW | 6 | 5 | 0 | FVNR | ||||||||||||||
| 14 | Penstock Actuator #1 | 2 | KW | 7 | 6 | 0 | FVR | ||||||||||||||
| 15 | Penstock Actuator #2 | 2 | KW | 7 | 6 | 0 | FVR | ||||||||||||||
| 16 | Spare | 2 | KW | 7 | 6 | 0 | FVR | ||||||||||||||
| screen house U2 | |||||||||||||||||||||
| 1. There is high level of H2S and CH4 (EX) panel . | |||||||||||||||||||||
| 2. Use aluminum bus bars. | |||||||||||||||||||||
| 3. Provide the following MCB in the lighting cubicle: | |||||||||||||||||||||
| · 1 - 3P, 25A | |||||||||||||||||||||
| · 1 - 3P, 16A | |||||||||||||||||||||
| · 2 - 2P, 25A | |||||||||||||||||||||
| · 3 - 2P, 16A | |||||||||||||||||||||
| · 8 - 2P, 6A | |||||||||||||||||||||
| 4. Use side waterproof socket (3P, 30A). | |||||||||||||||||||||
| 5. The (1 FVR size) starter works in three modes [hand (push buttons)/off/Auto (pulse timers)] with high water level stop. |
Sheet “load list 12”: 57 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker #1 | 3,200 | 3,200 | Transformer ground fault protection relay (50N) shall be provided in addition of breaker protection. Provide Voltmeter, Ampmeter and selector switches. | |||||||||||||||||
| 2 | Incoming Main Circuit Breaker #2 | s | 3,200 | 3,200 | Transformer ground fault protection relay (50N) shall be provided in addition of breaker protection. Provide Voltmeter, Ampmeter and selector switches. | ||||||||||||||||
| 3 | Bus Tie Breaker | 3,200 | 3,200 | Bus Tie circuit breaker to be interlocked to avoid apralleling of incoming supply. Ampmeter, voltmeter, selector switches and protective relaying to be included | |||||||||||||||||
| 1 | Lighting | 60 | 30 | ||||||||||||||||||
| 2 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 3 | Spare | 200 | 100 | ||||||||||||||||||
| 4 | Spare | 400 | 200 | ||||||||||||||||||
| 5 | Main Lift Pump Motor #1 | 250 | KW | 520 | 500 | 7 | FVNR | 5 | |||||||||||||
| 6 | Main Lift Pump Motor #2 | 250 | KW | 520 | 500 | 7 | FVNR | 5 | |||||||||||||
| 7 | Main Lift Pump Motor #3 | 160 | KW | 325 | 315 | 6 | FVNR | ||||||||||||||
| 8 | Main Lift Pump Motor #4 | 160 | KW | 325 | 315 | 6 | FVNR | ||||||||||||||
| 9 | Main Lift Pump Motor #5 | 90 | KW | 185 | 180 | FVNR | |||||||||||||||
| 1 | Main Lift Pump Motor #6 | 160 | KW | 325 | 315 | 6 | FVNR | ||||||||||||||
| 2 | Main Lift Pump Motor #7 | 160 | KW | 325 | 315 | 6 | FVNR | ||||||||||||||
| 3 | Spare | 250 | KW | 520 | 500 | 7 | FVNR | 5 | |||||||||||||
| 4 | Spare | 250 | KW | 520 | 500 | 7 | FVNR | 5 | |||||||||||||
| 5 | Main Lift Pump Motor #8 | 90 | KW | 185 | 180 | FVNR | |||||||||||||||
| 6 | Sump Pump #1 | 15 | KW | 32 | 30 | 2 | FVNR | ||||||||||||||
| 7 | Sump Pump #2 | 15 | KW | 32 | 30 | 2 | FVNR | ||||||||||||||
| 8 | Fan #1 | 5 | KW | 10 | 8 | 1 | FVNR | ||||||||||||||
| 9 | Fan #2 | 5 | KW | 10 | 8 | 1 | FVNR | ||||||||||||||
| 10 | Actuator #1 | 0.50 | KW | FVR | |||||||||||||||||
| 11 | Actuator #2 | 0.50 | KW | FVR | |||||||||||||||||
| 12 | Actuator #3 | 0.50 | KW | FVR | |||||||||||||||||
| 13 | Actuator #4 | 0.50 | KW | FVR | |||||||||||||||||
| 14 | Actuator #5 | 0.50 | KW | FVR | |||||||||||||||||
| 15 | Actuator #6 | 0.50 | KW | FVR | |||||||||||||||||
| 16 | Actuator #7 | 0.50 | KW | FVR | |||||||||||||||||
| 17 | Actuator #8 | 0.50 | KW | FVR | |||||||||||||||||
| 18 | Actuator #9 | 0.50 | KW | FVR | |||||||||||||||||
| 19 | Actuator #10 | 0.50 | KW | FVR | |||||||||||||||||
| 20 | Actuator #11 | 0.50 | KW | FVR | |||||||||||||||||
| 21 | Actuator #12 | 0.50 | KW | FVR | |||||||||||||||||
| 22 | Actuator #13 | 0.50 | KW | FVR | |||||||||||||||||
| 23 | Actuator #14 | 0.50 | KW | FVR | |||||||||||||||||
| 24 | Actuator #15 | 0.50 | KW | FVR | |||||||||||||||||
| 25 | Actuator #16 | 0.50 | KW | FVR | |||||||||||||||||
| 26 | Actuator #17 | 0.50 | KW | FVR | |||||||||||||||||
| 27 | Actuator #18 | 0.50 | KW | FVR | |||||||||||||||||
| 28 | Actuator #19 | 0.50 | KW | FVR | |||||||||||||||||
| 29 | Actuator #20 | 0.50 | KW | FVR | |||||||||||||||||
| 30 | Main Actuator Circuit Breaker #1 | 100 | |||||||||||||||||||
| 31 | Main Actuator Circuit Breaker #2 | 100 | |||||||||||||||||||
| THE SPECIFICATION OF MAIN LIFT P.S. 2nd EXPANSION: | |||||||||||||||||||||
| 1. IP=42 | |||||||||||||||||||||
| 2. Starters size O-FVR will have limit, torque and remote switches with local control. | |||||||||||||||||||||
| 3. Starters sizes 6 & 7 will use electrolyte liquid starting (star coupling) with auto by water level control system, hand by push buttons. | |||||||||||||||||||||
| 4. The power factor correction unit will be provided and located in a separate panel and have its own control to keep the P.F. 0.95lag. | |||||||||||||||||||||
| 5. There is MMIC showing the flow, indicators and remote control operation and monitoring. | |||||||||||||||||||||
| 6. In this MCClifting station we have three (3) panels. The first is for MMIC and air C.Bs. The second is for 10 starters size O-FVR, 5 Pump starters, one sump pump starter, one fan | |||||||||||||||||||||
| 7. Provide the following MCB in the lighting cubicle: | · 3 - 3P, 25A | · 3 - 3P, 16A | · 5 - 2P, 25A | · 5 - 2P, 10A | · 2P 6A 8NO. | · 2P 2A 4NO. | |||||||||||||||
| 8. Provide drawable starters |
Sheet “load list 13”: 31 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker | 200 | 100 | ||||||||||||||||||
| 2 | Lighting | 60 | 30 | ||||||||||||||||||
| 3 | Detritor Group #2 | 100 | 60 | 3NO. | |||||||||||||||||
| 4 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 5 | Spare | 60 | 30 | ||||||||||||||||||
| 6 | Classifier #1 | 2.20 | KW | 5 | 4.50 | 0 | FVNR | 5 | |||||||||||||
| 7 | Classifier #2 | 2.20 | KW | 5 | 4.50 | 0 | FVNR | 5 | |||||||||||||
| 8 | Scraper #1 | 1.50 | KW | 3.50 | 3 | 0 | FVNR | ||||||||||||||
| 9 | Scraper #2 | 1.50 | KW | 3.50 | 3 | 0 | FVNR | ||||||||||||||
| 10 | Mixer #1 | 0.75 | KW | 2 | 1.50 | 0 | FVNR | ||||||||||||||
| 11 | Mixer #2 | 0.75 | KW | 2 | 1.50 | 0 | FVNR | ||||||||||||||
| 12 | Penstock Actuator #1 | 0.55 | KW | 1.50 | 1.25 | 0 | FVR | ||||||||||||||
| 13 | Penstock Actuator #2 | 0.55 | KW | 1.50 | 1.25 | 0 | FVR | ||||||||||||||
| 14 | Penstock Actuator #3 | 0.55 | KW | 1.50 | 1.25 | 0 | FVR | ||||||||||||||
| 15 | Penstock Actuator #4 | 0.55 | KW | 1.50 | 1.25 | 0 | FVR | ||||||||||||||
| 16 | Penstock Actuator #5 | 0.55 | KW | 1.50 | 1.25 | 0 | FVR | ||||||||||||||
| 17 | Penstock Actuator #6 | 0.55 | KW | 1.50 | 1.25 | 0 | FVR | ||||||||||||||
| 18 | Spare | 0.55 | KW | 1.50 | 1.25 | 0 | FVNR | ||||||||||||||
| SPECIFICATION OF DETRITOR GROUP1 U33: | |||||||||||||||||||||
| 1. IP=56 out door. | |||||||||||||||||||||
| 2. Starters size O-FVR are local and remote control, the starters load will have limit and torque switches. | |||||||||||||||||||||
| 3. Starters size O-FVNR will have local and remote control with three mode selector. Auto by pulse timers and hand by selector switches. | |||||||||||||||||||||
| 4. Provide the following MCB in the lighting cubicles. | |||||||||||||||||||||
| · 1 - 3P, 25A | |||||||||||||||||||||
| · 2 - 2P, 25A | |||||||||||||||||||||
| · 2 - 2P, 16A | |||||||||||||||||||||
| · 5 - 2P, 6A | |||||||||||||||||||||
| 5. The total number of starters will be 6-0 FVR and 7-O FVNR. |
Sheet “load list 14”: 31 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 2 | 200 | 100 | |||||||||||||||||
| 2 | Lighting | 2 | 60 | 30 | |||||||||||||||||
| 3 | Spare | 2.50 | 60 | 30 | |||||||||||||||||
| 4 | Spare | 100 | 60 | ||||||||||||||||||
| 5 | Classifier #1 | 2.20 | KW | 5 | 4.50 | 3 | 0 | FVNR | 5 | ||||||||||||
| 6 | Classifier #2 | 2.20 | KW | 5 | 4.50 | 3 | 0 | FVNR | 5 | ||||||||||||
| 7 | Scraper #1 | 1.50 | KW | 3.50 | 3 | 3 | 0 | FVNR | |||||||||||||
| 8 | Scraper #2 | 1.50 | KW | 3.50 | 3 | 3 | 0 | FVNR | |||||||||||||
| 9 | Mixer #1 | 0.75 | KW | 2 | 1.50 | 2.50 | 0 | FVNR | |||||||||||||
| 10 | Mixer #2 | 0.75 | KW | 2 | 1.50 | 2.50 | 0 | FVNR | |||||||||||||
| 11 | Penstock Actuator #1 | 0.55 | KW | 1.50 | 1.25 | 2.50 | 0 | FVR | Full Voltage Reversing | ||||||||||||
| 12 | Penstock Actuator #2 | 0.55 | KW | 1.50 | 1.25 | 2.50 | 0 | FVR | Full Voltage Reversing | ||||||||||||
| 13 | Penstock Actuator #3 | 0.55 | KW | 1.50 | 1.25 | 2.50 | 0 | FVR | Full Voltage Reversing | ||||||||||||
| 14 | Penstock Actuator #4 | 0.55 | KW | 1.50 | 1.25 | 2.50 | 0 | FVR | Full Voltage Reversing | ||||||||||||
| 15 | Penstock Actuator #5 | 0.55 | KW | 1.50 | 1.25 | 2.50 | 0 | FVR | Full Voltage Reversing | ||||||||||||
| 16 | Penstock Actuator #6 | 0.55 | kw | 1.50 | 1.25 | 2.50 | 0 | FVR | Full Voltage Reversing | ||||||||||||
| 17 | Spare | 0.55 | KW | 1.50 | 1.25 | 2.50 | 0 | FVNR | Full Voltage Non Reversing | ||||||||||||
| SPECIFICATION OF DETRITOR GROUP1 U33: | |||||||||||||||||||||
| 1. IP=56 out door. | |||||||||||||||||||||
| 2. Starters size O FVR are local and remote control, the starters load will have limit and torque switches. | |||||||||||||||||||||
| 3. Starters size O FVNR will have local and remote control with three mode selector auto by pulse timers hand by selector switches. | |||||||||||||||||||||
| 4. Provide the following MCB in the lighting cubicle. | |||||||||||||||||||||
| · 1 - 3P, 25A | |||||||||||||||||||||
| · 2 - 2P, 25A | |||||||||||||||||||||
| · 2 - 2P, 16A | |||||||||||||||||||||
| · 5 - 2P, 6A | |||||||||||||||||||||
| 5. Provide drawable starters |
Sheet “load list 15”: 53 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker | 400 | |||||||||||||||||||
| 2 | Lighting | 60 | 30 | ||||||||||||||||||
| 3 | Spare | 60 | 30 | ||||||||||||||||||
| 4 | Spare | 60 | 30 | ||||||||||||||||||
| 5 | Settling Tank Lights #1 | 60 | 30 | ||||||||||||||||||
| 6 | Spare | 60 | 30 | ||||||||||||||||||
| 7 | Settling Tank Group #1 Main Breaker | 100 | 60 | 3NO. | |||||||||||||||||
| 8 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 9 | Settling Tank Group #2 Main Breaker | 200 | 100 | ||||||||||||||||||
| 10 | Spare | 200 | 100 | ||||||||||||||||||
| 11 | Settling Tank Lights #2 | 60 | 30 | ||||||||||||||||||
| 12 | Settling Tank Scraper #1 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank Scraper #2 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank Scraper #3 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank Scraper #4 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank Scraper #5 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank Scraper #6 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank Scraper #7 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank Scraper #8 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Spare | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Spare | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 13 | Raw Sludge Pump #1 | 11 | KW | 23 | 22 | 2 | Star Delta | star delta | |||||||||||||
| 14 | Raw Sludge Pump #2 | 11 | KW | 23 | 22 | 2 | Star Delta | star delta | |||||||||||||
| 15 | Raw Sludge Pump #3 | 11 | KW | 23 | 22 | 2 | Star Delta | star delta | |||||||||||||
| 16 | Raw Sludge Pump #4 | 11 | KW | 23 | 22 | 2 | Star Delta | star delta | |||||||||||||
| 17 | Raw Sludge Pump #5 | 11 | KW | 23 | 22 | 2 | Star Delta | star delta | |||||||||||||
| 18 | Spare | 11 | KW | 23 | 22 | 2 | Star Delta | star delta | |||||||||||||
| 19 | Pre-Aerator #1 | 15 | KW | 32 | 30 | 2 | FVNR | ||||||||||||||
| 20 | Pre-Aerator #1 | 15 | KW | 32 | 30 | 2 | FVNR | ||||||||||||||
| 21 | Pre-Aerator #1 | 15 | KW | 32 | 30 | 2 | FVNR | ||||||||||||||
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 22 | Pre-Aerator #4 | 15 | KW | 32 | 30 | 2 | FVNR | ||||||||||||||
| 22 | Spare | 15 | KW | 32 | 30 | 2 | FVNR | ||||||||||||||
| 23 | Fan #1 | 3 | KW | 10 | 8 | 1 | FVNR | ||||||||||||||
| 24 | Fan #2 | 3 | KW | 10 | 8 | 1 | FVNR | ||||||||||||||
| SPECIFICATION OF RAW SLUDGE P.S. U37PRE AERATOR U34 SETTING TANK U35: | |||||||||||||||||||||
| 1. IP=42 | |||||||||||||||||||||
| 2. For starters size O auto by pulse timer hand by selector switches with local and remote start stop, the load will have torque switches. | |||||||||||||||||||||
| 3. For starters size 2 use star delta starter auto by water level control system hand by push buttons. | |||||||||||||||||||||
| 4. For starters size 2 FVNR use auto by pulse timers hand by selector switches with local and remote start stop. | |||||||||||||||||||||
| 5. Provide the following MCB in the lighting cubicle. | |||||||||||||||||||||
| 2 - 3P, 25A | |||||||||||||||||||||
| 2 - 3P, 16A | |||||||||||||||||||||
| 3 - 2P, 25A | |||||||||||||||||||||
| 3 - 2P, 16A | |||||||||||||||||||||
| 8 - 2P, 6A |
Sheet “load list 16”: 40 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Lights Circuit Breaker | 60 | 30 | ||||||||||||||||||
| 2 | Lights Circuit Breaker | 60 | 30 | ||||||||||||||||||
| 3 | Lights Circuit Breaker | 60 | 30 | ||||||||||||||||||
| 4 | Lights Circuit Breaker | 60 | 30 | ||||||||||||||||||
| 5 | Settling Tank Main Circuit Breaker #1 | 100 | 60 | ||||||||||||||||||
| 6 | Settling Tank Main Circuit Breaker #2 | 100 | 60 | 3NO. | |||||||||||||||||
| 7 | Spare | 60 | 30 | 3NO. | |||||||||||||||||
| 8 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 9 | Spare | 200 | 100 | ||||||||||||||||||
| 10 | Main Circuit Breaker | 600 | 400 | ||||||||||||||||||
| 11 | Settling Tank #1 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 12 | Settling Tank #2 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 13 | Settling Tank #3 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 14 | Settling Tank #4 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 15 | Settling Tank #5 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 16 | Settling Tank #6 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 17 | Settling Tank #7 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 18 | Settling Tank #8 | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 19 | Spare | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 20 | Spare | 250 | W | 0 | FVNR | 5 | |||||||||||||||
| 21 | Screw Pump #1 | 15 | KW | 2 | Star Delta | 2 speed | |||||||||||||||
| 22 | Screw Pump #2 | 15 | KW | 2 | Star Delta | 2 speed | |||||||||||||||
| 23 | Screw Pump #3 | 15 | KW | 2 | Star Delta | 2 speed | |||||||||||||||
| 24 | Screw Pump #4 | 15 | KW | 2 | Star Delta | 2 speed | |||||||||||||||
| 25 | Spare | 15 | KW | 2 | Star Delta | 2 speed | |||||||||||||||
| 26 | Sump Pump #1 | 20 | KW | 3 | FVNR | ||||||||||||||||
| 27 | Sump Pump #2 | 20 | KW | 3 | FVNR | ||||||||||||||||
| SPECIFICATION FOR RETURN SLUDGE P.S. U40 U41: | |||||||||||||||||||||
| 1. IP=42, for size O starters use, hand by selector switches, with remote and local start stop. | |||||||||||||||||||||
| 2. For size 2 star delta use hand by selector switches, auto by water level system control. | |||||||||||||||||||||
| 3. The load which is connected to the size 0 starters have torque switches. | |||||||||||||||||||||
| 4. Provide the following MCBs in the lighting cubicle. | |||||||||||||||||||||
| · 2 -3P, 23A | |||||||||||||||||||||
| · 2 - 2P, 25A | |||||||||||||||||||||
| · 5 - 2P, 6A | |||||||||||||||||||||
| 5. The starter size O 10NO.size254NO.size 3 2NO. | |||||||||||||||||||||
| 6. The motors size 15KW with two speeds and the starting will be from low to up. |
Sheet “load list 17”: 26 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 600 | 400 | ||||||||||||||||||
| 2 | Lighting | 60 | 30 | 3NO. | |||||||||||||||||
| 3 | Spare | 200 | 100 | ||||||||||||||||||
| 4 | Spare | 100 | 60 | ||||||||||||||||||
| 5 | Fan #1 | 2.50 | KW | 0 | FVNR | 5 | |||||||||||||||
| 6 | Fan #2 | 2.50 | KW | 0 | FVNR | 5 | |||||||||||||||
| 7 | Spare | 10 | 1 | FVNR | |||||||||||||||||
| 8 | Main Sludge Pump #1 | 30 | KW | 3 | FVNR | electrolyte star coupling | |||||||||||||||
| 9 | Main Sludge Pump #2 | 30 | KW | 3 | FVNR | electrolyte star coupling | |||||||||||||||
| 10 | Main Sludge Pump #3 | 30 | KW | 3 | FVNR | electrolyte star coupling | |||||||||||||||
| 11 | Main Sludge Pump #4 | 30 | KW | 3 | FVNR | electrolyte star coupling | |||||||||||||||
| 12 | Sump Pump | 4.50 | KW | 0 | FVNR | ||||||||||||||||
| 13 | Spare | 30 | KW | 3 | FVNR | electrolyte star coupling | |||||||||||||||
| SPECIFICATION OF MAIN SLUDGE P.S.U38: | |||||||||||||||||||||
| 1. IP=42, Provide drawable starters | |||||||||||||||||||||
| 2. The size 3 starters use electrolyte liquid starting (star coupling) working by auto use water level control system hand by push buttons. | |||||||||||||||||||||
| 3. Provide the following MCBs in the lighting cubicle. | |||||||||||||||||||||
| 1 - 3P, 25A | |||||||||||||||||||||
| 2 - 3P, 16A | |||||||||||||||||||||
| 2 - 2P, 25A | |||||||||||||||||||||
| 2 - 2p, 16A | |||||||||||||||||||||
| 5 - 2P, 6A |
Sheet “load list 18”: 36 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 200 | 100 | ||||||||||||||||||
| 2 | Lighting | 60 | 30 | ||||||||||||||||||
| 3 | Crane | 60 | 30 | ||||||||||||||||||
| 4 | Spare | 60 | 30 | ||||||||||||||||||
| 5 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 6 | Screen #1 | 4 | KW | 0 | FVR | 5 | |||||||||||||||
| 7 | Screen #2 | 4 | KW | 0 | FVR | 5 | |||||||||||||||
| 8 | Screen #3 | 4 | KW | 0 | FVR | 5 | |||||||||||||||
| 9 | Screen #4 | 4 | KW | 0 | FVR | 5 | |||||||||||||||
| 10 | Penstock #1 | 2 | KW | 0 | FVR | ||||||||||||||||
| 11 | Penstock #2 | 2 | KW | 0 | FVR | ||||||||||||||||
| 12 | Belt Conveyor #1 | 1.50 | KW | 0 | FVNR | ||||||||||||||||
| 13 | Belt Conveyor #2 | 1.50 | KW | 0 | FVNR | ||||||||||||||||
| 14 | Fan #1 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 15 | Fan #2 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 16 | Spare | 0 | FVR | ||||||||||||||||||
| screen house U31 | |||||||||||||||||||||
| 1. There is high level of H2S and CH4 (EX) panel . | |||||||||||||||||||||
| 2. Use aluminum bus bars. | |||||||||||||||||||||
| 3. for lighting cubical #1 Use M.C.B. as: | |||||||||||||||||||||
| · 1 - 3P, 25A | |||||||||||||||||||||
| · 1 - 3P, 16A | |||||||||||||||||||||
| · 2 - 2P, 25A | |||||||||||||||||||||
| · 3 - 2P, 16A | |||||||||||||||||||||
| · 8 - 2P, 6A | |||||||||||||||||||||
| 4. Provide side waterproof socket (3P, 30A). | |||||||||||||||||||||
| 5. The size 1 FVR starter works in three modes [hand (push buttons)/off/Auto (pulse timers)] with high water level stop. | |||||||||||||||||||||
| 6. Provide the following MCBs in the lighting cubicle. | |||||||||||||||||||||
| 1 - 3P, 25A | |||||||||||||||||||||
| 1 - 2P, 25A | |||||||||||||||||||||
| 2 - 2P, 16A | |||||||||||||||||||||
| 5 - 2P, 6A |
Sheet “load list 19”: 49 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker #1 | 200 | 200 | ||||||||||||||||||
| 2 | Main Circuit Breaker #2 | 200 | 200 | ||||||||||||||||||
| 3 | Actuators Circuit Breaker #1 | 100 | 60 | ||||||||||||||||||
| 4 | Acturators Circuit Breaker #2 | 100 | 60 | ||||||||||||||||||
| 5 | Screen Motor | 200 | 100 | ||||||||||||||||||
| 6 | Lighting/Receptacles | 60 | 30 | 3NO. | |||||||||||||||||
| 7 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 8 | Spare | 200 | 100 | 3NO. | |||||||||||||||||
| 9 | Sump Pump #1 | 12.50 | KW | FVNR | 5 | ||||||||||||||||
| 10 | Sump Pump #2 | 12.50 | KW | FVNR | 5 | ||||||||||||||||
| 11 | Fan #1 | 5 | KW | FVNR | 5 | ||||||||||||||||
| 12 | Fan #2 | 5 | KW | FVNR | |||||||||||||||||
| 13 | Spare | KW | 2 | FVNR | |||||||||||||||||
| 14 | Aeration Actuator #1 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 15 | Aeration Actuator #2 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 16 | Aeration Actuator #3 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 17 | Aeration Actuator #4 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 18 | Aeration Actuator #5 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 19 | Aeration Actuator #6 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 20 | Aeration Actuator #7 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 21 | Aeration Actuator #8 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 22 | Aeration Actuator #9 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 23 | Aeration Actuator #10 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 24 | Aeration Actuator #11 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 25 | Aeration Actuator #12 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 26 | Aeration Actuator #13 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 27 | Aeration Actuator #14 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 28 | Aeration Acturator #15 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 29 | Aeration Acturator #16 | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 30 | Spare | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 31 | Spare | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 32 | Spare | 0.50 | KW | 0 | FVR | ||||||||||||||||
| 33 | Spare | 0.50 | KW | 0 | FVR | ||||||||||||||||
| Main lift P.S U1: | |||||||||||||||||||||
| 1. IP=42 | |||||||||||||||||||||
| 2. There are 20 size 0 FVR starters with remote start/stop and limit switches and torque switches. | |||||||||||||||||||||
| 3. For sump pumps with the size2 starter provide a Ammeter. | |||||||||||||||||||||
| 4. Provide the following MCBs for the lighting cubicle. | |||||||||||||||||||||
| 2 - 3p, 25A MCB | |||||||||||||||||||||
| 1 - 3P, 16A MCB | |||||||||||||||||||||
| 3 - 2P, 25A MCB | |||||||||||||||||||||
| 2 - 2P, 16A MCB | |||||||||||||||||||||
| 6 - 2P, 6A MCB | |||||||||||||||||||||
| 5. For spare MCCB use cubical for each. | |||||||||||||||||||||
| 6. The MMIC shall have a flow (m^3), recorder, meters KV, A, KW. see the attach no.56230x207 |
Sheet “load list 21”: 33 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 200 | 100 | ||||||||||||||||||
| 2 | Lighting | 60 | 30 | ||||||||||||||||||
| 3 | Detritor 1B | 100 | 60 | 3NO. | |||||||||||||||||
| 4 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 5 | Scraper #1 | 1.50 | KW | 0 | FLNR | ||||||||||||||||
| 6 | Scraper #2 | 1.50 | KW | 0 | FLNR | ||||||||||||||||
| 7 | Classifier #1 | 2.20 | KW | 0 | FLNR | ||||||||||||||||
| 8 | Classifier #2 | 2.20 | KW | 0 | FLNR | ||||||||||||||||
| 9 | Mixer #1 | 0.75 | KW | 0 | FLNR | ||||||||||||||||
| 10 | Mixer #2 | 0.75 | KW | 0 | FLNR | ||||||||||||||||
| 11 | Spare | 3 | KW | 0 | FLNR | ||||||||||||||||
| 12 | Spare | 3 | KW | 0 | FLR | ||||||||||||||||
| 13 | Penstock Acutator #1 | 3 | KW | 0 | FLR | ||||||||||||||||
| 14 | Penstock Acutator #2 | 3 | KW | 0 | FLR | ||||||||||||||||
| 15 | Penstock Acutator #3 | 3 | KW | 0 | FLR | ||||||||||||||||
| 16 | Penstock Acutator #4 | 3 | KW | 0 | FLR | ||||||||||||||||
| 17 | Penstock Acutator #5 | 3 | KW | 0 | FLR | ||||||||||||||||
| Detritors (OB) specification: | |||||||||||||||||||||
| 1. IP=56 (out door) use aluminum bus bar. | |||||||||||||||||||||
| 2. All starters use local and remote operate. | |||||||||||||||||||||
| 3. In all starters load there are torque switches the actuators starters use limit switches. | |||||||||||||||||||||
| 4. Size O starters use hand/off/auto, hand by selector switch, and auto by pulse timer. | |||||||||||||||||||||
| 5. Provide the following MCB in the lighting cubical: | |||||||||||||||||||||
| · 1 - 3P, 25A | |||||||||||||||||||||
| · 1 - 3P, 16A | |||||||||||||||||||||
| · 3 - 2P, 16A | |||||||||||||||||||||
| · 5 - 2P, 6A | |||||||||||||||||||||
| 6. Provide drawable starters |
Sheet “load list 22”: 25 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 100 | 60 | ||||||||||||||||||
| 2 | Lighting | 60 | 30 | ||||||||||||||||||
| 3 | Spare | 60 | 30 | 3NO. | |||||||||||||||||
| 4 | Classifier | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 5 | Scrubber | 1.50 | KW | 0 | FVNR | ||||||||||||||||
| 6 | Mixer | 0.75 | KW | 0 | FVNR | ||||||||||||||||
| 7 | Spare | 4 | KW | 0 | FVR | ||||||||||||||||
| 8 | Penstock Actuator #1 | 1.50 | KW | 0 | FVR | ||||||||||||||||
| 9 | Penstock Actuator #2 | 1.50 | KW | 0 | FVR | ||||||||||||||||
| Specification of 1B detritor: | |||||||||||||||||||||
| 1. IP=56 (out door) use aluminum bas bar. | |||||||||||||||||||||
| 2. All starters using local and remote start/stop switches. | |||||||||||||||||||||
| 3. All starters using torques and limits switches. | |||||||||||||||||||||
| 4. The size O starters use hand, off, auto hand by selector switches, auto by pulse timers. | |||||||||||||||||||||
| 5. Provide drawable starters | |||||||||||||||||||||
| 6. lighting cubical use the following MBC: | |||||||||||||||||||||
| 1 - 3P, 25A | |||||||||||||||||||||
| 1 - 3P, 16 | |||||||||||||||||||||
| 1 - 2P, 25A | |||||||||||||||||||||
| 6 - 2p, 6A |
Sheet “load list 23”: 27 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | Sheet | Change | Available | REMARKS | ||||
| 1 | Main Cricuit Breaker | 100 | 60 | ||||||||||||||||||
| 2 | Spare | 60 | 30 | ||||||||||||||||||
| 3 | Lighting | 60 | 30 | 3NO. | |||||||||||||||||
| 4 | Skimmer | 1.50 | KW | 0 | FVNR | ||||||||||||||||
| 5 | Penstock Actuator #1 | 0.55 | KW | 0 | FVR | ||||||||||||||||
| 6 | Penstock Actuator #2 | 0.55 | KW | 0 | FVR | ||||||||||||||||
| Specification for grease removing U4: | |||||||||||||||||||||
| 1. IP=54 (out door). | |||||||||||||||||||||
| 2. Use aluminum bus bars. | |||||||||||||||||||||
| 3. Size 0 starters use remote hand/off/auto switch and are auto by pulse timer. | |||||||||||||||||||||
| 4. In lights cubical use MCB: | |||||||||||||||||||||
| 1 - 3P, 16A | |||||||||||||||||||||
| 1 - 2P, 16A | |||||||||||||||||||||
| 4 - 2P, 6A |
Sheet “load list 24”: 39 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 400 | 400 | ||||||||||||||||||
| 2 | Spare | 100 | 60 | ||||||||||||||||||
| 3 | Settling tank #1 lighting | 60 | 30 | ||||||||||||||||||
| 4 | Settling tank #2 lighting | 60 | 30 | ||||||||||||||||||
| 5 | Settling Tank #1 Main Circuit Breaker | 100 | 60 | ||||||||||||||||||
| 6 | Lighting | 60 | 30 | ||||||||||||||||||
| 7 | Spare | 60 | 30 | 3NO. | |||||||||||||||||
| 8 | Settling Tank #2 Main Circuit Breaker | 100 | 60 | 3NO. | |||||||||||||||||
| 9 | Spare | 200 | 100 | 3NO. | |||||||||||||||||
| 10 | Fan #1 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 11 | Fan #2 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 12 | Fan #3 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 13 | Spare | 7.50 | KW | 1 | FVNR | ||||||||||||||||
| 14 | Pump #1 | 7.50 | KW | 1 | FVNR | ||||||||||||||||
| 15 | Pump #2 | 7.50 | KW | 1 | FVNR | ||||||||||||||||
| 16 | Pump #3 | 7.50 | KW | 1 | FVNR | ||||||||||||||||
| 17 | Sump Pump | 1 | KW | 0 | FVNR | ||||||||||||||||
| 18 | Settling Tank #1 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 19 | Settling Tank #2 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 20 | Settling Tank #3 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 21 | Settling Tank #4 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 22 | Settling Tank #5 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 23 | Settling Tank #6 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 24 | Settling Tank #7 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 25 | Settling Tank #8 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 26 | Spare | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 27 | Spare | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| RAW SLUDGE P.S. OB U6 | |||||||||||||||||||||
| 1. IP=42. | |||||||||||||||||||||
| 2. Size O starters are controlled in auto mode by pulse timer and hand mode by selector switches. The load uses torque switches. | |||||||||||||||||||||
| 3. Size 1 starters are controlled in auto mode by water level control system using electrolyte liquid starter (star coupling) and in hand mode by push buttons. | |||||||||||||||||||||
| 4. In lights cubical use the following MCB: | |||||||||||||||||||||
| 1 - 3P, 25A | |||||||||||||||||||||
| 2 - 2P, 16A | |||||||||||||||||||||
| 6 - 2P, 6A |
Sheet “load list 25”: 26 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker | 400 | 400 | ||||||||||||||||||
| 2 | Spare | 200 | 100 | ||||||||||||||||||
| 3 | Lighting | 60 | 30 | ||||||||||||||||||
| 4 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 5 | Fan #1 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 6 | Fan #2 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 7 | Main Sludge Pump Motor #1 | 11 | KW | 23 | 22 | 2 | FVNR | star coupling | |||||||||||||
| 8 | Main Sludge Pump Motor #2 | 11 | KW | 23 | 22 | 2 | FVNR | star coupling | |||||||||||||
| 9 | Main Sludge Pump Motor #3 | 11 | KW | 23 | 22 | 2 | FVNR | star coupling | |||||||||||||
| 10 | Main Sludge Pump Motor #4 | 11 | KW | 23 | 22 | 2 | FVNR | star coupling | |||||||||||||
| 11 | Sump Pump | 5 | KW | 12 | 10 | 1 | FVNR | ||||||||||||||
| 12 | Spare | 11 | KW | 2 | FVNR | ||||||||||||||||
| SPECIFICATION OF MAIN SLUDGE P.S.(OB,1B): | |||||||||||||||||||||
| 1. IP=42. | |||||||||||||||||||||
| 2. The starters size 2 using electrolyte starters. | |||||||||||||||||||||
| 3. Starters (size 2) (hand by push buttons),(auto by water level control system). | |||||||||||||||||||||
| 4. For lighting cubical use: | |||||||||||||||||||||
| 2 - 3P, 25A | |||||||||||||||||||||
| 2 - 3P, 16A | |||||||||||||||||||||
| 1 - 2P, 25A | |||||||||||||||||||||
| 2 - 2P, 16A | |||||||||||||||||||||
| 6 - 2P, 6A |
Sheet “load list 26”: 26 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Incoming Main Circuit Breaker | 400 | 200 | ||||||||||||||||||
| 2 | Lighting | 60 | 30 | ||||||||||||||||||
| 2 | Spare | 60 | 30 | ||||||||||||||||||
| 3 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 4 | Settling Tank #1 | 1.10 | KW | 0 | FVNR | ||||||||||||||||
| 5 | Settling Tank #2 | 1.10 | KW | 0 | FVNR | ||||||||||||||||
| 6 | Fan #1 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 7 | Fan #2 | 2.50 | KW | 0 | FVNR | ||||||||||||||||
| 8 | Sump Pump | 4 | KW | 0 | FVNR | ||||||||||||||||
| 9 | Raw Sludge Pump Motor #1 | 11 | KW | 23 | 20 | 2 | Star Delta | ||||||||||||||
| 10 | Raw Sludge Pump Motor #2 | 11 | KW | 23 | 20 | 2 | Star Delta | ||||||||||||||
| 11 | Spare | 11 | KW | 23 | 20 | 2 | Star Delta | ||||||||||||||
| 12 | Spare | 4 | KW | 0 | FVNR | ||||||||||||||||
| RAW SLUDGE P.S.(1B) (U6+U5): | |||||||||||||||||||||
| 1) IP=42. | |||||||||||||||||||||
| 2) Size O starters working auto by pulse timer hand by selector switches, the load use torque switch. | |||||||||||||||||||||
| 3) Size 2 starters working auto by water level control system hand by push buttons. | |||||||||||||||||||||
| 4) in lights cubical use the following MCB: | |||||||||||||||||||||
| 1 - 3P, 25A | |||||||||||||||||||||
| 2 - 2P, 16A | |||||||||||||||||||||
| 6 - 2P, 6A | |||||||||||||||||||||
| 5) Add one (1) outdoor j- box with remote start/stop switches for settling tank starters. |
Sheet “load list 27”: 38 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 600 | 400 | ||||||||||||||||||
| 2 | Spare | 200 | 100 | ||||||||||||||||||
| 3 | Lighting Circuit Breaker #1 | 60 | 30 | ||||||||||||||||||
| 4 | Lighting Circuit Breaker #2 | 60 | 30 | ||||||||||||||||||
| 5 | Lighting Circuit Breaker #3 | 60 | 30 | ||||||||||||||||||
| 6 | Spare | 60 | 30 | ||||||||||||||||||
| 7 | Spare | 100 | 60 | ||||||||||||||||||
| 8 | Final Settling Tank Main Circuit Breaker | 200 | 100 | 3NO. | |||||||||||||||||
| 9 | Return Sludge Pump Motor #1 | 15 | KW | 3 | Star Delta | ||||||||||||||||
| 10 | Return Sludge Pump Motor #2 | 15 | KW | 3 | Star Delta | ||||||||||||||||
| 11 | Return Sludge Pump Motor #3 | 15 | KW | 3 | Star Delta | ||||||||||||||||
| 12 | Return Sludge Pump Motor #4 | 15 | KW | 3 | Star Delta | ||||||||||||||||
| 13 | Sump Pump #1 | 20 | KW | 3 | FVNR | ||||||||||||||||
| 14 | Sump Pump #2 | 20 | KW | 3 | FVNR | ||||||||||||||||
| 15 | Final Settling Tank #1 | 1.10 | KW | 0 | FVNR | ||||||||||||||||
| 16 | Final Settling Tank #2 | 1.10 | KW | 0 | FVNR | ||||||||||||||||
| 17 | Final Settling Tank #3 | 1.10 | KW | 0 | FVNR | ||||||||||||||||
| 18 | Final Settling Tank #4 | 1.10 | KW | 0 | FVNR | ||||||||||||||||
| 19 | Final Settling Tank #5 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 20 | Final Settling Tank #6 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 21 | Final Settling Tank #7 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 22 | Final Settling Tank #8 | 0.55 | KW | 0 | FVNR | ||||||||||||||||
| 23 | Spare | KW | 0 | FVNR | |||||||||||||||||
| 24 | Spare | KW | 0 | FVNR | |||||||||||||||||
| SPECIFICATION FOR RETURN SLUDGE P.S. U10: | |||||||||||||||||||||
| 1. IP=42. Size O starters are to operated both romote and local stop/start. | |||||||||||||||||||||
| 2. Star Delta starters operate hand by selector switch and auto by water level system control. | |||||||||||||||||||||
| 3. Lights cubical use the following MCB: | |||||||||||||||||||||
| · 2- 3P, 23A | |||||||||||||||||||||
| · 2 -2P, 25A | |||||||||||||||||||||
| · 2 - 2P, 6A | |||||||||||||||||||||
| 4. The 22KW motors shall have two speeds and the starting should be from low to high. |
Sheet “load list 28”: 12 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | safety | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | factor | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | ||
| 1 | Main Circuit Breaker | 200 | 100 | 3NO. | |||||||||||||||||
| 2 | Spare | 60 | 30 | ||||||||||||||||||
| 3 | Air Blower #1 | 15 | KW | 32 | 30 | 2.50 | 2 | Star Delta | 5 | Star delta | |||||||||||
| 4 | Air Blower #2 | 15 | KW | 32 | 30 | 2.50 | 2 | Star Delta | 5 | Star delta | |||||||||||
| Air Blower in SS11: | |||||||||||||||||||||
| 1. IP=42 | |||||||||||||||||||||
| 2. Control for the Air Blowers operate hand/off/auto hand by selector switch. Auto by pulse timer or hand individually or hand both as required. |
Sheet “load list 32”: 20 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 200 | 100 | 3NO. | |||||||||||||||||
| 2 | Lighting | 60 | 30 | 3NO. | |||||||||||||||||
| 3 | Receptacles/Sockets | 100 | 60 | 3NO. | |||||||||||||||||
| 4 | Spare | 100 | 60 | ||||||||||||||||||
| 5 | Spare | 200 | 100 | ||||||||||||||||||
| 6 | Lath | KW | 0 | FVNR | 5 | ||||||||||||||||
| 7 | Saw | KW | 0 | FVNR | 5 | ||||||||||||||||
| SPECIFICATION OF WORKSHOP U23: | |||||||||||||||||||||
| 1. IP=54. | |||||||||||||||||||||
| 2. Lighting cubical MCB: | |||||||||||||||||||||
| 4 - 3P, 25A | |||||||||||||||||||||
| 3 - 3P, 16A | |||||||||||||||||||||
| 3 - 2P, 25A | |||||||||||||||||||||
| 3 - 2p, 16A | |||||||||||||||||||||
| 8 - 2P, 6A |
Sheet “load list 33”: 17 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 1 | Main Circuit Breaker | 100 | 60 | 3NO. | |||||||||||||||||
| 2 | Lighting Circuit Breaker #1 | 60 | 30 | 3NO. | |||||||||||||||||
| 3 | Lighting Circuit Breaker #2 | 60 | 30 | 3NO. | |||||||||||||||||
| 4 | Spare | 100 | 60 | 3NO. | |||||||||||||||||
| 5 | Spare | 60 | 30 | 3NO. | |||||||||||||||||
| Specification of the warehouse panel U23:(Store) | |||||||||||||||||||||
| 1. IP=56. | |||||||||||||||||||||
| 2. The lighting cubicles have MCB: | |||||||||||||||||||||
| 2 - 3p, 25A | |||||||||||||||||||||
| 1 - 3P, 16A | |||||||||||||||||||||
| 2 - 2P, 25A | |||||||||||||||||||||
| 10 - 2P, 6A |
Sheet “load list 34”: 18 rows × 22 columns
| Nameplate | Coect. | Ope- | Starter | Breaker | Cable | Schematic | Vendor | Field | Spare | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MCC | cubicle | Engraving | Connected | rating | LRC | SF | Over | Drawing | Data | TO | Components | ||||||||||
| Cubicle | volume | (Description) | Load | FLA | FLA | Size | Type | MCP | Gnd | Load | Frame | Trip | Size | No. | Sheet | Change | Available | REMARKS | |||
| 2 | Main circuit Breaker | 100 | 60 | ||||||||||||||||||
| 3 | Lighting | 60 | 30 | 3NO. | |||||||||||||||||
| 3 | Spare | 60 | 30 | 3NO. | |||||||||||||||||
| 7 | Sump pump | 3.50 | KW | 7 | 6 | 0 | FVNR | ||||||||||||||
| 7 | Motor #1 | 7.50 | KW | 15 | 14 | 1 | FVNR | ||||||||||||||
| 7 | Motor #2 | 7.50 | KW | 15 | 14 | 1 | FVNR | ||||||||||||||
| Specification of drinking water P.S. | |||||||||||||||||||||
| 1. IP=56. | |||||||||||||||||||||
| 2. Starters are to be remotely operated. | |||||||||||||||||||||
| 3. Size 1 starters operate in auto mode by pulse timer or by hand mode individually. | |||||||||||||||||||||
| 4. Lighting cubicle | |||||||||||||||||||||
| · 1 - 3P, 25A MCB | |||||||||||||||||||||
| · 2 - 3P, 16A MCB | |||||||||||||||||||||
| · 6 - 2P, 6A MCB |