SECTION F
SECTION F - DELIVERIES OR PERFORMANCE
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation , Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATET BY REFERENCE" in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) fo FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1) TITLE NUMBER DATE STOP-WORK ORDER AUG 1989 ALTERNATE I
52.242-15
(APR 1984)
GOVERNMENT DELAY OF WORK
52.242-17
APR 1984
52.247-34
F.O.B. DESTINATION
• NOV 1991
F.2 PERIOD OF PERFORMANCE
The period of performance for this contract is the date of contract award through 12 months later.
Option Year 1 is one year after the Base Period of 12 months.
Option Year 2 is one year after the Option Year 1 period.
F.3 PERFORMANCE STANDARDS
Evaluation of the Contractor's overall performance in accordance with the performance standards set forth in Section C, and Deliverables, will be conducted jointly by the CTO and the Contracting Officer, and shall form the basis of the Contractor's permanent performance record with regard to this contract.
F.4 REPORTS AND DELIVERABLES OR OUTPUTS
In addition to the requirements set forth for submission of reports in Sections I and J and in the AIDAR clause 752.242-70, Periodic Progress Reports, the Contractor shall submit the following deliverables or outputs to the CTO specified in Section G:
See Section C.
F.5 PROGRESS REPORTING REQUIREMENTS
752.242-70 PERIODIC PROGRESS REPORTS (JUL 1998)
(a) The contractor shall prepare and submit progress reports as specified in Section C of this contract.
These reports are separate from the interim and final performance evaluation reports prepared by USAID in accordance with (48 CFR) FAR 42.15 and internal Agency procedures, but they may be used by USAID personnel or their authorized representatives when evaluating the contractor's performance.
(b) During any delay in furnishing a progress report required under this contract, the contracting officer may withhold from payment an amount not to exceed US $25,000 (or local currency equivalent) or 5 percent of the amount of this contract, whichever is less, until such time as the contracting officer determines that the delay no longer has a detrimental effect on the Government's ability to monitor the contractor's progress.
==
F-1
SECTION F
**.-
F.6 KEY PERSONNEL
A. The key personnel which the Contractor shall furnish for the performance of this contract are as follows:
Title
Name
Project Director
(b) (6)
Chief of Party
B. The personnel specified above are considered to be essential to the work being performed hereunder.
Prior to replacing any of the specified individuals, the Contractor shall immediately notify both the Contracting Officer and USAID Cognizant Technical Officer reasonably in advance and shall submit writter justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the program. No replacement of personnel shall be made by the Contractor without the written consent of the Contracting Officer.
F.7 SUBMISSION OF DEVELOPMENT EXPERIENCE DOCUMENTATION TO
PPC/CDIE/DI
USAID contractors must submit one electronic and/or one hard copy of development experience documentation (electronic copies are preferred) to the Development Experience Clearinghouse at the following address.
Dev Kent Serience Clearinghouse Arlington, VA 22209-2111 Telephone Number 703-351-4006, ext. 100 Fax Number 703-351-4039 E-mail: docsubmit@dec.cdie.org http://www.dec.org (END OF SECTION F) == F.2